LETTER OF APPROVAL
International Tie Disposal,LLC
Basil Polivka,President&CEO/Member
13700 Providence Road, Suite 200
Weddington,NC 28104
RE: Project Name: International Tie Disposal,Hamlet Yard
Acres Approved: 52.5
Project ID: RICHM-2024-001
County: Richmond,City: Hamlet
Address: Marks Creek Church Road
River Basin: Lumber
Stream Classification: Other
Submitted by: Brett Garvey
Date Received by LQS: July 12,2020
Plan Type: Residential
Dear Mr. Polivka:
This office has reviewed the subject erosion and sedimentation control plan.We find the
plan to be acceptable and hereby issue this Letter of Approval.The enclosed Certificate of
Approval must be posted at the job site.This plan shall expire three(3)years following the
date of approval, if no land disturbing activity has been undertaken,as is required by Title
15A NCAC 4B .0129.
As of April 1,2019,all new construction activities are required to complete and submit an
electronic Notice of Intent(NOI)form requesting a Certificate of Coverage(COC)under the
NCG010000 Construction Stormwater General Permit. This form MUST be submitted and
COC issued prior to the commencement of any land disturbing activity on the above-named
project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be
emailed to you within three business days. Initially,DEMLR will not charge a fee for
coverage under the NCG01 permit. However,on or after June 1,2019,a$100 fee will be
charged annually.This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
North Carolina Department of Environmental Quality ! Division of Energy,Mineral and Land Resources
Fayetteville Regional Office C 225 Green Street.Suite 714E Fayetteville.North Carolina 2830i
<_.,r: r., 910.433.3300
Title 15A NCAC 4B .O118(a)and the NCGO1 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC,once it is received.
3. Records of inspections made during the previous 30 days.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring
protection of existing natural resources and adjoining properties. If following the
commencement of this project,the erosion and sedimentation control plan is inadequate to
meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66),this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations,and rules. In addition, local city or county ordinances
. or rules may also apply to this land-disturbing activity. This approval does not supersede
any other peiniit or approval.
Please note that this approval is based in part on the accuracy of the information
provided in the Financial Responsibility Form,which you provided. You are requested to
file an amended form if there is any change in the information included on the form. This
permit allows for a land-disturbance, as called for on the application plan,not to
exceed the approved acres. Exceeding the acreage will be a violation of this permit and
would req
uire a rev
ised wised plan and
additional application fee. Anyaddition
n in impervious
surface, over that already noted on the approved plan, would also require a revised plan
to verify the appropriateness of the erosion control measures and the stormwater retention
measures. (GS 113A-54.1(b)). In addition, it would be helpful if you notify this office of
the proposed starting date for this project.Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Chris Baker
Assistant Regional Engineer
DEMLR-Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: Brett Garvey,P. E., TranSystems—electronic copy
Gary Williams, Richmond County Inspections Office—electronic copy
Fayetteville Regional Office
gi ,5 rr, q-0.1 eD.... ot
CD CD
eDOW• �• 0"ID; C
O
n
o 0 o ® �q " O
Oa 0
w N
0 O E. 741 1-4 g
eD l 1
USG ® ® C O '
CD C C n C cam. wr.
K CD CD r) n
N
�• v
c
° o '
cD un O re)cD �' (Pp
V , 4 _,
0,.., :. 0 0 u'ft. /4,,,,',t---A-<-..: ...L','5.1 '.5. C
,..r r ii;. r•Iffry
•
;ii;, i
›. v ,...:), ,....t. ,„ eit >1",....,
%
~ tt C
¢' : w 00
CM .41
`-7 (-, n til 1=1 o >;mi
- .&-
IO CM SD Cr Z .p TZ r-,
:ri cd 0 z Cr
•
1x
x
i'
S
k
g
1
S
I
i
•
it
P
5
I
I
I
S
p
S
iii
1
p
3
I
1.
1
I
I
,
i
Fact Sheet n the New NCGOI Permit
April 2019 .2,,, ,., .,.
" was renewed on April 1,2019.The updated permit
The NC Construction General Permit(also known as"NCG01")
there is a new
does not significantly change the measures that are required a implemented
described below Most notably,eS However,
there are some organizational and technical updates to thepermit
un
an NCGO1 permit though an
tronic
p
process in which construction sites will obtain official coverage
ma e all of these upd test If you have questions,
process. DEMLR worked with a broad team of stakeholders
contact Annette Lucas at Annette lucas ncd _g.Lov or(919)707-3639.
to Know
organizational Updates Acronymsg roof of coverage under an NCG01 permit
permit; COC: Certificate of Coverage,p Mineral, and Land Resources
The new p DEMLR: NC Division of Energy,
® Repeats state requirements for E&SC
Plans and organizes them with federal E&SC: Erosion&Sedimentation Control
construction
rly o g activity requirements;
e-NO1: Notice of Intent,application form for the NCG01 permit
clearlyorganized by topic; and e-NOT: Notice of Termination,form for closing out the NCG01 permit
• Is g SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01
• Has less text and more tables. � ��� -
Technical Updates
The new permit: ` C"' z
• Requires that the E&SC Plan meet --�
SWPPP requirements(p. 2); k,� r�klK
• Provides a list of items that must be
included in the SWPPP,such as the
construction sequence, plans,
z
calculations, etc. (p. 2-4);' rho
asses and x, �'
• Has updated language on bypasses .4 �E'Y `
upsets that is tailored to construction ` ,.p
activities(p. 10);
• Puts all timeframes for inspections, The NCG01 Process
record-keeping and reporting in"calendar days"for clarity and The new NCG01 applies to permits approved on or after April 1,2019.
consistency(p. 11-14);2 Permittees will no longer receive a copy of the NCGO1 permit in the mail
• Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the
(during business hours)to at least permit. Federal rules require that DEMLR receive an NOIct onitsownach COC.
once per 7 calendar days and after construction project and issue each construction prof
every storm> 1.0 inch(previously 0.5
inch);3 and Under the new NCG01 process,construction sites will continue to
Excludes weekends, state and federal receive approval for E&SC Plans from either DEMLR or the delegated
•
just like before. After receiving E&SC Plan approval,
holidays from normal business hours local E&SC program
unless construction activities take permittees will officially obtain coverage under the NCG01 by
23 . completing an a-NOI (available
to fill out and submit on-line.
b he e-NOI will
place (p ) only take about 20 minut
1 This list is based on website guidance will beno charge associatedwith
there applying for an NCG01
by the DEMLR Sediment Program. permit but on or around June 1, 2019, DEMLR will begin charging a$100
x The number of calendar days was annual general permit fee as required per§143-215.3D.
selected to be as equivalent as m that will allow an
possible with the previous permit. DEMLR is working on creating a single
mfoleran E&SC application permit forrt and an NCG01
3 The intent is to provide predictability applicant to simultaneously apply
to the inspection schedule. COC.That effort is part of a larger Permit Transformation project at
DEMLR.
Q&A About the New NCGO1
Permit
Why do construction sites have to do this extra application step?
DEMLR is required by the EPA to issue a specific COC to every construction delegated local E&SC Programs?O1 affect the 1
site that disturbs one acre or more. DEMLR is working to create a form Local programs will continue to review
that combines the E&SCplan approval /
and e-NOI processes, but that will and approveF
take more time. For now, DEMLR has created an efficient e-NOI process. they will no longer send copies of the
E&SC plans, However, 3
If an E&SC Plan is approvedp s
before April 1,which permit applies? NCGO1 with E&SC Plan approvals.
Projects with alreadyapprovedDEMLR will provide sample language to
E&SC Plans will automatically follow the
new NCG01 permit, but will not need to fill out an e-NOI or pay an annual usein local
E&SC
permit fee.However,the permittees should print the new permit and the advise aermittettees that they must
Plan approvals to
two standard detail sheets and have them on site. submit an e-NOI to DEMLR.
1
Will DEMLR offer tools to help 1
permittees comply with the new NCG01?
Yes,DEMLR will provide two sample plan sheets at deg,nc.gov/NC01 that L� 4
can be placed into the E&SC plan set. The first covers the site stabilization f, �' g „z
and materials handling portions of the permit, The second sheet covers
the inspection, record keeping and reporting 1
P g portions of the permit. �,,, l ,' , 'r
How will the new e-NOI submittal and COC process work? a
� "a �. 1
Permittees will apply for E&SC Plan approvalss I
from either DEMLR or the
delegated loco!E&SC program Pike before, The E&SC a
instruct the permittee to visit de .nc. ov NCG01 to submitr anoval le-NOI foetter rm programs are not required
to DEMLR.The permittee may begin the construction activit after Local q ed to
submittal of the e-NO1.The permittee is required to print a copyof the check if permittees have submitted e
permit and retain it on site. Initially,the COC will be issued for free but on NOIs to DEMLR' However, if they wish
or around June 1, 2019,a $100 annual general permit fee will be charged, to do this blevoluntarily,OEthere will be a
tool available on DEMLR's web site for
Who is allowed to submit an e-NOI form? them to view a list of construction
Submittal must be by a responsible corporate officer that owns or projects that have submitted e-NOIs.
operates the activity,such as a president,secretary, treasurer,or vice When local programs close out an E&SC
president or a manager that is authorized in accordance with IV.B.6 of the Plan,the close-out letter will advise
NCGO1 permit. Additional signatory options are set forth in IV.B.6 of the permittees that they must submit an e-
permit. It is possible for consultant to prepare the e-NOI,save it as a draft,
and email it to the responsible entity for signature &submittal. lannguageMLR will provide sample r
What happens1
to the COC when the construction activity is complete? Local programs may approve E&SC
When a project is complete, the permittees will contact DEMLR or the local
delegated program to close out the E&SC Plan.After DEMLR or the local plans that meet state sediment laws
E&SC program inform the permittee of the project close out via inspection and rules even if those plans are not
report,the permittee will visit deg n. , ,.g v/NCG01 to submit an e-NOT, compliant with all of the NCG01
requirements. However, their
Will there be a grace period for adherence to the new process? permittees will be
required eto providedtwo
by
DEMLR does not have the authority to grant a grace period from a plan sheets
federally mandated permit. Permittees will be informed of the new DEMLR}y fuhy C mply Plans he ground
that the
process via web site, E&SC Plan approval letters and list servs. if a stabilization, materials handling, and
construction activity disturbs one acre or more(or is part of common plan inspection, record-keeping and
of development that disturbs one acre or more)fails to submit an e-NOI
after approvalreporting portion of the NCGO1 permit.
of its E&SC Plan,this is a violation of federal permitting
requirements and the permittee could be subject to a penalty assessment.
1