Loading...
HomeMy WebLinkAboutNCG030733_Cover Letter (Signed)_20230815 d vf.STATEo- ROY COOPER - Governor }+ � ELIZABETHS.RISER Secretary DOUGLAS R.ANSEL NORTH CAROLINA lnterfrnDirector Environmental Quality August 15, 2023 Technibilt,LTD- DBA Wanzl Attn: Kelli Daniels 700 Technibilt Drive Newton,NC 28658 Subject: General Permit No.NCG030000 700 Technibilt Drive CDC No. NCG030733 Catawba County Dear Kelli Daniels: In accordance with your application for ar discharge permit received on October 18,2022,we are forwarding herewith the subject certificate of coverage (COC)to discharge under the subject state- NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). In order to comply with the conditions of NCG030000 to which you are now subject,you are required to do the following: ➢ Implement a SWPPP before beginning operations. ➢ Download and print a copy of the NCG030000 Permit from the General Permits page on the NPDES Industrial Stormwater Program web site,which can be reached by typing "deq.nc.gov/SW-industrial' into your browser and hitting enter. ➢ When you receive an invoice for your annual permit fee each year,pay it promptly. Electronic payment is convenient and quick,you can access the ePayment web site by typing"deq.nc.gov/SW-ePayments"into your browser and hitting enter. ➢ If you have not already enrolled in electronic Data Monitoring Reports (eDMR),view the six step process and complete the registration by typing"deq.nc.gov/SW-eDMR" into your browser and hitting enter. ➢ Keep information about your facility name, ownership,legally responsible person, address, and stormwater outfalls up to date. See the Industrial Stormwater Program web site for instructions. ➢ Per the requirements of the Catawba Riparian (streamside) Buffer Rule (15A NCAC 02B.0243),all stormwater runoff into the riparian buffer shall meet dispersed flow requirements of 15A NCAC 021-1 .1002 for portions of the project built after June 30, 2001. Also,drainage conveyances (drainage ditches,roadside ditches, and stormwater North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 11612 Mail Service Center I Raleigh,North Carolina 27699-1612 / 919707.9200 conveyances)through riparian buffer must meet requirements of the Catawba Riparian buffer rules,per 15A NCAC 026.0243. Please take notice that this certificate of coverage is not transferable except upon approval from the Division of Energy, Mineral, and Land Resources (Division). The Division may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Resources,the Coastal Area Management Act,or any other federal or local government permit that may be required. If you have any questions concerning this permit,please contact Brittany Cook at(919) 707-3648 or by email at brittany.cookftncdenr.gov. Sincerely, Brittany Cook NPDES Stormwater General Permit Coordinator Division of Energy, Mineral,and Land Resources cc: Mooresville Regional Office /Z. Khan CJ — North Carolina Department of Environmental Quality i Division of Energy,Mineral and Land Resources � 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 2 76 99-1 612 < <^°� 919.707.9200