HomeMy WebLinkAboutWQ0044598_Application (FTSE)_20230705,'\ Greenville
oo_ Utilities
June 29, 2023
Mr. Robert Tankard
Assistant Regional Supervisor
North Carolina Division of Water Quality
943 Washington Square Mall
Washington, NC 27889
Subject: Abigail Trails
Phase 2
Sewer Main Extension
Dear Mr. Tankard:
JU6lI0 5 2023
Water QuafltY
RegWa Operailons section
WashkVM ROOMeI office
1AA00 Vq5q$
We are submitting herewith one (1) original and one (1) copy of the executed Non -Discharge
Permit Application and Flow Tracking/Acceptance for Sewer Extension Permit Applications
along with a check for $480.00 for the subject project. We request your approval of the sewer
improvements.
We trust that you will find this submittal to be in order and that your approval will be
forthcoming. In the meantime, should you have any questions or require any additional
information, please let us know.
Sincerely,
Cli on H. Cahoon, PE
Construction / Contracts Engineer
Enclosures
c: Mr. David W. Springer, PE, Interim Director of Water Resources
Mr. Richard A. Brown, PE, Stroud Engineering, PA
Connected To You Post Office Box 1847 1 Greenville, North Carolina 27835-1847 1 guc.com 1 252-752-7166
Sewer Narrative
Abigail Trails Phase 2
May 9, 2023
Owner:
Greenville Utilities Commission
Engineer:
Stroud Engineering, PA
107B Commerce St.
Greenville, NC 27858
A. Description of Project
Abigail Trails Phase 2 is proposed as a residential development consisting of 35
duplex lots located on the east side of Frog Level Road in Pitt County, NC. At a rate of
360 gpd/unit, the estimated discharge is 360 x 2 x 35 = 25,200 gpd.
This project will tie into the existing sewer system at the manholes located at the
current terminus of Abigail Taylor & Sarah Rebecca Drives in Phase 1
15J 01-02
Richard A. Brown, PE Date
State of North Carolina
Department of Environmental Quality
Division of Water Resources
"f 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources
FTA 04-16 &SUPPORTING DOCUMENTATION
Application Number: o be completed by DVJR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Greenville Utilities Commission (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ® Municipal ❑ Other
3. Signature authority's name: Clifton H. Cahoon, PE per 15A NCAC 02T .0106(b)
Title: Construction/Contracts Engineer
4. Applicant's mailing address: PO Box 1847
City: Greenville State: NC Zip: 27835-
5. Applicant's contact information:
Phone number: 252 551-3386 Email Address: cahoonch(a�guc.com
H. PROJECT INFORMATION:
1. Project name: Abigail Trails Phase 2
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: WQ00 and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00
3. County where project is located: Pitt
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.5661' Longitude:-77.4435' 1
5. Parcel ID (if applicable): 88125
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Richard A. Brown License Number: 36845
Firm: Stroud Engineering, PA
Mailing address: 107B Commerce Street
City: Greenville State: NC Zip: 27858-
Phone number: 252 756-9352 Email Address: rbrown(a4stroudengineencom
IV. WASTEWATER TREATMENT FACILITY (WVVTF) INFORMATION:
1. Facility Name: Greenville Utilities Commission Permit Number: 2943 7'
Owner Name: Greenville Utilities Commission
�s
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQ0043231 ✓ Downstream (Receiving) Sewer Size: 8" inch
System Wide Collection System Permit Number(s) (if applicable): WQCS
Owner Name(s): Greenville Utilities Commission
FORM: FTA 04-16 Page 1 of 5
VL GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
[—]Yes ❑No ®N/A
3. If the Applicant is a Home/PropeM Owners' Association. has an Operational Agreement (FORM: HOA) been attached?
❑ Yes ❑No ®N/A
4. Origin of wastewater. (check all that apply):
® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: (�Q% Domestic/Commercial % Commercial
% Industrial (See 15A NCAC 02T .0103(20))
�. Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)7 [:]Yes ® No
➢ If yes, provide a cony of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 221.01140
Daily Design Mow',b
No. of Units
Flow
Duplexes
360 gal/day/unit
35
25,200 GPD
gal/
GPD
gal/
GPD
gal
GPD
gal/
GPD
gal/
GPD
Total
25,200 GPD
a See 15A NCAC 02T .0114(b). (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates. (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data
8. Wastewater generated by project: 25,200 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 Page 2 of 5
VU. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
8" 871 Truss Pipe
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIM PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - °
3. Design flow of the pump station: millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDI-1)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B).
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g)
➢ 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewer stems:
® Yes ❑ No
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains(horizontal)
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines(horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade vertical
36 inches
➢ 15A NCAC 02T,0305(g) contains alternatives where separations in 02T,0305(f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webnage
➢ If noncompliance with 02T.0305(f) or (,), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project require coverage/authorization under a 404 Nationwide or ® Y ❑ No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No ❑ N/A
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Altemative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents.
Professional Engineer's Certification:
I, k 6KQvPt� attest that this application for
4CI+PVD
(Professional Engineer's name from Application Item EEL1.)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
_.��arnrnrrrrrr._
North Carolina Professional Engineer's seal, signature, and date: ! Pq�F,`
i
i �sN
n m v�s�9 z ; I !
,Z n I
1 r
Applicant's Certification per 15A NCAC 02T .0106(b):
I, 1 / vR / cI' attest that this application for
(Signature Au ority's name & title fforn Application Item I.3.
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as, civil penalties up to $25,000 per violation.
Signature: - Date:
FORM: FTA 04-16 Page 5 of 5
State of North Carolina
FEGEMMlNCDENRIDWR Department of Environmental Quality
Division of Water Resources
DWR
,.,15: - F_ -IKIW
15A NCAC 02TG*OQ�CK SEWER SYSTEM EXTENSION APPLICATION
Divlslon of Water Resources INSTRU M: FTA 04-16 & SUPPORTING DOCUMENTATION
water Quality
This application is for sewer extensions involving�ons and force mains, or any combination that has been
certified by a professional engineer and the applic tqv ie pro 1%Et meets the and
of 15A NCAC 02T and the Division's
Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A
NCAC 02T, 15A NCAC 02T .0300, Division policies and good engineering practices.
While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design
documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design
calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These
documents shall be available upon request by the Division.
Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303.
Projects not eligible for review via the fast track process (must be submitted for full technical review):
➢ Projects that require an environmental assessment in accordance with 15A NCAC I .0100;
➢ Projects that do not meet any part of the minimum design criteria WC) document;
➢ Projects that involve a variance from the requirements of 15A NCAC 2T;
➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPs) or simplex grinder pumps;
➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains);
➢ Vacuum sewer systems.
General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items
are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and
reduce the amount of requested additional information. Failure to submit all required items will necessitate additional
processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit
one original and one copy of the application and supporting documentation.
A. One Original and One Copy of Application and Supporting Documents
M Required unless otherwise noted
B. Cover Letter (Required for All Application Packages):
M List all items included in the application package, as well as a brief description of the requested permitting action.
➢ Be specific as to the system type, number of homes served, flow allocation required, etc.
➢ If necessary for clarity, include attachments to the application form.
C. Application Fee (All New and Major Modification Application Packages):
M Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal.
➢ Payable to North Carolina Department of Environmental Quality (NCDEQ)
D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages):
M Submit the completed and appropriately executed application.
➢ If necessary.for clarity or due to space restrictions, attachments to the application may be made.
❑ If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with
the North Carolina Secretary of State.
❑ If the Applicant Type in Item 1.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of
Deeds in the county of business.
M The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc.
M The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North
Carolina licensed Professional Engineer.
M The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b).
Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is
provided.from a person who meets the criteria in 15A NCAC 02T .0106(b).
INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Pagel of 3
E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable):
® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility.
➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different.
➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one
year prior to the application date.
➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143-
215.67 a .
➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE.
F. Site Maps (All Application Packages):
® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project
area and closest surface waters.
➢ Location of the project (gravity sewer, pump stations & force main)
➢ Downstream connection points and permit number (if known) for the receiving sewer
® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field.
G. Existing Permit (All Modification Packages):
❑ Submit the most recently issued existing permit.
❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit
modification (i.e., permit description, flow allocation, treatment facility, etc.).
H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station):
❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations.
➢ This alternative is only available for average daily flows less than 15,000 gallons per day
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible
with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed
contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated
appurtenances and personnel are available for distribution and operation of this pump station."
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump
stations' storage capacities and the rotation schedule of the portable power source or pump, including travel
timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification)
L Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities):
❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina
Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by
the sewer extension, or
❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an
application for a franchise has been received and that the service area is contiguous to an existing franchised area or that
franchise approval is expected.
J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold):
❑ Home/Property Owners' Associations
❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA).
❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws.
❑ Developers of lots to be sold
❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV).
For more information, visit the Division's collection systems website
INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3
THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND
MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE:
REGIONAL OFFICE
ADDRESS
COUNTIES SERVED
Asheville Regional Office
2090 US Highway 70
Avery, Buncombe, Burke, Caldwell, Cherokee,
Water Quality Section
Swannanoa, North Carolina 28778
Clay, Graham, Haywood, Henderson, Jackson,
(828) 296-4500
Macon, Madison, McDowell, Mitchell, Polk,
(828) 299-7043 Fax
Rutherford, Swain, Transylvania, Yancey
Fayetteville Regional Office
225 Green Street Suite 714
Anson, Bladen, Cumberland, Harnett, Hoke,
Water Quality Section
Fayetteville, North Carolina 28301-5094
Montgomery, Moore, Robeson, Richmond,
(910) 433-3300
Sampson, Scotland
(910) 486-0707 Fax
Mooresville Regional Office
610 E. Center Avenue
Alexander, Cabarrus, Catawba, Cleveland,
Water Quality Section
Mooresville, North Carolina 28115
Gaston, Iredell, Lincoln, Mecklenburg, Rowan,
(704) 663-1699
Stanly, Union
(704) 663-6040 Fax
Raleigh Regional Office
1628 Mail Service Center
Chatham, Durham, Edgecombe, Franklin,
Water Quality Section
Raleigh, North Carolina 27699-1628
Granville, Halifax, Johnston, Lee, Nash,
(919) 791-4200
Northampton, Orange, Person, Vance, Wake,
(919) 788-7159 Fax
Warren, Wilson
Washington Regional Office
943 Washington Square Mall
Beaufort, Bertie, Camden, Chowan, Craven,
Water Quality Section
Washington, North Carolina 27889
Currituck, Dare, Gates, Greene, Hertford, Hyde,
(252) 946-6481
Jones, Lenoir, Martin, Pamlico, Pasquotank,
(252) 975-3716 Fax
Perquimans, Pitt, Tyrrell, Washington, Wayne
Wilmington Regional Office
127 Cardinal Drive Extension
Brunswick, Carteret, Columbus, Duplin, New
Water Quality Section
Wilmington, North Carolina 28405
Hanover, Onslow, Pender
(910) 796-7215
(910) 350-2004 Fax
Winston-Salem Regional Office
450 W. Hanes Mill Road
Alamance, Alleghany, Ashe, Caswell, Davidson,
Water Quality Section
Suite 300
Davie, Forsyth, Guilford, Rockingham, Randolph,
Winston-Salem, North Carolina 27105
Stokes, Surry, Watauga, Wilkes, Yadkin
(336) 776-9800
INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3
Alt
f ,
Frog
Level
F,
f�.
'1.
r
w STAR ST
S/'fE
nDA. RRELL".'DR 75r
ril
5 ---90a
.rr
State of North Carolina
yT't4 �^ Department of Environmental Quality
Division of Water Resources
alvislon of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Greenville Utilities Commission
Project Name for which flow is being requested: Abigail Trails Phase 2
More than one ME may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow:
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Greenville Utilities Commission
b. WWTP Facility Permit #: NCO023931
All flows are in MGD
c. WWTP facility's permitted flow
17.5
d. Estimated obligated flow not yet tributary to the WWTP 2.778
e. WWTP facility's actual avg. flow
9.779
f. Total flow for this specific request
.0252
g. Total actual and obligated flows to the facility
12.582
h. Percent of permitted flow used
71.895
H. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B)
(C) (D)=(B+C)
(E)=(A-D)
Design
Obligated,
Pump Average Daily Approx.
Not Yet Total Current
Station Firm Flow** Current Avg.
Tributary Flow Plus
(Name or Capacity, * (Firm / pf), Daily Flow,
Daily Flow, Obligated
Available
Number) MGD MGD MGD
MGD Flow
Capacity***
Southside 30.259 12.104 5.791
1.360 7.151
4.953
Sterling 5.648 2.259 .318
.322 .640
1.619
Darrell Dr .756 .302 .100
.079 .179
.123
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pf) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Abigail Trails Phase 1
Downstream Permit Number: WQ0043231
Page 1 of 6
FTSE 04-16
i
r
III. Certification Statement:
I Clifton H. Cahoon, PE certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation
of the planned improvements identified in the planning assessment where applicable. This
analysis has been performed in accordance with local :established policies and procedures using
the best available data. This certification applies to those items listed above in Sections I and II
plus allattached planning assessment addendums for which I am. the responsible party.
Signature of this form indicates acceptance of this wastewater flow.
Signing Official Signature Date
Page 2 of 6
FTSE 04-16_
=low for:
Jan.2022
Feb.2022
Mar.2022
Apr.2022
May2022
Jun2022
Ju12022
Aug2022
Sept2022
0ct2O22
Nov2022
Dec2022
Facility name Permit #
Permitted Flow:
GUC
N C0026"&
10.6580645
10.8178571
10.2129032
9.9066667
9.5645161
9.1366667
9.816129
9.7677419
9.6966667
9.3935484
9.32
9.3387097
9.802455833 Avg. Flow
2022 % of Permitted Flow:
17.5
0.560140333
(< 80%/ 90% OK)
RE: [External] Abigail Trails Phase 2
Richie Brown <rbrown@stroudengineer.com>
Fri 8/4/2023 2:24 PM
To:Toppen, Sarah A-<Sarah.Toppen@deq.nc.gov>
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report
Message button located on your Outlook menu bar on the Home tab.
Hey Sarah,
Correct, this job does not require coverage/authorization under a 404 Nationwide or Individual permits or 401
Water Quality Certifications.
Richie Brown, PE
Principal
Stroud Engineering, P.A.
107B Commerce Street
Greenville, NC 27858
252-756-9352 x132
Direct:'252-381-7318
From: Toppen, Sarah A <Sarah.Toppen@deq.nc.gov>
Sent: Thursday, August 3, 2023 9:28 AM
To: Richie Brown <rbrown@stroudengineer.com>
Subject: RE: [External] Abigail Trails Phase 2
Good morning Richle,
Thank you for sending me the updated page 2 for Abigail Trails. Can you send me an email confirming that #4 on
page 4 of 5 does not require coverage/authorization under a 404 Nationwide or individual permits or 401 Water
Quality Certifications?
Thankyoul
Sarah
From: Richie Brown <rbrown0stroudengineencom>
Sent: Tuesday, August 1, 2023 4:27 PM
To: Toppen, Sarah A <Sarah.TgRggn@JW nc•aQy>'
Subject: [External] Abigail Trails Phase 2
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report
Message button located on your Outlook menu bar on the Home tab.
Please see attached.
Thanks for you help,
Richie Brown, PE
Principal
Stroud Engineering, P.A.
107B Commerce Street
Greenville, NC 27858
252-756-9352 x132
Direct: 252-381-7318
Email correspondence to and from this address may be subjed to the North Carollna Public Records Law and may be disdosed to third parties by an
authorized state official.