HomeMy WebLinkAboutSW3221006_Email_20230606 (3)
Peck, Kaitlin
From:Steven Prophet <steven.prophet@eagleonline.net>
Sent:Tuesday, June 6, 2023 11:29 AM
To:Peck, Kaitlin; 'Haley Daniel'
Cc:MKirchner@eagleonline.net; 'Michael Prophet'; 'Haley Daniel'; 'Kayle Schmidt'; 'Jeremy
Roberts'; Eplin, Jerry W; Farkas, Jim J
Subject:RE: \[External\] Re: SW3221006 Cottages at Wingate - Phases 1 & 2
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
No worries, thank you for holding the place in line! We will get a new hard copy package assembled and mailed out
asap.
If there is anything we can do on our end to make sure the package arrives to the proper location / person, please let us
know and we’ll be sure to do that moving forward (i.e. specify a specific entrance to drop things off at, or a specific
person to direct the package too – we should be able to provide this in the delivery notes).
Thank you again!!
Steven Prophet
Eagle Engineering, Inc.
Senior Project Manager | Civil Division
(704) 315-5735 - Direct
(704) 882-4222 - Office
Steven.Prophet@eagleonline.net
2013 Van Buren Avenue, Suite A
Indian Trail, NC 28079
www.eagleonline.net
Any attached files are for information use only. Eagle Engineering, Inc. (EEI) assumes no responsibility for the accuracy or the validity of any electronic data. All
construction should follow signed and sealed construction documents. The content of this email is the confidential property of EEI and should not be copied,
modified, retransmitted, or used for any purpose except with EEI's written authorization. If you are not the intended recipient, please delete all copies and notify
us immediately.
From: Peck, Kaitlin
Sent: Tuesday, June 6, 2023 11:27 AM
To: Steven Prophet <steven.prophet@eagleonline.net>; 'Haley Daniel' <haley.daniel@eagleonline.net>
Cc: MKirchner@eagleonline.net; 'Michael Prophet' <michael.prophet@eagleonline.net>; 'Haley Daniel'
<haley.hardin@eagleonline.net>; 'Kayle Schmidt' <kayle.schmidt@eagleonline.net>; 'Jeremy Roberts'
<jroberts@eagleonline.net>; Eplin, Jerry W <jerry.eplin@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] Re: SW3221006 Cottages at Wingate - Phases 1 & 2
We can honor your 4/24/23 submission date. We do still need you to resubmit as we cannot issue the permit until we
get the hard copies. I apologize again for the inconvenience.
Thank you for your patience!
Take care,
1
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: Steven Prophet <steven.prophet@eagleonline.net>
Sent: Tuesday, June 6, 2023 11:11 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; 'Haley Daniel' <haley.daniel@eagleonline.net>
Cc: MKirchner@eagleonline.net; 'Michael Prophet' <michael.prophet@eagleonline.net>; 'Haley Daniel'
<haley.hardin@eagleonline.net>; 'Kayle Schmidt' <kayle.schmidt@eagleonline.net>; 'Jeremy Roberts'
<jroberts@eagleonline.net>; Eplin, Jerry W <jerry.eplin@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] Re: SW3221006 Cottages at Wingate - Phases 1 & 2
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good morning Kaitlin,
I understand that the package cannot be located, but we have done everything in our power (outside of driving to
Raleigh and hand delivering it) to ensure that the package was provided to the NCDEQ. We have no issues assembling a
new package and mailing it back out to you, but our major concern at this point is timing. With the current review time
th
frames, are we able to maintain our place in line based on the April 24 hard copy arrival date and have the plans
reviewed digitally while the new hard copy package arrives?
Thank you
Steven Prophet
Eagle Engineering, Inc.
Senior Project Manager | Civil Division
(704) 315-5735 - Direct
(704) 882-4222 - Office
Steven.Prophet@eagleonline.net
2013 Van Buren Avenue, Suite A
Indian Trail, NC 28079
www.eagleonline.net
Any attached files are for information use only. Eagle Engineering, Inc. (EEI) assumes no responsibility for the accuracy or the validity of any electronic data. All
construction should follow signed and sealed construction documents. The content of this email is the confidential property of EEI and should not be copied,
modified, retransmitted, or used for any purpose except with EEI's written authorization. If you are not the intended recipient, please delete all copies and notify
us immediately.
2
From: Peck, Kaitlin
Sent: Tuesday, June 6, 2023 11:00 AM
To: Haley Daniel <haley.daniel@eagleonline.net>
Cc: Steven Prophet <steven.prophet@eagleonline.net>; MKirchner@eagleonline.net; Michael Prophet
<michael.prophet@eagleonline.net>; Haley Daniel <haley.hardin@eagleonline.net>; Kayle Schmidt
<kayle.schmidt@eagleonline.net>; Jeremy Roberts <jroberts@eagleonline.net>; Eplin, Jerry W
<jerry.eplin@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] Re: SW3221006 Cottages at Wingate - Phases 1 & 2
Good Morning Haley,
I see your proof of delivery. Unfortunately, we have not received it to our office and have been unable to locate it.
th
Please resubmit or request an extension by next Wednesday, June 13.
I apologize for the inconvenience.
Thank you,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: Haley Daniel <haley.daniel@eagleonline.net>
Sent: Tuesday, June 6, 2023 10:51 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Cc: Steven Prophet <steven.prophet@eagleonline.net>; MKirchner@eagleonline.net; Michael Prophet
<michael.prophet@eagleonline.net>; Haley Daniel <haley.hardin@eagleonline.net>; Kayle Schmidt
<kayle.schmidt@eagleonline.net>; Jeremy Roberts <jroberts@eagleonline.net>; Eplin, Jerry W
<jerry.eplin@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: Re: \[External\] Re: SW3221006 Cottages at Wingate - Phases 1 & 2
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good Morning Kaitlin,
I hope this email finds you well! Please see the attached proof of delivery items.
3
I look forward to hearing from you, thank you!
Haley Daniel
Eagle Engineering, Inc.
Executive Project Coordinator | Civil Division
(704) 893-1255 - Direct
(704) 882-4222 - Office
haley.daniel@eagleonline.net
2013 Van Buren Avenue, Suite A
Indian Trail, NC 28079
www.eagleonline.net
4
On Tue, Jun 6, 2023 at 10:15 AM Peck, Kaitlin <kaitlin.peck@deq.nc.gov> wrote:
Good Morning,
As of today, we have not received your resubmission for this project. Please resubmit or request an extension by next
th
Wednesday, June 13, or the projects will be returned due to inactivity. Let me know if you have any questions!
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: Steven Prophet <steven.prophet@eagleonline.net>
Sent: Tuesday, May 9, 2023 3:59 PM
To: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; 'Haley Daniel' <haley.daniel@eagleonline.net>
Cc: MKirchner@eagleonline.net; 'Michael Prophet' <michael.prophet@eagleonline.net>; 'Haley Daniel'
<haley.hardin@eagleonline.net>; 'Kayle Schmidt' <kayle.schmidt@eagleonline.net>; 'Jeremy Roberts'
<jroberts@eagleonline.net>; Eplin, Jerry W <jerry.eplin@deq.nc.gov>
Subject: RE: \[External\] Re: SW3221006 Cottages at Wingate - Phases 1 & 2
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
5
Good afternoon Jim,
th
This was shipped out and arrived on April 24 per the tracking information. Attached is the label with the address (512
North Salisbury Street) and below is the confirmation. Received by a ‘Reese’ in the mail room.
Steven Prophet
Eagle Engineering, Inc.
Senior Project Manager | Civil Division
(704) 315-5735 - Direct
(704) 882-4222 - Office
Steven.Prophet@eagleonline.net
2013 Van Buren Avenue, Suite A
Indian Trail, NC 28079
www.eagleonline.net
6
Any attached files are for information use only. Eagle Engineering, Inc. (EEI) assumes no responsibility for the accuracy or the validity of any electronic data. All
construction should follow signed and sealed construction documents. The content of this email is the confidential property of EEI and should not be copied,
modified, retransmitted, or used for any purpose except with EEI's written authorization. If you are not the intended recipient, please delete all copies and notify
us immediately.
From: Farkas, Jim J
Sent: Tuesday, May 9, 2023 3:54 PM
To: Haley Daniel <haley.daniel@eagleonline.net>
Cc: MKirchner@eagleonline.net; Michael Prophet <michael.prophet@eagleonline.net>; Steven Prophet
<steven.prophet@eagleonline.net>; Haley Daniel <haley.hardin@eagleonline.net>; Kayle Schmidt
<kayle.schmidt@eagleonline.net>; Jeremy Roberts <jroberts@eagleonline.net>; Eplin, Jerry W
<jerry.eplin@ncdenr.gov>
Subject: RE: \[External\] Re: SW3221006 Cottages at Wingate - Phases 1 & 2
We haven’t yet received the hard copy resubmission for this project. Please provide this by the end of the week.
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
From: Haley Daniel <haley.daniel@eagleonline.net>
Sent: Wednesday, April 19, 2023 8:34 AM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: mkirchner@eagleonline.net; Michael Prophet <michael.prophet@eagleonline.net>; Steven Prophet
<steven.prophet@eagleonline.net>; Haley Daniel <haley.hardin@eagleonline.net>; Kayle Schmidt
<kayle.schmidt@eagleonline.net>; Jeremy Roberts <jroberts@eagleonline.net>; Eplin, Jerry W
<jerry.eplin@ncdenr.gov>
Subject: Re: \[External\] Re: SW3221006 Cottages at Wingate - Phases 1 & 2
7
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Perfect, thank you!
Haley Daniel
Eagle Engineering, Inc.
Executive Project Coordinator | Civil Division
(704) 893-1255 - Direct
(704) 882-4222 - Office
haley.daniel@eagleonline.net
2013 Van Buren Avenue, Suite A
Indian Trail, NC 28079
www.eagleonline.net
On Wed, Apr 19, 2023 at 8:33 AM Farkas, Jim J <Jim.Farkas@ncdenr.gov> wrote:
That will do
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
8
From: Haley Daniel <haley.daniel@eagleonline.net>
Sent: Wednesday, April 19, 2023 8:32 AM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: mkirchner@eagleonline.net; Michael Prophet <michael.prophet@eagleonline.net>; Steven Prophet
<steven.prophet@eagleonline.net>; Haley Daniel <haley.hardin@eagleonline.net>; Kayle Schmidt
<kayle.schmidt@eagleonline.net>; Jeremy Roberts <jroberts@eagleonline.net>; Eplin, Jerry W
<jerry.eplin@ncdenr.gov>
Subject: Re: \[External\] Re: SW3221006 Cottages at Wingate - Phases 1 & 2
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report
Message button located on your Outlook menu bar on the Home tab.
Good Morning Jim,
We have everything ready to submit today! Will the digital upload suffice to meet the 19th deadline or do
hard copies also need to be in your hands by today? We plan to send hard copies out today along with the
digital submittal, but realistically the hard copies won’t arrive at your office until later in the week. I look
forward to hearing from you, thank you for your time!
Haley Daniel
Eagle Engineering, Inc.
Executive Project Coordinator | Civil Division
(704) 893-1255 - Direct
(704) 882-4222 - Office
haley.daniel@eagleonline.net
9
2013 Van Buren Avenue, Suite A
Indian Trail, NC 28079
www.eagleonline.net
On Wed, Apr 19, 2023 at 8:04 AM Farkas, Jim J <Jim.Farkas@ncdenr.gov> wrote:
It’s not a formal process, just send me an email with the anticipated resubmission date and we usually grant it unless
it is unreasonable.
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
From: Haley Daniel <haley.daniel@eagleonline.net>
Sent: Friday, April 14, 2023 10:42 AM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: mkirchner@eagleonline.net; Michael Prophet <michael.prophet@eagleonline.net>; Steven Prophet
<steven.prophet@eagleonline.net>; Haley Daniel <haley.hardin@eagleonline.net>; Kayle Schmidt
<kayle.schmidt@eagleonline.net>; Jeremy Roberts <jroberts@eagleonline.net>; Eplin, Jerry W
<jerry.eplin@ncdenr.gov>
Subject: \[External\] Re: SW3221006 Cottages at Wingate - Phases 1 & 2
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
10
Good Morning Jim,
Happy Friday! Could you please walk me through the process of filing for an extension? I'd love to get this
done ASAP, but am not sure where to begin. Any help would be greatly appreciated, thank you!
Please feel free to call me at 704-989-1099 if needed!
Haley Daniel
Eagle Engineering, Inc.
Executive Project Coordinator | Civil Division
(704) 893-1255 - Direct
(704) 882-4222 - Office
haley.daniel@eagleonline.net
2013 Van Buren Avenue, Suite A
Indian Trail, NC 28079
www.eagleonline.net
On Wed, Apr 12, 2023 at 3:40 PM Farkas, Jim J <Jim.Farkas@ncdenr.gov> wrote:
As of today, April 12, 2023, we have not received a resubmission to address the below comments. Please provide
the requested information or request a resubmission extension by close of business on 4/19/2023 or the project will
be returned due to inactivity.
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
11
From: Farkas, Jim J
Sent: Thursday, March 9, 2023 3:59 PM
To: Jay.Lewis <Jay.Lewis@dreamfindershomes.com>; ch.swan@dfcapitalmanagement.com; Marwan Shahin
<Marwanshahin@hhhomes.com>; mkirchner@eagleonline.net; 'Gracie Daniel' <gracie.daniel@eagleonline.net>;
Michael Prophet <michael.prophet@eagleonline.net>; Steven Prophet <steven.prophet@eagleonline.net>; Tyler
Cox <tyler.cox@eagleonline.net>; Haley Daniel <haley.hardin@eagleonline.net>; Kayle Schmidt
<kayle.schmidt@eagleonline.net>; 'Jeremy Roberts' <jroberts@eagleonline.net>; tcrouch@themosergroupinc.com;
Abby Stegall <astegall@themosergroupinc.com>
Cc: Eplin, Jerry W <jerry.eplin@ncdenr.gov>
Subject: RE: SW3221006 Cottages at Wingate - Phases 1 & 2
Good Morning,
The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater
th
Management Permit Application for the subject project on December 13, 2022. A review of that information has
determined that the application is not complete. Attached is a letter describing the items that need to be submitted.
If you have any questions, please feel free to contact me. My contact information is listed below.
Thank you,
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
12
From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov>
Sent: Tuesday, December 13, 2022 11:48 AM
To: Jay.Lewis <Jay.Lewis@dreamfindershomes.com>; ch.swan@dfcapitalmanagement.com; Marwan Shahin
<Marwanshahin@hhhomes.com>; mkirchner@eagleonline.net; 'Gracie Daniel' <gracie.daniel@eagleonline.net>;
Michael Prophet <michael.prophet@eagleonline.net>; Steven Prophet <steven.prophet@eagleonline.net>; Tyler
Cox <tyler.cox@eagleonline.net>; Haley Daniel <haley.hardin@eagleonline.net>; Kayle Schmidt
<kayle.schmidt@eagleonline.net>; 'Jeremy Roberts' <jroberts@eagleonline.net>; tcrouch@themosergroupinc.com;
Abby Stegall <astegall@themosergroupinc.com>
Cc: Khan, Zahid <zahid.khan@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Subject: SW3221006 Cottages at Wingate - Phases 1 & 2
Good morning,
We received your post-construction stormwater permit application for the above mentioned project on
12/13/2022. Reviews under the standard permitting process generally take 75 calendar days, but can take up to 90
calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed
75 days). Please upload all (revised/updated) documents that you mailed into our office through the link provided
below. Be sure to choose the Central Office as the Primary Contact office.
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can
be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly
below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets
through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the
correct file type ensures that the files are properly named in the electronic repository and it helps expedite the
review process.
Please type in permit #: SW3221006
13
If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646.
Thank you,
Margie DeBerry
Environmental Specialist, Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
Office: (919) 707-9209
margie.deberry@ncdenr.gov
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
14