HomeMy WebLinkAboutNCC191780_NOT Closeout Documents_20230815 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Division of Energy, Mineral and Land Resources
Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300
County: Harnett Project: Cubera Solar,LLC River basin: Cape Fear
Person financially responsible:Pine Gate Renewables,LLC-Patty Wright, Project#: HARNE-2020-005
Authorized Person NPDES COC:NCC191780
Address: 130 Roberts Street,Asheville,NC 28801
1. Project Location: Meadowlark Road,Dunn
Pictures: No
2. Weather and soil conditions: cloudy,workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No One Title:
Inspection report: Sent Report Date given/sent: October 30,2020
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance with the SPCA and
released.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities should be requested by the permittee via a Notice of Termination.
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Mike Lawyer Others present: Penny Markle
Date of inspection: October 29,2020 Time arriving on site: 1:52 PM Time leaving site: 1:55 PM
CC: