HomeMy WebLinkAbout20140090 Ver 2_Sediment Loss Report_20150706Wanucha, Dave
From: Euliss, Amy
Sent: Monday, July 06, 2015 11:39 AM
To: Wanucha, Dave
Cr. Guy, Jeremy M; Wyrick, Scott D; Meachum, James O; Suggs, Phillip H
Subject: Sediment losses
We've had sediment losses on U-2925 (Salem Creek Connector) and U-2579B. On U2925, the loss occurred at site 1. On
U2579B, the loss occurred at site 2, as well as Mr. Tabor's pond. At the pond, the sediment was on our side of the
turbidity curtain. We'll proceed with removing the sediment and repairing the erosion control devices on both projects
as needed.
We had a lot o heavy rain over the weekend. I'm off today, but once I get more details, I'll let you know.
Sent from my iPhone
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.