HomeMy WebLinkAboutNCC192234_WAKE-2020-031 Closeout_20230804North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200
County: Wake Project: East College Park
Person financially responsible: Carolina Cottage Company, LLC - Keith
Greenwood, Member/Manager
Address: PO Box 1422, 505 Caymen Ave, Holly Springs, NC
1. Project Location: 120 N. Carver Street, Raleigh
Pictures: No
2. Weather and soil conditions: rain, partially workable, wet
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
River basin: Neuse
Project #: WAKE-2020-031
Initial inspection: Yes
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): no one
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: January 30, 2023
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Kimberly Summers Others present:
Date of inspection: January 25, 2023 Time arriving on site: 2:00 PM Time leaving site: 3:00 PM
cc:
Yes