Loading...
HomeMy WebLinkAboutSWA000216_email_20230629 Peck, Kaitlin From:Farkas, Jim J Sent:Thursday, June 29, 2023 3:37 PM To:Jacob Dooley Cc:Kay, Lily C Subject:RE: \[External\] RE: Circle K Expansion 2723205 Old US 52 & Hickory Tree Road, Davidson County I’m not seeing it in our files. Did you send it to the Central Office (the original submission was sent to the Winston-Salem Office)? Do you have a tracking number (occasionally mail gets delivered to our building, but not to the right person/floor)? Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Jacob Dooley <jacob.dooley@timmons.com> Sent: Monday, June 19, 2023 4:40 PM To: Farkas, Jim J <Jim.Farkas@deq.nc.gov> Cc: Kay, Lily C <lily.kay@deq.nc.gov> Subject: \[External\] RE: Circle K Expansion 2723205 Old US 52 & Hickory Tree Road, Davidson County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Jim, Wanted to reach out and confirm you received the addi?onal informa?on requested for this project? Our records show it was delivered on 06/07. Thanks! Jacob Dooley, PE Project Manger TIMMONS GROUP | www.timmons.com 1 5410 Trinity Rd, Suite 102 | Raleigh, NC 27607 Office: 919.866.4937 | Fax: 919.859.5663 Your Vision Achieved Through Ours To send me files greater than 20MB click here From: Farkas, Jim J <Jim.Farkas@deq.nc.gov> Sent: Wednesday, May 31, 2023 12:33 PM To: wrice@circlek.com; Jacob Dooley <jacob.dooley@timmons.com> Cc: Kay, Lily C <lily.kay@deq.nc.gov> Subject: Circle K Expansion 2723205 Old US 52 & Hickory Tree Road, Davidson County CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Afternoon, We received your application for a new Fast-Track ATC post-construction stormwater permit on 5/24/2023. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 6/30/2023) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  2x hard copies of the Application Form (or pages) with the following corrections made (A complete application is required per 15A NCAC 02H .1043(3)(a)):  Part C2 – Please correct the post-construction program that this project is subject to (Non-coastal HQW was selected, but this project appears to be located in an Urbanizing Areas (Phase 2) area).  Part D1 – Please provide the applicant contact information (email address and phone number). These items are required per 15A NCAC 02H .1043(3)(a)(v).  Part D2 – Please provide the name and contact information for the registered agent for the applicant.  Part D4 – Please provide the contact information for the property owners that are not the applicant.  Part E5 – Please include the existing on-site BUA information in this table and revise the percent BUA value.  2x hard copies of a construction sequence discussing how any future development on the project may be phased. This item is required per 15A NCAC 02H .1043(3)(g). The construction sequence does not need to be lengthy, just a brief description of how future development on the project (beyond what is shown on the plans) will be phased. If no future development is planned for the project, you can simply state that in the construction sequence. This item is different than the E&SC sequence of construction.  2x hard copies of a plan sheet with the following corrections made:  Wetland delineation or a note on the plans stating that there are no wetlands located on-site. This item is required per 15A NCAC 02H .1043(3)(f) and Part F4 of the Application. Please also list the name of the individual that made this determination in a note on the plans. NOTE: This is an administra?ve completeness review, not a detailed engineering review, there may be other issues that may be brought up during the engineering review. While not required for administra?ve completeness, please elaborate on the “overgrown stormwater pond” as shown on the plans. This stormwater pond may have been required for a 401/Buffer permit and you may need to coordinate with them for permi?ng (our office does not have a record for this stormwater pond so it does not appear to have been required/permi?ed through our office). 2 If these items are received within the s?pulated ?meframe, we can accept the project and begin the review process. Once accepted, reviews under the Fast-Track permi?ng process can take up to 30 calendar days per statute (one of our two reviewer posi?ons is currently vacant). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any ques?ons, please contact Jim Farkas at jim.farkas@ncdenr.gov or 919-707-3646. Thank you, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 3