Hi Holley,
One issue is we don't know this model, so I'm not sure how we can review it, even if we somehow
found time to have them provide training and pay for a subscription. This model isn't something we
would allow for NPDES permitting because it is not free, I don't know that 401 should be any
different. Bottom line is, if a model is needed I don't know how we can use what they gave us. It's
a shame really, this is the reason we ask for a modeling study plan prior to wasting money on
something we can't use.
Is there a way to use what they've given us without us expressly approving the model? Here are
some of Andy's initial comments:
1. I'm not familiar with the TOPEX/POSEIDON global tidal model they got hydrodynamic
conditions from and what time frame they used. I'm not familiar with the model or
the coefficients used, and the model is not free.
2. Based on newer design of the basin, in my opinion the basin would have no problem
flushing and the model results sound reasonable. Had the newer design been
proposed initially I don't think modeling would have been necessary.
3. 1 looked up DO near the project yesterday (images attached). The data ends a while
back but DO looked good and I don't see DO being an issue here.
4. FYI, there is a much larger upland basin with a worse design than the proposed here,
0.6 miles up the intracoastal; that could have been monitored for a worst case
scenario.
Happy to have a group call to strategize if necessary.
Thanks,
Pam
From: Snider, Holley <holley.snider@deq.nc.gov>
Sent: Friday, July 7, 2023 2:29 PM
To: Behm, Pamela <pamela.behm@deq.nc.gov>; Wojoski, Paul A <Paul.Wojoski@deq.nc.gov>,
Painter, Andy <andy.painter@deq.nc.gov>
Cc: Goss, Stephanie <stephanie.goss@deq.nc.gov>; Higgins, Karen <karen.higgins@deq.nc.gov>;
Homewood, Sue <sue.homewood@deq.nc.gov>
Subject: RE: [External] RE: West Carteret Boat Ramp Flushing Model
Hey Pam,
I certainly wish they had consulted with us as well. The applicant and consultant were advised
during multiple interagency scoping meetings that the modeling and DO info would need to be
reviewed by DWR. During those meetings the applicant had not quantified impacts associated with
the development of the site nor provided any basin or channel dimension plans for review. The
circulation of the CAMA major permit application to the resource agencies for comment is the first
presentation of all of the impacts proposed, the ramp, channel, basin design, etc. If your group
requires more information on the model utilized for DWR to complete a thorough analysis of the
report submitted, please advise ASAP. DWR is able to place the 401 review 'on -hold' pending
receipt of the information that will allow you to review the model, the results and provide
comment. I am happy to communicate your request for the model information to the applicant and
consultant if necessary.
The DWR 60-day deadline to take action in accordance with 15A NCAC 02H .0507 is 8/4/23.
Thanks again for your assistance.
Sincerely,
Holley Snider' -
Environmental Specialist II
Division of Water Resources
North Carolina Department of Environmental Quality
Phone: (910) 796-7303
*please note my email address has changed ho11ey.snider6 deq.nc.gov*
MQ�
D
O�Y111bINrY1 �M'nl GI�RIx
127 Cardinal Drive Ext.
Wilmington, NC 28405
From: Behm, Pamela <pamela.behm(@deq.nc.gov>
Sent: Friday, July 7, 2023 11:09 AM
To: Snider, Holley <holley.snider(@deq.nc.gov>; Wojoski, Paul A <Paul.Wojoski(@deq.nc.gov>;
Painter, Andy <and)1_painter(cDdeq.nc.gov>
Cc: Goss, Stephanie <stephanie.goss(@deq.nc.gov>; Higgins, Karen <karen.higgins(@deq.nc.gov>
Subject: RE: [External] RE: West Carteret Boat Ramp Flushing Model
Hi Holley,
When do you need comments? I wish they had consulted with us first, I'm not sure how much help
we can provide as we are not familiar with the model they used.
Thanks,
Pam
From: Snider, Holley <holley.snider(@deq.nc.gov>
Sent: Wednesday, July 5, 2023 4:31 PM
To: Wojoski, Paul A <Paul.Wojoski(@deg.nc. ov>; Painter, Andy <and)1_painter(@deq.nc.gov>; Behm,
Pamela <pamela.behm(@deq.nc.gov>
Cc: Goss, Stephanie <stephanie.goss(@deq.nc.gov>; Higgins, Karen <karen.higgins(@deq.nc.gov>
Subject: FW: [External] RE: West Carteret Boat Ramp Flushing Model
Good afternoon All,
Please review the attached document and provide comments when you are able, including the lack
of information provided regarding DO. The project is a new proposed Western Carteret County Boat
ramp facility (20230797). As always, I thank you in advance and appreciate your assistance. Let me
know if you have any questions.
Sincerely,
Holley Snider.' -
Environmental Specialist 11
Division of Water Resources
North Carolina Department of Environmental Quality
Phone: (910) 796-7303
*please note my email address has changed ho11ey.snider(Mdeq.nc.gov*
NpRT �3!"�.the+t
_E �' 5
wvMan�nrar+nva�+�t..in.�,i�� f''�
127 Cardinal Drive Ext.
Wilmington, NC 28405
From: Huggett, Douglas <dhuggett(@moffattnichol.com>
Sent: Wednesday, July 5, 2023 11:20 AM
To: Bodnar, Gregg <gregg.bodnar(@deq.nc.gov>
Cc: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair(@usace.army.mil>; Snider, Holley
<holle)1.snider(@deq.nc.gov>; Huggett, Douglas <dhuggett(@moffattnichol.com>
Subject: [External] RE: West Carteret Boat Ramp Flushing Model
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
G regg
I apologize for that — I looked into this and you are correct that it does not look like I uploaded the
flushing study. The study is attached. By copy of this email, I am also sending a copy of the flushing
study to the Corps and DWR.
Please let me know if you have any questions on this.
Sorry again about the confusion.Doug
Environmental Permit Specialist/Project Manager
Moffatt & Nichol
305 Commerce Ave.
Morehead City, NC 28557
Main 919.781.4626 ext.12149
Direct 919.645.0649
Cell 919.534.6834
Creative People, Practical Solutions. 11
From: Bodnar, Gregg <gregg.bodnarCcDdeq.nc.gov>
Sent: Wednesday, July 5, 2023 10:58 AM
To: Huggett, Douglas <dhuggett(@moffattnichol.com>
Subject: West Carteret Boat Ramp Flushing Model
CAUTION: This email originated from outside of the organization.
Morning Doug,
Is the flushing model available? And was it uploaded into the ePermit system? I cannot locate it.
Thanks,
Gregg
Gregg Bodnar (he/him/his)
Major Permits Coordinator
Division of Coastal Management
North Carolina Department of Environmental Quality
(252) 515-5416 (NEW OFFICE NUMBER)
As part of DEQ's phased email update, all Division of Coastal Management emails are now
@deq.nc.gov. Please note my new email address (gregg.bodnarPdeq.nc.gov). Our email addresses
may look different, but email performance will not be impacted.
h
Find a Field Rep (arcgis.com) 0
ier.���DNORTH CAROLINA - EQ2�
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
parties by an authorized state official.