HomeMy WebLinkAbout20220343 Ver 1_Certification of Completion_20230505ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
S. DANIEL SMITH
Director
\�� WAMV1114P�
NORTH CAROLINA
� Environmental Quality
W` 3H3
5f.k-10
WR Project No.: /010V County:
_;4 CYIS On/
Water Quality Regional Operations
Asheville Regional Office
Applicant: `� �fi-o++ ► �}S �r ,
Project Name: �iv� _43E1q2 AK 19 19 ON) %—btc.(f- S- � ee
Date of Issuance of 401 Water Quality Certification: `i ,i 0 02
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and
Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh,
NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, /p� ���✓ , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved pla7l pecifi r supporting materi
Signature: Date: ail S �¢
/ XT
Tl���
Agent's Cer ' rcati
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to
the best of my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance and intent of the 401 Water Quality
Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date
Registration No.
D.
� tn�iiil ail L�iri,��nmtv�inl i1W1i1Y
North Carolina Department of Environmental Quality I Division of Water Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 SwannanoA, North Carolina 28778
828.296.4500