HomeMy WebLinkAboutNCC190798_NOT Closeout Documents_20230727 TOWN OF FUQUAY-VARINA
SEDIMENT AND EROSION CONTROL INSPECTION REPORT
FUQUAY-VAR I NA Town of Fuquay-Varina
401 Old Honeycutt Road
Fuqua -Varina NC 27526
Project: Sunset Bluffs Ph 15 Dickerson Lots EC Permit No: EC-2019-10 Site Plan/Subdivision No: N/A
River basin: Neuse Disturbed Acreage: 3.5 Permit Issue Date: 8/28/19 Permit Expiration Date: 8/28/21
Person financially responsible: Zach Hohns Phone: 919-847-4447 Email:zach@homesbydickerson.com
Contractor/Other: Phone: Email:
1. Pictures: No: ® Yes: ❑ Video: ❑ Digital: ❑
2. Weather and soil conditions: Cloudy, Wet, Un-Workable First inspection: Yes: ❑ No:
3. Is site currently under notice of violation? Yes: ❑ No:
4. Is the site in compliance with S.P.C.A.and rules? Yes: ® No: ❑ If no, check violations below:
❑ a. No approved plan, G.S. 113A-57 (4)and 15A N.C.A.0 4B.0107(c) LDO§9-1407(a)(4)(D)
❑ b. Failure to follow approved plan, G.S. 113A-57(5)LDO§9-1407(b)(1)(H)
❑ c. Failure to submit revised plan, G.S. 113A-54.1(b)and 15A N.C.A.C.4B.0118(a) LDO§9-1407(c)(9)
❑ d. Failure to provide adequate groundcover, G.S. 113A-57(3)and 15A N.C.A.C.4B.0107(b)or 15A N.C.A.C.4B.0124(e)
LDO§9-1407(b)(1)(G)
❑ e. Insufficient measures to retain sediment on site, G.S. 113A-57(3)LDO§9-1407
❑f. Failure to take all reasonable measures, 15A N.C.A.C.4B.0105 LDO§9-1407
❑ g. Inadequate buffer zone, G.S 113A-57(1) LDO§9-1407 (b)(1)(C)
❑ h. Graded slopes and fills too steep G.S. 113A-57(2)or 15A N.C.A.C.4B.0124(d) LDO§9-1407(b)(1)(E)
❑ i. Unprotected exposed slopes, G.S. 113A-57(2) LDO§9-1407 (b)(1)(G)
❑j. Failure to maintain measures, 15A N.C.A.C. 4B.0113 LDO§9-1407
❑ k. Failure to self-inspect G.S. 113A-54.1(e)and 15A N.C.A.C.4B.0131 LDO§9-1407 (e)(1)
❑ I. Potential NPDES violation. NCG 010000 and LDO§9-1407 (e)(1)
5. Has sedimentation damage occurred since last inspection or at 1st inspection?
Yes: ❑ If yes,where? (check all that apply) No: El
Lake/natural watercourse on the tract: El Lake/natural watercourse off the tract: ❑ Other property: ❑
Description:
Stormwater Discharge Outfall with sediment loss:
Degree of damage: slight: ❑ moderate : ❑ severe : ❑
6. Contact made with (name): Zach Hohns Title: Project Manager
Inspection report given:El or sent: ® to person financially responsible. Date given/sent: 8/31/2020
7. Comments : All sites are completed and stabilized.
Last Updated 4/30/19
TOWN OF FUQUAY•VARINA
SEDIMENT AND EROSION CONTROL INSPECTION REPORT
FUQUAY-1IAR 1 NA Town of Fuquay-Varina
401 Old Honeycutt Road
Fuqua -Varina NC 27526
8. Corrective actions needed for S.P.C.A.and rules:
❑ Submit an approvable sedimentation and erosion control plan, including appropriate review fee, covering all areas disturbed
or to be disturbed.
❑ Install all sedimentation and erosion control measures as shown on the approved plan.
❑ Submit a revised sedimentation and erosion control plan.
❑ Provide adequate permanent ground cover on all areas where development has been completed according to the time
limits in the approved plan.
❑ Install erosion and sediment control devices sufficient to retain sediment on the tract.
❑ Install temporary sediment traps or basins and associated diversions as shown on the approved plan.
❑ Install adequate drop inlet protection as shown on the approved plan.
❑ Provide an adequate stream buffer zone of sufficient width to confine visible sedimentation within the 25%of the buffer
nearer the land disturbance using natural or artificial means.
❑ Reduce the angle of graded slopes to an angle on which vegetative ground cover may be established.
❑ For disturbed areas less than one acre, provide adequate temporary or permanent ground cover on all graded slopes
where rough or fine grading has been completed for 21 calendar days.
❑ Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent
sedimentation damage.
9.Additional Corrective Actions:
10. For Final Inspections Only:
El Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-
inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit
for Construction Activities should be requested by the permittee via a Notice of Termination.
Deadline for Compliance is
Report by: Gary Janshego Others present:
Date of inspection: 8/17/2020 Estimated Time on site: 5 minutes
2IPage
Last Updated 4/30/19