Loading...
HomeMy WebLinkAboutNCC191780_NOT Closeout Documents_20230815 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 County: Harnett Project: Cubera Solar,LLC River basin: Cape Fear Person financially responsible:Pine Gate Renewables,LLC-Patty Wright, Project#: HARNE-2020-005 Authorized Person NPDES COC:NCC191780 Address: 130 Roberts Street,Asheville,NC 28801 1. Project Location: Meadowlark Road,Dunn Pictures: No 2. Weather and soil conditions: cloudy,workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Title: Inspection report: Sent Report Date given/sent: October 30,2020 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance with the SPCA and released.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Mike Lawyer Others present: Penny Markle Date of inspection: October 29,2020 Time arriving on site: 1:52 PM Time leaving site: 1:55 PM CC: