Loading...
HomeMy WebLinkAbout20150690 Ver 1_Application_20150715(V e r s i o n 1 . 2 ; R e l e a s e d J u l y 2 0 1 2 ) DB 9 - 2 8 0 4 2 4 Co u n t y ( i e s ) : Da v i d s o n Page 1of 1 Pr o j e c t T y p e : D a t e : Ph o n e : Ph o n e : Em a i l : Em a i l : Co u n t y ( i e s ) : CA M A C o u n t y ? De s i g n / F u t u r e : Ex i s t i n g : Su r r o u n d i n g L a n d U s e : Ne i g h b o r h o o d R e s i d e n t i a l , B u s i n e s s 0. 1 4 5 M i l e s 78 0 0 1. 2 7 Pr o j e c t B u i l t - U p o n A r e a ( a c . ) Pr o p o s e d P r o j e c t E x i s t i n g S i t e Pr o j e c t L e n g t h ( l i n . M i l e s o r f e e t ) : Bu f f e r R u l e s i n E f f e c t Pr o j e c t D e s c r i p t i o n No n e No No n e NC D W Q S u r f a c e W a t e r C l a s s i f i c a t i o n f o r P r i m a r y R e c e i v i n g W a t e r 30 3 ( d ) I m p a i r m e n t s : Ri v e r B a s i n ( s ) : Pr i m a r y R e c e i v i n g W a t e r : Cl a s s C Ot h e r S t r e a m C l a s s i f i c a t i o n : Su n g a t e D e s i g n G r o u p , P A Ci t y / T o w n : (9 1 9 ) 8 5 9 - 2 2 4 3 15 9 0 M a i l S e r v i c e C e n t e r Ad d r e s s : Le x i n g t o n (9 1 9 ) 7 0 7 - 6 7 1 1 Da v i d s o n ac. Ge n e r a l P r o j e c t N a r r a t i v e : Th i s p r o j e c t i n v o l v e s t h e r e p l a c e m e n t o f B r i d g e N o . 2 8 0 4 2 4 o v e r N C 8 a n d D a r r B r a n c h o n S R 1 2 4 3 ( E . C e n t e r S t r e e t ) i n D a v i d s o n County, NC. This bridge replacement and th e a s s o c i a t e d r o a d w a y i m p r o v e m e n t s h a v e b e e n d e s i g n e d i n a m a n n e r t h a t m i n i z e s t h e i n c r e a s e i n i m p e r v i o u s s u r f a c e a r e a . T h e p r oposed bridge does not include deck dr a i n s . S t o r m w a t e r o r i g i n a t i n g s o u t h o f t h e b r i d g e w i l l b e c o l l e c t e d i n c u r b a n d g u t t e r , c a p u t e r e d w i t h i n l e t s , a n d c o n v e y e d t o t h e s o u t h e a s t s i d e o f t h e r o a d b y r i p r a p l i n e d d i t c h to b e d i s c h a r g e d i n t o t h e s t r e a m . S t o r m w a t e r o r i g i n a t i n g n o r t h o f t h e b r i d g e a n d t h e n o r t h w e s t r a m p w i l l b e c o l l e c t e d i n c u r b a nd g u t t e r , c a p t u r e d w i t h i n l e t s , a n d c o n v e y e d t o th e n o r t h w e s t s i d e o f t h e r o a d t o b e d i s c h a r g e d i n t o a n e x i s t i n g g r as s e d s w a l e . S t o r m w a t e r o r i g i n a t i n g o n t h e n o r t h e a s t r a m p w i ll b e c o n v e y e d t o t h e n o r t h e a s t s i d e o f t h e r o a d in t o a n e x i s t i n g s t o r m w a t e r s y s t e m . D u e t o t h e e x i s t i n g c o n s tr a i n t s w i t h i n t h e p r o j e c t b o u n d s a n d a n d t h e h i g h d e g r e e o f e l e v a t io n c h a n g e b e t w e e n S R 1 2 4 3 a n d D a r r B r a n c h , st o r m w a t e r c o n v e y a n c e s o n t h e p r o j e c t w i l l n o t m e e t t r e a t m e n t c r i t e r i a . T h e c u l v e r t c a r r y i n g D a r r B r a n c h u n d e r t h e e x i s t i n g b r i dg e a n d a d j a c e n t t o N C 8 w i l l b e r e m o v e d a n d re p l a c e d w i t h a 1 0 ' b a s e d i t c h wi t h 2 : 1 s i d e s , a 1 0 ' b e r m , a n d C l a s s I r i p r a p o n t h e b a n k s o n l y . Ty p i c a l C r o s s S e c t i o n D e s c r i p t i o n : Re f e r e n c e s 1. 3 4 Av e r a g e D a i l y T r a f f i c ( v e h / h r / d a y ) : ac . No r t h C a r o l i n a D e p a r t m e n t o f T r a n s p o r t a t i o n Hi g h w a y S t o r m w a t e r P r o g r a m S T O R M W A T E R M A N A G E M E N T P L A N FO R L I N E A R R O A D W A Y P R O J E C T S Ga l e n C a i l , P E Br i d g e R e p l a c e m e n t Ge n e r a l P r o j e c t I n f o r m a t i o n Ad d r e s s : 3/12/2015 91 5 J o n e s F r a n k l i n R o a d Ra l e i g h , N C 2 7 6 9 9 - 1 5 9 0 Ra l e i g h , N C 2 7 6 0 6 Pr o j e c t / T I P N o . : NC D O T C o n t a c t : Pr o j e c t N o . : DB 9 - 2 8 0 4 2 4 Co n t r a c t o r / D e s i g n e r : gc a i l @ n c d o t . g o v Ya d k i n - P e e D e e 12 - 1 1 9 - ( 6 ) jd a l t o n @ s u n g a t e d e s i g n . c o m Th r e e 1 2 ' l a n e s , 2 . 5 ' C u r b a n d Gu t t e r T h r e e 1 2 ' l a n e s , 6 " C u r b N/ A NC D W Q S t r e a m I n d e x N o . : Su p p l e m e n t a l : No n e Pr i m a r y : Da r r B r a n c h C O N T R A C T : -L- C E. CENTER STREET SR 1243 D A R R B R A N C H T A L B E R T A V E N U E -R P A - - R P B- -R P C - B AD TO MAIN STREET P R O J E C T : C 2 0 2 9 7 8 MATCH EXISTING -RPC- POT STA. 10+40.00 BEGIN CONSTRUCTION MATCH EXISTING -RPB- POT STA. 10+00.00 BEGIN CONSTRUCTION MATCH EXISTING -RPA- POT STA. 10+00.00 BEGIN CONSTRUCTION VICINITY MAP BEGIN PROJECT V = =MPH ADT FUNC CLASS = SUB-REGIONAL TIER PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK: 0 9 / 0 8 / 9 9 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA $ $ $ $ $ $ S Y S T IM E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ D E P A R T MEN T O F TRA N SPORTA T IO N S T A TEOFNORT H CAR O LI N A = = = MICHAEL D. LINDGREN, PE MICHAEL B. LITTLEFIELD, PE Ce nter M ainSt.HollyGroveRd.5th Ave.W estCenterStreet5thStreet T alb ert A v e . C o t t o n G r o v e N.T.S. RIGHT OF WAY DATE: LETTING DATE: 0.113 MI.LENGTH OF ROADWAY T.I.P. PROJECT DB9-280424 LENGTH OF STRUCTURE T.I.P. PROJECT DB9-280424 0.032 MI 0.145 MI 40 2030 DAVIDSON COUNTY BRIDGE #424 PROJECTEND TOTAL LENGTH OF T.I.P. PROJECT DB9-280424 11000 ARTERIAL F a ir v ie w D r . St. NCDOT CONTACT: TRANSPORTATION PROGRAM MANAGEMENT UNIT GRADING, PAVING, DRAINAGE, AND STRUCTURE 2203 1 2 4 3 2206 SR 2205 SR 3346 LEXINGTON OVER NC 8 (S. TALBERT BLVD.) & DARR BRANCH BRIDGE NO. 424 ON SR 1243 (E. CENTER STREET) K. ZAK HAMIDI, PE APRIL 17, 2012 APRIL 17, 2012 TO I-85 -L- STA. 16+28.73 BEGIN BRIDGE -L- STA. 17+96.40 END BRIDGE WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 1 OF 5 PERMIT DRAWING ROW/ UTIL. CONST. PE OFF SITE DETOUR 8 S 8 8 S 8 8 DB9-280424 DB9-280424 D B 9 - 2 8 0 4 2 4 -L- POT STA. 13+92.00 BEGIN PROJECT DB9-280424 -L- POC STA. 21+55.00 END PROJECT DB9-280424 10 20 4020 10 20 4020 2 4 84 0 0 0 PROFILE (HORIZONTAL) PLANS PROFILE (VERTICAL) 0 00 RAILWAY A b b o t t s Creek FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PREPARED IN THE OFFICE OF: 801 Jones Franklin Road, Suite 300 Stantec Consulting Inc. Raleigh, NC U.S.A. 27606 2012 STANDARD SPECIFICATIONS Fax. (919) 851-7024 www.stantec.com Tel. (919) 851-6866 NAD 83 WETLAND AND SURFACE WATER IMPACTS PERMIT 1- 8 x 7 B A R R E L S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET 2 OF 5 PERMIT DRAWING 4 NOTE: FDPS = FULL DEPTH PAVED SHOULDER S E E S H E E T 5 M A T C H L I N E - L - S T A . 18 + 3 0 . 0 0 SEE DETAIL - SHEET 2 TO THE EXISTING ASPHALT PAVEMENT. TIE IN TO PROVIDE A SMOOTH TRANSITION INCIDENTAL MILL AT EACH LATERAL ’V’ DITCH ( Not to Scale) 2: 1 2:1 D b d 1"/Ft. FROM STA. 15+42 TO STA. 16+15 -L- RT Slope Fill Type of Liner= Class 1 Rip-Rap b=5.0 Ft. Max. d=2.0 Ft. Min. D=2.0 Ft. DETAIL 2 Ground Natural Geotextile 2:12: 1 D ( Not to Scale) d STANDARD ’V’ DITCH FROM STA. 16+15 TO STA. 16+94 -L- RT Type of Liner= Class 1 Rip-Rap Max. d= 2.0 Ft. Min. D= 2.0 Ft. DETAIL 3 Ground Natural Ground Natural Geotextile ( Not to Scale) RIP RAP AT EMBANKMENT FROM STA. 16+87 TO STA. 17+00 -L- RT DETAIL 4 Grade Ditch 1.0’ GEOTEXTILE Geotextile= 9 sy Type of Liner= 5 TONS, CL I Rip-Rap 1.0’min. 1.0’min. LATERAL BASE DITCH 2: 1 2:1 b d D B ( Not to Scale) 0.08 FT/FT FROM STA. 17+13 TO STA. 18+85 -Y- RT DETAIL 1 b= 10 Ft. B= 10 Ft. Max. d= 7.0 Ft. Min. D= 7.0 Ft. Std. No. 876.01 *When B is > 6.0’- Type of Liner= Class I Rip-Rap Ground Natural Slope Fill Geotextile R E V IS I O N S SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8 / 1 7 / 9 9 3 / 12 / 2 0 15 2 8 0 4 2 4 _ H y d _ p r m _ w e t _ p s h 0 4 . d g n b s m i t h Structure No. 280424 DB9-280424 48" CONC WOODS WOODS E O T BST E OT EOT M O R G A N D R. 1SFBUS E. CENTER ST. S.R. 1243 66" CONC 66" CONC 1SBKBUS 19 ’ B S T 2 6 ’ B S T 2 6 ’ B S T18’ BST 12" RCP 18" RCP 12" R C P DIANE FAW SHAW HOMES & SERVICES UNITED CHURCH PROPERTIES CENTRAL CAROLINA E XIS TI N G R/ W EXISTING R/ W R /W E X IS T IN G 15 " P V C 8" VC T 8 " V C 1 5 " P V C APPROXIMATE L O C A T I O N 6" VC L O C A TI O N A P P R O X. 15 " P V C W/LT 11 W/LT 13 CRCR CR 15+00 PO T St a. 10+00. 00 -RPC- POT Sta. 11+72.69 -L- POT STA. 15+41.39 = -L- - Y - MATCH EXISTING -L- POT STA. 13+92.00 BEGIN CONSTRUCTION BEGIN PROJECT - R P C- T A L B E R T B L V D . SR 1243 E. CENTER STREET D C B A MATCH EXISTING -RPC- POT STA. 10+40.00 BEGIN CONSTRUCTION 11+ 0 0 S D A R R B R A N C H CB CB CB CB CB CB EST 5 SY GF EST 1 TON CL B RIP RAP RETAIN 15" RCP-IV RETAIN REPLACE REMOVE AND 18" RCP-IV 18" RCP-IV n= 0.055 s= 0.085 d= 1.1 FT V= 4.9 FT/S Q= 11.4 CFS Sta.= 16+94 -L- RETAIN REPLACE REMOVE AND SEE DETAIL 4 AT EMBANKMENT CLASS I RIP RAP SEE DETAIL 2 CLASS 1 RIP RAP LAT V-DITCH SEE DETAIL 3 CLASS 1 RIP RAP STANDARD V-DITCH CB 15" RCP-IV TO BE REMOVED EXISTING 8’x7’ RCBC SEE DETAIL #1 ON BANKS ONLY W/ CLASS I RIP RAP LAT 10’ BASE DITCH TO SHOULDER POINT CLASS II RIP RAP MATTING FIBER COIR 15" RCP-IV 1 8 " R C P - II I 18 " CB w/MH TB JB 18" RCP-IV 10 20 40200 PLANS F F F F F F FFC C F F F F F F F F SHEET 3 OF 5 PERMIT DRAWING 6 6 9 6 6 9 6 7 0 6 7 0 6 7 1 671 6 7 1 6 7 2 6 7 2 6 7 2 6 7 2 6 7 3 6 7 3 673 6 7 3 6 7 3 6 7 4 6 7 4 6 7 4 6 7 4 6 7 4 6 7 5 6 7 5 6 7 5 6 7 5 6 7 5 6 7 5 6 7 5 6 7 5 6 7 6 6 7 6 6 7 6 6 7 6 6 7 6 6 7 7 6 7 7 6 7 7 6 7 7 6 7 7 6 7 7 6 7 8 6 7 8 6 7 8 6 7 8 6 7 8 6 7 8 6 7 8 6 7 9 6 7 9 6 7 9 6 7 9 6 7 9 679 6 7 9 6 8 0 6 8 0 6 8 0 6 8 0 6 8 0 6 8 0 680 680 680 6 8 0 680 6 8 0 6 8 0 6 8 0 6 8 0 6 8 0 681 6 8 1 6 8 1 681 681 6 8 1 6 8 2 6 8 2 6 8 2 6 8 2 6 8 2 6 8 2 683 6 8 3 683 683 6 8 4 684 684 6 8 4 684 6 8 5 6 8 5 6 8 5 685 6 8 5 6 8 5 6 8 5 685 685 6 8 6 6 8 6 6 8 6 6 8 6 6 8 6 687 687 6 8 7 6 8 7 687 688 688 688 6 8 8 688 6 8 8 689 6 8 9 6 8 9 6 8 9 6 8 9 690 6 9 0 6 9 0 690 690 6 9 0 690 690 6 9 0 691 691 691 691 6 9 1 692 692 6 9 2 692 6 9 2 693 693 6 9 3 693 693 6 9 3 694 6 9 4 694 694 6 9 5 695 695 6 9 5695 6 9 5 6 9 5 6 9 5 696 6 9 6 6 9 6 697 6 9 7 697 6 9 7 697 698 698 698 698 698 699 699 6 9 9 699 699 6 9 9 700 700 7 0 0 7 0 0 7 0 0 700 701 7 0 1 7 0 1 7 0 2 7 0 2 7 0 3 704 7 0 4 705 705706707 WETLAND AND SURFACE WATER IMPACTS PERMIT 1- 8 x 7 B A R R E L S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY 4 NOTE: FDPS = FULL DEPTH PAVED SHOULDER S E E S H E E T 5 M A T C H L I N E - L - S T A . 18 + 3 0 . 0 0 SEE DETAIL - SHEET 2 TO THE EXISTING ASPHALT PAVEMENT. TIE IN TO PROVIDE A SMOOTH TRANSITION INCIDENTAL MILL AT EACH LATERAL ’V’ DITCH ( Not to Scale) 2: 1 2:1 D b d 1"/Ft. FROM STA. 15+42 TO STA. 16+15 -L- RT Slope Fill Type of Liner= Class 1 Rip-Rap b=5.0 Ft. Max. d=2.0 Ft. Min. D=2.0 Ft. DETAIL 2 Ground Natural Geotextile 2:12: 1 D ( Not to Scale) d STANDARD ’V’ DITCH FROM STA. 16+15 TO STA. 16+94 -L- RT Type of Liner= Class 1 Rip-Rap Max. d= 2.0 Ft. Min. D= 2.0 Ft. DETAIL 3 Ground Natural Ground Natural Geotextile ( Not to Scale) RIP RAP AT EMBANKMENT FROM STA. 16+87 TO STA. 17+00 -L- RT DETAIL 4 Grade Ditch 1.0’ GEOTEXTILE Geotextile= 9 sy Type of Liner= 5 TONS, CL I Rip-Rap 1.0’min. 1.0’min. LATERAL BASE DITCH 2: 1 2:1 b d D B ( Not to Scale) 0.08 FT/FT FROM STA. 17+13 TO STA. 18+85 -Y- RT DETAIL 1 b= 10 Ft. B= 10 Ft. Max. d= 7.0 Ft. Min. D= 7.0 Ft. Std. No. 876.01 *When B is > 6.0’- Type of Liner= Class I Rip-Rap Ground Natural Slope Fill Geotextile R E V IS I O N S SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8 / 1 7 / 9 9 3 / 12 / 2 0 15 2 8 0 4 2 4 _ H y d _ p r m _ w e t _ p s h 0 4 _ c o n . d g n b s m i t h Structure No. 280424 DB9-280424 48" CONC WOODS WOODS E O T BST E OT EOT M O R G A N D R. 1SFBUS E. CENTER ST. S.R. 1243 66" CONC 66" CONC 1SBKBUS 19 ’ B S T 2 6 ’ B S T 2 6 ’ B S T18’ BST 12" RCP 18" RCP 12" R C P DIANE FAW SHAW HOMES & SERVICES UNITED CHURCH PROPERTIES CENTRAL CAROLINA E XIS TI N G R/ W EXISTING R/ W R /W E X IS T IN G 15 " P V C 8" VC T 8 " V C 1 5 " P V C APPROXIMATE L O C A T I O N 6" VC L O C A TI O N A P P R O X. 15 " P V C W/LT W/LT CRCR CR 15+00 PO T St a. 10+00. 00 -RPC- POT Sta. 11+72.69 -L- POT STA. 15+41.39 = -L- - Y - MATCH EXISTING -L- POT STA. 13+92.00 BEGIN CONSTRUCTION BEGIN PROJECT - R P C- T A L B E R T B L V D . SR 1243 E. CENTER STREET D C B A MATCH EXISTING -RPC- POT STA. 10+40.00 BEGIN CONSTRUCTION 11+ 0 0 S D A R R B R A N C H CB CB CB CB CB CB EST 5 SY GF EST 1 TON CL B RIP RAP RETAIN 15" RCP-IV RETAIN REPLACE REMOVE AND 18" RCP-IV 18" RCP-IV n= 0.055 s= 0.085 d= 1.1 FT V= 4.9 FT/S Q= 11.4 CFS Sta.= 16+94 -L- RETAIN REPLACE REMOVE AND SEE DETAIL 4 AT EMBANKMENT CLASS I RIP RAP SEE DETAIL 2 CLASS 1 RIP RAP LAT V-DITCH SEE DETAIL 3 CLASS 1 RIP RAP STANDARD V-DITCH CB 15" RCP-IV TO BE REMOVED EXISTING 8’x7’ RCBC SEE DETAIL #1 ON BANKS ONLY W/ CLASS I RIP RAP LAT 10’ BASE DITCH TO SHOULDER POINT CLASS II RIP RAP MATTING FIBER COIR 15" RCP-IV 1 8 " R C P - II I 18 " CB w/MH TB JB 18" RCP-IV 10 20 40200 PLANS F F F F F F FFC C F F F F F F F F 7 SHEET 4 OF 5 PERMIT DRAWING R E V IS I O N S SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8 / 1 7 / 9 9 $ $ $ $ $ $ S Y S T IM E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ Structure No. 280424 DB9-280424 -L- 680 684 688 692 696 14+00 15+00 16+00 17+00 18+00 680 684 688 692 696 700 704 708 712 680 684 688 692 696 700 704 708 712 19+00 20+00 21+00 22+00 23+00 -L- 676 672 696 692 688 684 680 676 672 700 704 18+40 18+40 EL. 709.09 -L- POT 21+55.00 END GRADE EXISTING GROUND PROPOSED GRADE 65’ (3" AT END GRADE) MILL 0" TO 3" -RPB- -RPA- DS = 35mph PI = 19+90.00 EL = 700.60’ (-)0.8000%(+)5.1455% VC = 295’ K = 50 EL. 698.06 -L- POC 13+92.00 BEGIN GRADE EXISTING GROUND PROPOSED GRADE 65’ (3" AT BEGIN GRADE) MILL 0" TO 3" -RPC- DS = 40mph DS = 40mph PI = 14+65.00 EL = 697.83’ (-)0.3151%(+)1.7345% VC = 135’ K = 66 PI = 17+40.00 EL = 702.60’ (+)1.7345%(-)0.8000% VC = 120’ K = 47 MSE WALL VERTICAL ABUTMENT 4/10/13 = 671.7 NWSE AND WSE ON MSE WALL VERTICAL ABUTMENT 8’x7’ RCBC EXISTING 4/10/13 = 671.7 NWSE AND WSE ON Ha n d Existing Existing Pe r m a n e n t T e m p . E x c a v a t i o n M e c h a n i z e d C l e a r i n g P e r m a n e n t T e m p . C h a n n e l C h a n n e l N a t u r a l Si t e S t a t i o n S t r u c t u r e F i l l I n F i l l I n i n C l e a r i n g i n S W S W I m p a c t s I m p a c t s S t r e a m No . ( F r o m / T o ) S i z e / T y p e W e t l a n d s W e t l a n d s W e t l a n d s i n W e t l a n d s W e t l a n d s i m p a c t s i m p a c t s P e r m a n e n t T e m p . D e s i g n ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( f t ) ( f t ) ( f t ) 1 6 + 7 9 T O 1 7 + 1 7 - L - T E M P O R A R Y D E W A T E R I N G < 0 . 0 1 1 0 S T R E A M B A N K S T A B I L I Z A T I O N 0 . 0 3 9 4 T E M P O R A R Y D E W A T E R I N G < 0 . 0 1 1 0 TO T A L S * : 0 . 0 3 < 0 . 0 1 9 4 2 0 0 *R o u n d e d t o t a l s a r e s u m o f a c t u a l i m p a c t s NO T E S : AT N R e v i s e d 3 / 1 2 / 1 3 SH E E T 5OF 5 NC D E P A R T M E N T O F T R A N S P O R T A T I O N DIVISION OF HIGHWAYS 3/12/2015 W E T L A N D P E R M I T I M P A C T S U M M A R Y WE T L A N D I M P A C T S S U R F A C E W A T E R I M P A C T S GRANVILLE COUNTY BRIDGE 178 ON SR 1304 OVER FOX CREEK Projeci Tracking No. (Internal Use) 1 11 -09-0019 ] I NO SURVEY REQUIRED FORM PROJECT INFORMATION Proj ect No : County: Davidson WBSNo : 17BP .9.R.13 Document: PCE F.A . No: Funding: I:ZI State D Federal Federal (USACE) Permit Required? I:ZI Yes D No Permit Type: NWP 3 & NWP 14 Proje ct Des cription: Replace Bridge No. 424 overNC 8 and Dare Branch on SR 1243. SUMMARY OF CULTURAL RESOURCES REVIEW Briefdescription ofreview activities, results ofrevi ew, and conclusions: Review of HPO quad maps , relevant background reports , historic designations roster, and indexes was undertaken on September 21 ,2011. Based on this review , there were no existing NR , SL , LD, DE , or SS properties in the Area of Potential Effects (APE). Aerial photographs and HPO GIS indicates there are structures near the bridge replacement project. How ever Davidson County Tax Data reveals that these commercial properties are contemporary building . Nothin g in the project area is eligible for National Register listing. BriefExplanation ofwhythe available information provides ar eliable basi s for reasonably predicting that there areno unidentifi ed historic propertiesin theA PE: Using HPO GIS website and Davidson County Tax Dat a provide reliable information regarding the structures in the APE. These combined utilities are considered v alid for the purpo ses of determining the likelihood of hi storic resources being present. SUPPORT DOCUMENTATION See attached: Maps , photos FINDING BY NCDOT CULTURAL RESOURCES PROFESSIONAL NO SURVEY REQUIRED en - (9 o a. I SUPPORT DOCUMENTAnON See attached: ~ Map(s) ~ Previous Survey Info ~ Photos DCorrespondence D Photocopy of County Survey Notes FINDING BY NCDOT CULTURAL RESOURCES PROFESSIONAL @ SURVEY REQUIRE €)