Loading...
HomeMy WebLinkAboutNCC231280_NOT Signed Certification_20230802 NCGO1 Notice of Termination (NOT) Certification Form Directions: Print this form,complete,scan and upload to the electronic NOT(Rescission)form. Then,mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral& Land Resources Stormwater Program 512 N.Salisbury Street,6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] General Permit Certificate of Coverage (COC) No.: Al Cc a8O Name of Project: H anKS Lak 13.)%tise 2. Per NC General Statute 143-215.66(i),any person who knowingly makes any false statement,representation,or certification in any application, record,report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. ..shall be guilty of a Class 2 misdemeanor which may include aline not to exceed ten thousand dollars($10,000). Under penalty of law,I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge and belief,such information is true, complete, and accurate. Legally Responsible Organizational Entity(must match eNOT): C'cy1Cil I (c( '[ i 'S *Legally Responsible Person(must match eNOT): '3ur,p5 )el'h45e1, *Title of Legally Responsible Person: flcav“-P/ Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person: *Sign ature:ature: Date: o�3 *IMPORTANT OTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,Section B, Item(6)of the NCG010000 permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of the NCG010000 permit.