Loading...
HomeMy WebLinkAboutNCC232224_NOT Closeout Documents_20230803 ROY COOPER Y "fi ' Governor f .;; ELIZABETH S.BISER Secretary . `r'7 BRIAN WRENN Director ,C P Ypf�p_NA Environrnentat Quality Dear Sir or Madam: Attached is a copy of the inspection report which was prepared following an on-site inspection of the subject site. This report is intended to provide you with information concerning the status of the site as it relates to compliance with the North Carolina Sedimentation Pollution Control Act on 1973. Please review this report carefully as it may contain corrective actions needed or comments which will assist you in meeting the required performance standards of the Act. It is our desire that any and all possible problems be discussed and resolved at the earlies possible time. To facilitate this effort, please contact the named inspector at the address shown on the inspection report if you have any questions. Sincerely Land Quality Section Mooresville Regional Office rV North Carolina Department of Ens ironmental Quality Di,.smn of Energy.Mineral and Land Resources � Mooresville Regional Office I, I)East Center Avenue.Suite 101 Mooresville.North Carolina 28115 70a•,6y109 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704) 663-1699 County: Iredell Project: Mooresville Skate Park River basin: Catawba Person financially responsible:Town of Mooresville-Randall W Hemann.Town Manager Project#: IREDE-2022-005 Address: P.O. Box 878,Mooresville,NC 28115 1. Project Location: 248 West Iredell Avenue,Mooresville Pictures: No 2. Weather and soil conditions: Sunny,Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes.where? (check all that apply 1 Degree of damage: 8. Contact made with(name): No One Site Title: Inspection report: Sent Report Date given/sent: April I7.2023 9. Corrective action needed: 10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion.however there are some bare areas that need to be stabilized. No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGOI)must be requested by the permittee via a Notice of Termination(NOT)unless permit approval date was prior to April 2019. The NOT is available at:https:•edocs.deq.nc.gov'Fonms/NCGO I-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Others present: Date of inspection: April 1 I.2023 Time arriving on site: 6:25 pm Time leaving site: 6:35 P\I cc: