December 13, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
Catawba County
Attention: Mick Berry,County Manager
25 Government Drive
Newton,North Carolina 28658
RE: Project Name: E. Maiden Road&Highway 150 Gravity Sewer
Acres Approved: 2.63
Project ID: CATAW-2022=008
County:Catawba,City: Maiden
Address: Highway 150
River Basin: Catawba
Stream Classification: Other
Submitted By: Catawba County
Date Received by LQS: November 19,2021
Plan Type: New
Dear Mr.Berry:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and hereby issue this letter of Approval with Modifications.The Modifications Required for Approval are
listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General
Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named
project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette
Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct
NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for
coverage under the NCGO1 permit. However, on or after May 1, 2019, a$100 fee will be charged annually. This fee is
to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
, --...,1,)
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115
704-663-1699
orw4�
Letter of Approval with Modifications
Catawba County
December 13, 2021
Page 2 of 3
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the
revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the
information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date
for this project.
Your cooperation is appreciated.
Sincerely,
1A4 9�
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
c: Highfill Infrastructure Engineering
Attention: Jordan T. Taylor,PE
380 Knollwood Street, Suite 734
Winston Salem,North Carolina 27103
Inspection Department
Letter of Approval with Modifications
Catawba County
December 13, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: E.maiden Road&Highway 150 Gravity Sewer
Project ID: CATAW-2022-006
County: Catawba
1. The new NCGO 1 Construction stormwater permit requires Ground Stabilization and Materials Handling and
Self-Inspection, Recordkeeping and Reporting requirements on your plans. The NCGO1 compliance plan sheets
for these can be found at https://deq.ne.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-
permits/stormwater-permits/construction-sw.
2. Copies of any wetland determinations or Water Quality Certifications (401/404) for this project from the
Army Corps and/or Water Quality Regional Operations Section, as well as any local approvals for
activity within the buffers must be provided to our office prior to conducting land disturbing activities in
those areas. All requested information must be received and approved prior to construction. Please
submit all requested information at one time. [15A NCAC 4B .0106(1), Clean Water Act, Sections 401
and 404]. Reference sheet C-1.1