Loading...
HomeMy WebLinkAbout20230797 Ver 1_Other_20230707From: Behm, Pamela To: Snider, Hollev; Wojoski, Paul A; Painter, Andy; Lin, Jing Cc: Goss, Stephanie; Higgins, Karen; Homewood, Sue Subject: RE: [External] RE: West Carteret Boat Ramp Flushing Model Date: Friday, July 7, 2023 3:11:37 PM Attachments: image002.pnng ima eq 003.png DOStationsGraphs.png DOStationLocation s.JPG Hi Holley, One issue is we don't know this model, so I'm not sure how we can review it, even if we somehow found time to have them provide training and pay for a subscription. This model isn't something we would allow for NPDES permitting because it is not free, I don't know that 401 should be any different. Bottom line is, if a model is needed I don't know how we can use what they gave us. It's a shame really, this is the reason we ask for a modeling study plan prior to wasting money on something we can't use. Is there a way to use what they've given us without us expressly approving the model? Here are some of Andy's initial comments: 1. I'm not familiar with the TOPEX/POSEIDON global tidal model they got hydrodynamic conditions from and what time frame they used. I'm not familiar with the model or the coefficients used, and the model is not free. 2. Based on newer design of the basin, in my opinion the basin would have no problem flushing and the model results sound reasonable. Had the newer design been proposed initially I don't think modeling would have been necessary. 3. 1 looked up DO near the project yesterday (images attached). The data ends a while back but DO looked good and I don't see DO being an issue here. 4. FYI, there is a much larger upland basin with a worse design than the proposed here, 0.6 miles up the intracoastal; that could have been monitored for a worst case scenario. Happy to have a group call to strategize if necessary. Thanks, Pam From: Snider, Holley <holley.snider@deq.nc.gov> Sent: Friday, July 7, 2023 2:29 PM To: Behm, Pamela <pamela.behm@deq.nc.gov>; Wojoski, Paul A <Paul.Wojoski@deq.nc.gov>, Painter, Andy <andy.painter@deq.nc.gov> Cc: Goss, Stephanie <stephanie.goss@deq.nc.gov>; Higgins, Karen <karen.higgins@deq.nc.gov>; Homewood, Sue <sue.homewood@deq.nc.gov> Subject: RE: [External] RE: West Carteret Boat Ramp Flushing Model Hey Pam, I certainly wish they had consulted with us as well. The applicant and consultant were advised during multiple interagency scoping meetings that the modeling and DO info would need to be reviewed by DWR. During those meetings the applicant had not quantified impacts associated with the development of the site nor provided any basin or channel dimension plans for review. The circulation of the CAMA major permit application to the resource agencies for comment is the first presentation of all of the impacts proposed, the ramp, channel, basin design, etc. If your group requires more information on the model utilized for DWR to complete a thorough analysis of the report submitted, please advise ASAP. DWR is able to place the 401 review 'on -hold' pending receipt of the information that will allow you to review the model, the results and provide comment. I am happy to communicate your request for the model information to the applicant and consultant if necessary. The DWR 60-day deadline to take action in accordance with 15A NCAC 02H .0507 is 8/4/23. Thanks again for your assistance. Sincerely, Holley Snider' - Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7303 *please note my email address has changed ho11ey.snider6 deq.nc.gov* MQ� D O�Y111bINrY1 �M'nl GI�RIx 127 Cardinal Drive Ext. Wilmington, NC 28405 From: Behm, Pamela <pamela.behm(@deq.nc.gov> Sent: Friday, July 7, 2023 11:09 AM To: Snider, Holley <holley.snider(@deq.nc.gov>; Wojoski, Paul A <Paul.Wojoski(@deq.nc.gov>; Painter, Andy <and)1_painter(cDdeq.nc.gov> Cc: Goss, Stephanie <stephanie.goss(@deq.nc.gov>; Higgins, Karen <karen.higgins(@deq.nc.gov> Subject: RE: [External] RE: West Carteret Boat Ramp Flushing Model Hi Holley, When do you need comments? I wish they had consulted with us first, I'm not sure how much help we can provide as we are not familiar with the model they used. Thanks, Pam From: Snider, Holley <holley.snider(@deq.nc.gov> Sent: Wednesday, July 5, 2023 4:31 PM To: Wojoski, Paul A <Paul.Wojoski(@deg.nc. ov>; Painter, Andy <and)1_painter(@deq.nc.gov>; Behm, Pamela <pamela.behm(@deq.nc.gov> Cc: Goss, Stephanie <stephanie.goss(@deq.nc.gov>; Higgins, Karen <karen.higgins(@deq.nc.gov> Subject: FW: [External] RE: West Carteret Boat Ramp Flushing Model Good afternoon All, Please review the attached document and provide comments when you are able, including the lack of information provided regarding DO. The project is a new proposed Western Carteret County Boat ramp facility (20230797). As always, I thank you in advance and appreciate your assistance. Let me know if you have any questions. Sincerely, Holley Snider.' - Environmental Specialist 11 Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7303 *please note my email address has changed ho11ey.snider(Mdeq.nc.gov* NpRT �3!"�.the+t _E �' 5 wvMan�nrar+nva�+�t..in.�,i�� f''� 127 Cardinal Drive Ext. Wilmington, NC 28405 From: Huggett, Douglas <dhuggett(@moffattnichol.com> Sent: Wednesday, July 5, 2023 11:20 AM To: Bodnar, Gregg <gregg.bodnar(@deq.nc.gov> Cc: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair(@usace.army.mil>; Snider, Holley <holle)1.snider(@deq.nc.gov>; Huggett, Douglas <dhuggett(@moffattnichol.com> Subject: [External] RE: West Carteret Boat Ramp Flushing Model CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. G regg I apologize for that — I looked into this and you are correct that it does not look like I uploaded the flushing study. The study is attached. By copy of this email, I am also sending a copy of the flushing study to the Corps and DWR. Please let me know if you have any questions on this. Sorry again about the confusion.Doug Environmental Permit Specialist/Project Manager Moffatt & Nichol 305 Commerce Ave. Morehead City, NC 28557 Main 919.781.4626 ext.12149 Direct 919.645.0649 Cell 919.534.6834 Creative People, Practical Solutions. 11 From: Bodnar, Gregg <gregg.bodnarCcDdeq.nc.gov> Sent: Wednesday, July 5, 2023 10:58 AM To: Huggett, Douglas <dhuggett(@moffattnichol.com> Subject: West Carteret Boat Ramp Flushing Model CAUTION: This email originated from outside of the organization. Morning Doug, Is the flushing model available? And was it uploaded into the ePermit system? I cannot locate it. Thanks, Gregg Gregg Bodnar (he/him/his) Major Permits Coordinator Division of Coastal Management North Carolina Department of Environmental Quality (252) 515-5416 (NEW OFFICE NUMBER) As part of DEQ's phased email update, all Division of Coastal Management emails are now @deq.nc.gov. Please note my new email address (gregg.bodnarPdeq.nc.gov). Our email addresses may look different, but email performance will not be impacted. h Find a Field Rep (arcgis.com) 0 ier.���DNORTH CAROLINA - EQ2� Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.