Loading...
HomeMy WebLinkAboutNCC232345_Site Plan or Location Map_20230804MAXTON SUBSTATION REVISIONDATEREVFILE NO.DRAWN CHECKED APPROVED D OFDewberry Project No. 50130785 DM ZAE ZAEFOR CONSTRUCTION7/31/20230 170824H01 WE A T H E R S P O O N - L I B B E Y O W E N S F O R D 1 1 5 K V - R E C O N D U C T O R M A X T O N - P E M B R O K E & R E P L A C E S W 170824H01 WEATHERSPOON - LIBBEY OWENS FORD 115KV - RECONDUCTOR MAXTON - PEMBROKE & REPLACE SW DM ZAE ZAENCDEQ MODIFICATION7/31/20231170824H01 PEMBROKE SUBSTATION VICINITY MAP SCALE: 1:16,000 WEATHERSPOON - LIBBEY OWENS FORD 115 KV - RECONDUCTOR MAXTON - PEMBROKE & REPLACE SWITCH EROSION & SEDIMENT CONTROL & ACCESS PLAN ROBESON COUNTY, NORTH CAROLINA 1 COVER SHEET 19 GENERAL NOTES 1.APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED BY DUKE ENERGY AND ARE FOR REFERENCE ONLY. THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. 2.BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES. AERIAL PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. 3.NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE, BOTH VERTICAL AND HORIZONTAL, EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. 4.ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL NOT DISTURB UTILITY POLES, GUYS WIRES, OR ANCHORS WITHOUT PERMISSION FROM DUKE ENERGY. 5.PROJECT IS LOCATED IN THE LUMBER RIVER BASIN. 6.SEE SHEETS 15 AND 16 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. 7.STREAMS EXTEND BEYOND THE RIGHT-OF-WAY. APPROPRIATE BRIDGING AND MATTING OF THESE FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF THE RIGHT-OF-WAY. 8.ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY PERMITTING PRIOR TO USE. 9.CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. 10.WETLAND MATTING SHALL BE COMPOSITE AND/OR HEAVY DUTY TIMBER/"CRANE" MATS. NO LATTICE OR TWO-PLY MATTING SHALL BE USED IN JURISDICTIONAL WETLANDS AND/OR STREAMS. 11.NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 125 FEET OF WETLANDS OR SURFACE WATER WITHOUT CONTAINMENT. 12.SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY/WEEK. MIGRATORY BIRD HOTLINE STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY SERVICE AREA. INTERACTIONS OF BIRDS WITH GENERATING FACILITIES, TRANSMISSION AND DISTRIBUTIONS, SUBSTATIONS, OTHER STRUCTURES AND EQUIPMENT, AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. CAROLINAS: 800.573.3853 FLORIDA: 727.386.3084 MIDWEST: 317.430.4497 SPILL REPORTING HOTLINE IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT, FEDERAL AND STATE LAWS REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION. IMMEDIATELY NOTIFY YOUR SUPERVISOR AND THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS DISCOVERED. IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL, CONTACT ONE OF THE DUKE ENERGY SPILL REPORTING HOTLINES AT: CAROLINAS & MIDWEST: 800.527.3853 FLORIDA: 866.769.1266 CONTACTS SHEET LIST: COVER SHEET SHT 1 OF 19 OVERALL PROJECT LAYOUT SHT 2 OF 19 EROSION CONTROL MEASURE QUANTITIES SHT 3 OF 19 EROSION & SEDIMENT CONTROL PLAN 1 SHT 4 OF 19 EROSION & SEDIMENT CONTROL PLAN 2 SHT 5 OF 19 EROSION & SEDIMENT CONTROL PLAN 3 SHT 6 OF 19 EROSION & SEDIMENT CONTROL PLAN 4 SHT 7 OF 19 EROSION & SEDIMENT CONTROL PLAN 5 SHT 8 OF 19 EROSION & SEDIMENT CONTROL PLAN 6 SHT 9 OF 19 EROSION & SEDIMENT CONTROL PLAN 7 SHT 10 OF 19 EROSION & SEDIMENT CONTROL PLAN 8 SHT 11 OF 19 EROSION & SEDIMENT CONTROL PLAN 9 SHT 12 OF 19 EROSION & SEDIMENT CONTROL PLAN INSET A SHT 13 OF 19 EROSION & SEDIMENT CONTROL PLAN INSET B SHT 14 OF 19 EROSION & SEDIMENT CONTROL DETAILS 1 SHT 15 OF 19 EROSION & SEDIMENT CONTROL DETAILS 2 SHT 16 OF 19 EROSION & SEDIMENT CONTROL DETAILS 3 SHT 17 OF 19 NCG01 DETAIL 1 SHT 18 OF 19 NCG01 DETAIL 2 SHT 19 OF 19 OWNER: DUKE ENERGY PROGRESS, LLC KHADIJAH HASAN 411 FAYETTEVILLE STREET RALEIGH, NC 27601 PH: (336) 340-4312 KHADIJAH.HASAN@DUKE-ENERGY.COM CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL" (811) OR (1-800-632-4949) AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDED THEIR OWN LOCATOR SERVICES INDEPENDENT OR "NORTH CAROLINA ONE CALL". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. LATITUDE: 34.724093° LONGITUDE: -79.341341° PROJECT NARRATIVE THE PROPOSED WEATHERSPOON-LIBBY OWENS FORD 115KV - RECONDUCTOR MAXTON - PEMBROKE & REPLACE SW PROJECT IS LOCATED IN ROBESON COUNTY, NORTH CAROLINA. THE PROJECT INCLUDES APPROXIMATELY 9 MILES OF THE EXISTING WEATHERSPOON-LIBBY OWENS 115KV TRANSMISSION LINE FROM MAXTON TO PEMBROKE TO BE RECONDUCTORED AND TWO REMOTE SWITCHES WILL BE INSTALLED ALONG THE EXISTING LINE. THE PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT OF WAY. THE PRIOR USE OF THE SITE IS TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE. PRIOR TO CONSTRUCTION, A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION. AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES, WHENEVER POSSIBLE. EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ. THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN APRIL 2024 AND BE COMPLETED IN APRIL 2026. ENGINEER: DEWBERRY ENGINEERS INC ZACHARY EULO, PE 2610 WYCLIFF ROAD SUITE 410 RALEIGH, NC 27607 PH: 919.425.7610 ZEULO@DEWBERRY.COM BARKER LAYDOWN YARD (6862 RENNERT ROAD, SHANNON, NC 28386)