Loading...
HomeMy WebLinkAboutNCC190798_NOT Closeout Documents (2)_20230727 TOWN OF FUQUAY-VARINA SEDIMENT AND EROSION CONTROL INSPECTION REPORT FUQUAY-VAR I NA Town of Fuquay-Varina 401 Old Honeycutt Road Fuqua -Varina NC 27526 Project: Sunset Bluffs Ph 16 Dickerson Lots EC Permit No: EC-2019-24 Site Plan/Subdivision No: N/A River basin: Neuse Disturbed Acreage: 1.8 ac Permit Issue Date: 8/28/19 Permit Expiration Date: 8/28/21 Person financially responsible: Zach Hohns Phone: 919-847-4447 Email:zach@homesbydickerson.com Contractor/Other: Phone: Email: 1. Pictures: No: ® Yes: ❑ Video: ❑ Digital: ❑ 2. Weather and soil conditions: Cloudy, Wet, Un-Workable First inspection: Yes: ❑ No: 3. Is site currently under notice of violation? Yes: ❑ No: 4. Is the site in compliance with S.P.C.A.and rules? Yes: ® No: ❑ If no, check violations below: ❑ a. No approved plan, G.S. 113A-57 (4)and 15A N.C.A.0 4B.0107(c) LDO§9-1407(a)(4)(D) ❑ b. Failure to follow approved plan, G.S. 113A-57(5)LDO§9-1407(b)(1)(H) ❑ c. Failure to submit revised plan, G.S. 113A-54.1(b)and 15A N.C.A.C.4B.0118(a) LDO§9-1407(c)(9) ❑ d. Failure to provide adequate groundcover, G.S. 113A-57(3)and 15A N.C.A.C.4B.0107(b)or 15A N.C.A.C.4B.0124(e) LDO§9-1407(b)(1)(G) ❑ e. Insufficient measures to retain sediment on site, G.S. 113A-57(3)LDO§9-1407 ❑f. Failure to take all reasonable measures, 15A N.C.A.C.4B.0105 LDO§9-1407 ❑ g. Inadequate buffer zone, G.S 113A-57(1) LDO§9-1407 (b)(1)(C) ❑ h. Graded slopes and fills too steep G.S. 113A-57(2)or 15A N.C.A.C.4B.0124(d) LDO§9-1407(b)(1)(E) ❑ i. Unprotected exposed slopes, G.S. 113A-57(2) LDO§9-1407 (b)(1)(G) ❑j. Failure to maintain measures, 15A N.C.A.C. 4B.0113 LDO§9-1407 ❑ k. Failure to self-inspect G.S. 113A-54.1(e)and 15A N.C.A.C.4B.0131 LDO§9-1407 (e)(1) ❑ I. Potential NPDES violation. NCG 010000 and LDO§9-1407 (e)(1) 5. Has sedimentation damage occurred since last inspection or at 1st inspection? Yes: ❑ If yes,where? (check all that apply) No: El Lake/natural watercourse on the tract: El Lake/natural watercourse off the tract: ❑ Other property: ❑ Description: Stormwater Discharge Outfall with sediment loss: Degree of damage: slight: ❑ moderate : ❑ severe : ❑ 6. Contact made with (name): Zach Hohns Title: Project Manager Inspection report given:El or sent: ® to person financially responsible. Date given/sent: 8/31/2020 7. Comments : Last Updated 4/30/19 TOWN OF FUQUAY•VARINA SEDIMENT AND EROSION CONTROL INSPECTION REPORT FUQUAY-1IAR 1 NA Town of Fuquay-Varina 401 Old Honeycutt Road Fuqua -Varina NC 27526 8. Corrective actions needed for S.P.C.A.and rules: ❑ Submit an approvable sedimentation and erosion control plan, including appropriate review fee, covering all areas disturbed or to be disturbed. ❑ Install all sedimentation and erosion control measures as shown on the approved plan. ❑ Submit a revised sedimentation and erosion control plan. ❑ Provide adequate permanent ground cover on all areas where development has been completed according to the time limits in the approved plan. ❑ Install erosion and sediment control devices sufficient to retain sediment on the tract. ❑ Install temporary sediment traps or basins and associated diversions as shown on the approved plan. ❑ Install adequate drop inlet protection as shown on the approved plan. ❑ Provide an adequate stream buffer zone of sufficient width to confine visible sedimentation within the 25%of the buffer nearer the land disturbance using natural or artificial means. ❑ Reduce the angle of graded slopes to an angle on which vegetative ground cover may be established. ❑ For disturbed areas less than one acre, provide adequate temporary or permanent ground cover on all graded slopes where rough or fine grading has been completed for 21 calendar days. ❑ Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage. 9.Additional Corrective Actions: 10. For Final Inspections Only: El Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self- inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Deadline for Compliance is Report by: Gary Janshego Others present: Date of inspection: 8/17/2020 Estimated Time on site: 10 minutes 2IPage Last Updated 4/30/19