Loading...
HomeMy WebLinkAboutSW3221008_email_20221018 (2) “Any new development activity… shis not practical to use infiltration methods”.of maintaining stream base flow or the delegated local government shall maintain a written explanation when it nt measures that promote infiltration of flows and groundwater recharge for the purpose stormwater managemestorm, with stormwater control measures (SCMs)… Development and redevelopment shall implement hour -year, 24-the stormwater runoff from the predevelopment and postdevelopment conditions for the oneall control and treat the difference in Peck, Kaitlin From:Farkas, Jim J Sent:Tuesday, October 18, 2022 9:25 AM To:DeBerry, Margie Subject:RE: \[External\] RE: The Estates of Marvin Branch, Marvin, Union County - He does need to pay again, the prior project was returned as administratively incomplete and was closed out (please check BIMS to see if it was actually closed out or not, the prior project number should be on the Application). - If the SCMs are needed to meet the treatment requirements, they need to be included on these forms, as you indicated so that we can make sure that they are adequately designed and are being maintained. You can site 15A NCAC 02B .0602(a) which states, - http://reports.oah.state.nc.us/ncac/title%2015a%20-%20environmental%20quality/chapter%2002%20-%20envi ronmental%20management/subchapter%20b/15a%20ncac%2002b%20.0602.pdf (Projects subject to the Goose Creek Rules are a little strange in that there is technically no allowance for “low-density” projects, all projects, irrespective of density, are treated the same). - Make sure that the wetlands are delineated, simply stating that they will not be impacted in not enough. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Greeson, Mason <mgreeson@cecinc.com> Sent: Tuesday, October 18, 2022 8:50 AM To: DeBerry, Margie <Margie.DeBerry@ncdenr.gov>; bkuhn@joneshomesusa.com Cc: Khan, Zahid <zahid.khan@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: \[External\] RE: The Estates of Marvin Branch, Marvin, Union County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. 1 Margie, Just wanted to clarify a few items while we prepare the requested missing information;  1x application review fee check in the amount of $505. This item is required per 15A NCAC 02H .1042(2). We did not receive a review fee check in the submittal package. We have already submitted and paid for this project, it was returned and we were told to resubmit as a new project. Do we pay again?  2x hard copies of the Application with the following corrections made (This item is required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application):  Section IV, 1 – The O&M Agreement form, Supplement-EZ form, stormwater narrative, and plan sets indicate that an infiltration basin is proposed, but this was not mentioned in the description of how the stormwater runoff will be treated. Please revise as needed. This development is a Low Density project and we are only required to meet the pre and post volume conditions as well as the difference in the Channel Protection volume of pre and post that promotes infiltration per the Six Mile/ Goose Creek requirements to our understanding of the regulations. We are not treating the entire site (low density), only providing enough control for the difference in volume from pre and post. We are doing that with the infiltration Basin. We might be misunderstanding what you are asking for here?  1x hard copy of the property deed. This item is required per Section VI, 10 of the Application. Was included in the package but will send again.  2x signed & sealed hard copies of a plan sheet showing the following:  Wetland delineation or a note on the plans stating that there are no wetlands located on-site. This item is required per 15A NCAC 02H .1042(2)(g)(iii) & Section VI, 8m of the Application. Please also list the name of the individual that made this determination in a note on the plans. There are wetlands on-site and we are not impacting them. Will add that information.  Project boundary delineation with bearings and distances (Required per Section VI, 8i of the Application and 15A NCAC 02H .1042(2)(g)(ii)). – It is noted that the project boundary was delineated, however bearings and distances do not appear to be shown on the plan sheets. Will provide. Was informed to only provide the minimum information needed for stormwater review.  Stormwater maintenance access and easement. This item is required by General MDCs 8 & 9 (15A NCAC 02H .1050(8) & (9)). Will add to the plan.  SCM details. This item is required per Section VI, 8l of the Application and per 15A NCAC 02H .1042(2)(h). Will provide. Mason Greeson, P.E. | Principal Civil & Environmental Consultants, Inc. 3701 Arco Corporate Drive, Suite 400, Charlotte, NC 28273 direct 980.260.2120 office 980.237.0373 mobile 704.900.4755 www.cecinc.com This electronic communication and any attachments are intended solely for the use of the person or entity to which it is addressed, and may contain information that is confidential, privileged and exempt from disclosure under applicable law, including copyright law. If you are not the intended recipient of this message, you are prohibited from disclosing, reproducing, distributing, disseminating or otherwise using this transmission. Please promptly notify the sender by reply electronic communication and immediately delete this message from your system. From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Monday, October 17, 2022 2:58 PM To: rkreisher@joneshomesusa.com; mel@grahamenterprises.org; bkuhn@joneshomesusa.com; Greeson, Mason <mgreeson@cecinc.com> Cc: Khan, Zahid <zahid.khan@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: The Estates of Marvin Branch, Marvin, Union County 2 Good afternoon, We received your application for a new post-construction stormwater permit on 10/14/2022. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 11/16/2022) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  1x application review fee check in the amount of $505. This item is required per 15A NCAC 02H .1042(2). We did not receive a review fee check in the submittal package.  2x hard copies of the Application with the following corrections made (This item is required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application):  Section IV, 1 – The O&M Agreement form, Supplement-EZ form, stormwater narrative, and plan sets indicate that an infiltration basin is proposed, but this was not mentioned in the description of how the stormwater runoff will be treated. Please revise as needed.  1x hard copy of the property deed. This item is required per Section VI, 10 of the Application.  2x signed & sealed hard copies of a plan sheet showing the following:  Wetland delineation or a note on the plans stating that there are no wetlands located on-site. This item is required per 15A NCAC 02H .1042(2)(g)(iii) & Section VI, 8m of the Application. Please also list the name of the individual that made this determination in a note on the plans.  Project boundary delineation with bearings and distances (Required per Section VI, 8i of the Application and 15A NCAC 02H .1042(2)(g)(ii)). – It is noted that the project boundary was delineated, however bearings and distances do not appear to be shown on the plan sheets.  Stormwater maintenance access and easement. This item is required by General MDCs 8 & 9 (15A NCAC 02H .1050(8) & (9)).  SCM details. This item is required per Section VI, 8l of the Application and per 15A NCAC 02H .1042(2)(h). NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brought up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Margie DeBerry at Margie.DeBerry@ncdenr.gov or 919-707-9209. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 3 margie.deberry@ncdenr.gov 4