Loading...
HomeMy WebLinkAboutNCC232302_Site Plan or Location Map_20230801 r �t• �4v� g`�, 0 t44 ft __-_�� - CITY OF HIGH POINT LEGEND .N�iN� EXISTING PROPOSED —mmns`N _=%s`= ENGINEERING SERVICES DEPARTMENT �"-;� �p �p FIRE HYDRANT ■ '■�s ,is. r via e e WATER VALVE fir-M." z ' WATER METER Ca *I'® '�'I:PamIlIngi /b. � I W , . .1 , _ F A .1 , VVVAS"-, I.,,,, d 4 -PUE PUE PUE PERMANENT UTILITY Wm MITE �[�i EASEMENT ,L l �■ �• E��� ■f� ` = S --- Q SANITARY SEWER WITH MH ass �` i ,it_�o.►al NE -roe, EAST OF HOBSON STREET TO EAST DOWNING STREET > > > > EXISTING DITCH SEE TRAFFIC CONTROL PLANS FOR OFFSITE DETOUR G U I L F O R D COUNTY PROPERTY LINE VICINITY MAP —E E E TEMPORARY EASEMENT (NOT TO SCALE) GRAPHIC SCALE TYPE OF WORK: — GRADING, PAVING, STORM SEWER, CURB AND GUTTER, AND SIDEWALKS CUT FILL CUT-FILL LINE PLANS W RIGHT OF WAY 0 20 40 60 APPROXIMATE LENGTH OF PROJECT: ,s," Ego, P""Pso®RM ooE�o, TYPE B CATCH BASIN ® GRATED INLET (IN FEET) TOTAL = 1,890 LF ,o 0 YARD INLET 1 inch = 20 ft. o TYPE"A"CATCH BASIN PROFILE HORIZONTAL a o DRAINAGE MANHOLE 20 0 20 40 60 • • � CURB&GUTTER (IN FEET) 1 inch = 20 ft. J x X X x FENCE • _ j i PROFILE VERTICAL BEGIN co0+650czroN21'11 ---__—_,_________ WOODS LINE —YS—STA.70+65,.00 ----- -1 �--------- -- -- --�-------- 4 0 4 8 12 POWER POLE r' • • BEGIN CONSTRUCTION O • • • • —Y9'—STA.70+75.00 /� I I • TELEPHONE POLE WITH GUY if BEGIN CONSTRUCTION ICI I T 7(IN FEET) BEGIN CONSTRUCTION L 1 inch = 4 ft. YI—STA.70+68.00 z , wl ,4' - i — — — — EDGE PAVEMENT INDEX OF SHEETS BEGIN CONSTRUCTION P. �i , ---------- �__________________ BEGIN PROJECT .� w , "• —Y2—STA.10+II.00 0 - 0 0 ❑ ❑ GUARDRAIL L—STA.ll+00.00 �. iy' SHEET NO. DESCRIPTION 4/ I CENTERLINE �/ 1 TITLE SHEET 4 '_ ` -__� 7 0 ROW PARCEL NUMBER 1A ! EOF RAL NOT o�s�I j L EAST WASHINCTON ST. S. COLLEGE NUMBER 2A-1 THRU 2A-2 TYPICAL SECTIONS NORFOLK SOUTHERN RAILROAD T �W EXISTING WELL 2C-1 GUARDRAIL PLACEMENT DETAIL CC-F-0 PROP.WHEEL CHAIR RAMP 3B-1 ROADWAY SUMMARIES ;•, 3D-1 THRU 3D-2 DRAINAGE SUMMARY SHEETS ` END PROJECT U STA.29+90.00 iiiiiEr 3P-1 PARCEL INDEX SHEET =_: EAST MLE JR DR.4 THRU 7E.WASHINGTON ST PLAN&PROFILE I - -------------------------------- - ht - - - ------------------------------------------- 8 Y LINES PROFILES TMP-1 THRU TMP-8 TRANSPORTATION MANAGEMENT PLANS -^. M ,\� ~ NORTH CAROLINA'S IKTE0.NATIONAI.CITY" PMP-1 THRU PMP-5 PAVEMENT MARKING PLANS � . � 7ny� j� S,' CITY OF HIGH POINT EC-1 THRU EC-11 EROSION CONTROL PLANS 4' c: i' - _' ---- o?% ENGINEERING SERVICES DEPARTMENT 11 SIGN-1 THRU SIGN-6 SIGNING PLANS , ` 'S5 S°��" HIGH POINT, N.C. 27261 UC-1 THRU UC-5 UTILITY PLANS AND PROFILES "r PLANS PREPARED BY: UO-4 THRU UO-7 UTILITY BY OTHERS PLANS DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED X-1A CROSS SECTION SUMMARY SHEET X-1 THRU X-20 -L-E.WASHINGTON STREET STV Engineers,Inc. U STANDARD SPECIFICATIONS: IIISTv�1001600 Perimeter Park Dr. X-21 -Y1-DAY PLACE �,y� Suite 225 60 X-22 THRU X-23 -Y2-SCHOOL ENTRANCE NORTH CAROLINA DEPT. OF TRANSPORTATION, JANUARY 2018 NC Licenseisville, NC Number27e W NC F-0991 X-24 -Y3-ECCLES PLACE STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES ° X-25 -Y4-UNDERHILL STREET ` DESIGN DATA ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER X-26 -Y5-N.DOWNING STREET CITY OF HIGH POINT, STANDARD SPECIFICATIONS AND DETAILS \ ,,,,,,,,,,,� ADT = 4,100 VPD 2017 ,p�p�HCAR07?pa� ,•.,, X-27THRUX-28 L-DRIVEWAY PROFILES FOR ROADS, STRUCTURES AND UTILITIES, (LATEST EDITION) r Waftr�(; ( ) ;moo: ESs,o.N,•,�,, ?: 'ssi --- ADT = 5,400 VPD (2040) :of a o� 4i; 12 Imil before 1Ec l V = 30MPH `SEAL'``• ' SEAL `'' 045257 ° i 038053 P.E. P.E. SIGNATURE SIGNATURE