HomeMy WebLinkAboutNCC232320_NOI Application_20230803 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 8/1/2023 4:26:52 PM(NCG01 NOI Submission)
Approve by Brooklyn.Broussard 8/2/2023 7:03:29 AM(Review-NOI 153453 Lephart Residence)
• The task was assigned to DEMLR NCG01 NOI Review Team.The due date is:August 4,2023 5:00 PM
8/1/2023 4:27:03 PM
• The task was assigned to Brooklyn.Broussard by round robin distribution 8/1/2023 4:27:03 PM
Submit by Tev.Holloman 8/3/2023 1:54:13 PM(Payment Verification for NCC232320)
•Lily Camina-Vick
• The task was assigned to DEMLR NCG01 Payment Team.The due date is:September 13,2023 5:00
PM 8/2/2023 7:03:44 AM
• Tev.Holloman assigned the task to Tev.Holloman 8/3/2023 1:53:47 PM
Construction Stormwater: Notice of Intent (NOI)
National Pollutant Discharge Elimination System(NPDES)
fiapplication General Permit 1 1 1 1 1 •' associated
NORTH CAROUNA
Environmental Quality
A. Project Information
Part A.
Project Location and Waterbody Information
...................................................................................................................................................................................................................................................................................................................................................................................................
Are you submitting an NOI that was rejected before?
No
Yes
1a.Project Name*
Lephart Residence
1b.Specific Lot Numbers
This field may be used to list specifc lot numbers.
436
1c.Parcel ID Number(s)(PIN)
List all PINS associated with this project.
857310352474
2.County*
Moore
3.Highway or Street Address*
114 Heatherhurst Place
Street name only is acceptable if no address number assigned yet
4.City or Township*
Southern Pines
5.State* NC
6.Zip Code* 28387
7. Latitude* Enter the latitude in decimal degrees
35.2205
8. Longitude* Enter the longitude in decimal degrees(MUST be negative)
-79.4243
If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North
Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 08/14/2023
Estimated Construction Project Start Date
10. Date to End* 08/13/2024
Estimated Construction Project End Date
11.SIC(Primary)*
Residential,Single Family Houses(SFE)(1521)
Standard Industrial Classification for Development
12.Acres to be 1.25
disturbed* (including off-site borrow and waste areas)
13.Total site area 0.30
(acres)*
14. Post-construction 0.14
impervious area (Estimated)
(acres)*
Project Tracking ID NCC-MOORE-2023-Lephart Residence
Assigned automatically(not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter
only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter
up to 3 waterbodies if needed.
15a.Receiving Waterbody*
Juniper Branch
Name of waterbody into which stormwater runoff will discharge
15b.Waterbody Index No.*
18-23-3-2
NC Waterbody Index Number
Stormwater discharges will flow to additional waters*
No
Yes
16a.Is this project subject to the NC Sediment Pollution Control Act?*
Yes
No, not subject to NC SPCA
17. Is this project funded with ARPA(American Rescue Plan Act)grant funds?
No
Yes
This question was added to the eNOI on 1/26/2023 and will not be answered in applications submitted prior to that date.
B. Permittee Information
Part B.
Permittee Information-Legally Responsible Entity and Individual
......................................................................................................................................................................
Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form must be the same person as listed in THIS SECTION,or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity,such as
a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV,Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
1. Permittee*
Legally Responsible Entity
Camina Construction, Inc.
If permittee is an individual,enter first and last name in this field.Otherwise,enter organization/business name.
Note: If the permittee is a business,the business must be registered with the INC Secretary of State.You can verify the
registration here. Permittee must be the same entity that is responsible for the land-disturbing activity as listed on the NC
SPCA Financial Responsibility/Ownership(FRO)Form.
2. First Name* Lily
If Corporation,enter Registered Agent First Name
3. Last Name* Camina-Vick
If Corporation,enter Registered Agent Last Name
3b.Title VP of Design
4. Permitee E-mail Address*
lily@caminadesign.com
5. Permittee Telephone No.*
9106902249
6. Permittee Mailing Address*
Street Address
165 Fox Hollow Court
Address Line 2
City State/Province/Region
Pinehurst North Carolina
Postal/Zip Code Country
28374 United States
Check box if the street address the same as mailing address
Yes
7. Permittee Street Address*
Street Address
165 Fox Hollow Court
Address Line 2
City State/Province/Region
Pinehurst North Carolina
Postal/Zip Code Country
28374 United States
B.Type of Ownership*
Ownership is only individual if an individual is named in B.1.above.
Non-Government
C. Site Contact Information
Part C.
Project Site Contact Information
................................................................................................................................................................................................................................................................................................................................................................................................
1. Primary Site Contact-First Name*
Lily
2. Primary Site Contact-Last Name*
Camina-Vick
3.Title
VP of Design
4.Site Contact E-mail Address*
lily@caminadesign.com
5.Site Contact Telephone No.*
9106902249
6.Organization Name
Camina Design&Construction
7.Site Contact Mailing Address*
Street Address
165 Fox Hollow Court
Address Line 2
City State/Province/Region
Pinehurst North Carolina
Postal/Zip Code Country
28374 United States
8.Consultant Name
(Optional)
First and Last name
9.Consultant E-mail
This person will be copied on all correspondence.
10.Consultant Telephone No.
11.Billing E-mail
(For Annual Fee correspondence)
lily@caminadesign.com
Default is legally responsible person e-mail
12. Billing Telephone
(For Annual Fee correspondence)
9106902249
Default is legally responsible person telephone
D. E&SC Plan
Part D.
Erosion&Sediment Control(E&SC)Plan Approval Information
......................................................................................................................................................................
1. Date E&SC Plan 07/31/2023
Approved*
2. E&SC Plan Project 23-1303
Number/ID* Assigned by agency or local program
3. E&SC Plan State DEQ Office
Approved by* Local Program
4. Local Program* Town of Southern Pines
Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project(for linear projects,can
include the beginning point and end point coordinates in the"Notes"box below).
5. E&SC Plan Permit-Minor Erosion Control.PDF 100.33KB
Approval letter or Must be PDF format
Grading Permit
6.Signed FRO Financial Responsibility/Ownership Form
Lephart ESC Financial Responsibility Form(2020)
922.75KB
Revised_202108171521160996.pdf
Must be PDF format
7.Site Location Map Must be PDF format(limit 20 MB)
07.24.23 Lephart SITE PERMIT.pdf 2.3MB
Please do not upload entire set of E&SC plans.
8. Notes(Optional) Provide any additional information that might help the reviewer better understand how uploaded documents
support the application.Include additional waterbodies if necessary.
9. NOI Certification NCG01 Notice of Intent(NOI)Certification Form.pdf 395.53KB
Form Must be PDF format
This is an Express No
Review Project* Yes
E. Certification
North Carolina General Statute 143-215.613(1)provides that:
Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document
filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
* I am the person responsible for the construction activities of this project,for satisfying
the requirements of this permit,and for any civil or criminal penalties incurred due to
violations of this permit.
* The information submitted in this NOI is,to the best of my knowledge and belief,true,
accurate,and complete based on my inquiry of the person or persons who manage the
system,or those persons directly responsible for gathering the information.
* I will abide by all conditions of the NCG010000 General Permit and the approved
Erosion and Sediment Control Plan.
* If the Erosion and Sediment Control Plan approved by the delegated program is not
compliant with Part II(Stormwater Pollution Prevention Plan)of the NCG010000
General Permit, I will nonetheless ensure that all conditions of Part II of the permit are
met on the project at all times.
* I hereby request coverage under the NCG010000 General Permit and understand that
coverage under this permit will constitute the permit requirements for the discharge(s)
and is enforceable in the same manner as an individual permit.
Specify if you are:* The Legally Responsible Person named on this Notice of Intent
Authorized Responsible Person"(signing on behalf of Legally Responsible Person
named in Part B)
Important:The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible
person within the same organization as the Permittee.
'An authorized individual is a responsible corporate officer who owns or operates the construction activity,such as a
president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
Signature
Type Name* Lily Camina-Vick
Title VP of Design
Organization Legally Responsible Entity
Camina Construction, Inc
Date* 08/01/2023
F. Tracking and COC Info
NOI Tracking No. 153453
NC Reference No. NCG01-2023-2320
Indicates NCG01 or NCG25.Uses NOI number until approved,then uses NUMBER incremented by SP(passed
from workflow if eNOI approved)
Certificate of NCC232320
Coverage(COC)No.* Uses NOI number until approved,then uses NUMBER incremented by SP(formatted and passed from workflow if
eNOI approved)
Initial Invoice No. NCC232320-2023
Invoice Due Date 9/1/2023
Initial Fee $ 100.00
Invoice Status OPEN