Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCC232485_ESC Approval Submitted_20230817 SrA7E
} t
K,nv xo.oiy�
ROY COOPER '6 % - �pl''),1
Governor C
ELIZABETH S.BISER ' ����_��� .4`
Secretary """v'
BRIAN WRENN NORTH CAROLINA
Director Environmental Quality
March 11,2022
LETTER OF APPROVAL
Express Option
McKee Homes,LLC
Attn: Nicole Oleson,Preconstruction Coordinator
4208 Six Forks Road, Suite 810
Raleigh,NC 27609
RE: Project Name: Timberland Farms -Lots 9, 12,25,26,42, 54, 55 & 56
Acres Approved: 5.99
Project: HOKE-2022-031
County: Hoke, City: Quewhiffle , Address: Rocking Horse, Sweet Grass, Turkey Trot
River Basin: Cape Fear
Stream Classification: Other
Submitted By: Averette Engineering Co.,P.A.
Date Received by LQS: March 11,2022
Plan Type: Express
Dear Ms. Oleson:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted
at the job site. This plan shall expire three(3)years following the date of approval, if no land disturbing
activity has been undertaken, as required by Title 15A NCAC 4B.0129.
This letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure
compliance with the approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file
at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project,it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this
office may require revisions to the plan and implementation of the revisions to ensure compliance with
the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws,regulations,and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
01,
Fayetteville Regional Office 1225 Green Street,Suite 714 I Fayetteville,North Carolina 28301
NORTH CAROUNA
Del.Immt of Environmental Uu9ILLY 910.433.3300
Letter of Approval
McKee Homes,LLCPiedmont Natural Gas Company, Inc..
March 11,2022
Page 2 of 2
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form,which you provided.You are requested to file an amended form if there is any
change in the information included on the form. This permit allows for a land-disturbance, as called for
on the application plan,not to exceed the approved acres. Exceeding the acreage will be a violation of
this permit and would require a revised plan and additional application fee.In addition,it would be
helpful if you notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
"f oud.
V Jodi Pace, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
cc: Mike Averette,Averette Engineering Co.,P.A. (electronic copy)
Andy Connor, Chief Inspector(electronic copy)
DEMLR-Fayetteville Regional Office File