Loading...
HomeMy WebLinkAboutSW6221006_Supplement-EZ Form_20230731 SUPPLEMENT-EZ COVER PAGE FORMS LOADED 'PROJECT INFORMATION 1 Project Name CCBCC-Fayetteville 2 Project Area(ac) 13.7 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra 2 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Ethan Hart, P.E.-Civil Engineer 28 Organization: Fitts and Goodwin,Inc. 29 Street address: 120 Corporate Blvd. 30 City,State,Zip: West Columbia,SC 29169 31 Phone number(s): (803)331-2991 32 Email: ehart@strategisse.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer �\\ �� Ittlllll11IN "PE ss..oN!..• SEAS = Signature of Designer 051479 , • •'•ONEER.• H ADZ `\\`��� _5 ( 2-3 goimi.seal Date DRAINAGE AREAS r5 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM Filterra Filterra 5_Total drainage area(sq ft) 596772 22651 22651 6 Onsite drainage area(sq ft) 596772 22651 22651 7 Offsite drainage area(sq ft) 0 0 0 8 Total BUA in project(sq ft) 325831 sf 21344 sf 21344 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) - New BUA not on subdivided lots(subject to 10 permitting)(sf) 31798 sf 11 Offsite BUA(sq ft) 1 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) _ 31798 sf -Sidewalk(sq ft) ...___ -Roof(sq ft) — T-Roadway(sq ft)-Future(sq ft) -Other,please specify in the comment box below(sq ft)_ New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 294033 sf 21344 sf 21344 sf 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA _ 55% 94% 94% 19 Design storm(inches) —— _ 1.0 in 1.0 in 20 Design volume of SCM cu ft 1407 cf 1407 cf 21 Calculation method for design volume Discrete Discrete ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Expansion to existing site results in a net increase of 0.73-ac(31,798-sf) impervious area.Runoff from an existing 1-ac parking lot draining to the site's existing basin is being treated by a two(2)-Filterra bioretention SCMs in lieu of modifications to the existing basin. FILTERRA BIORETENTION 1 Drainage area number 1 2 2 Minimum required treatment volume(cu ft) 1407 1407 GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM(H:V)? 6 Does the SCM have retaining walls,gabion walls or other engineered side slopes? Are the inlets,outlets,and receiving stream protected from erosion Yes Yes 7 (10-year storm)? Is there an overflow or bypass for inflow volume in excess of the Yes Yes 8 design volume? 9 What is the method for dewatering the SCM for maintenance? 10 If applicable,will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with N/A N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes FILTERRA BIORETENTION MDC FROM THE STORMWATER DESIGN MANUAL 18 Type of pretreatment that will be used Rip Rap Rip Rap Dissipation Dissipation 19 Depth of storage above the filter media surface(in) 6 in 6 in 20 Surface area of the Filterra Bioretention system(sq ft) 91 sf 91 21 Method of flow distribution over the media Disperse Disperse 22 Infiltration rate of engineered media(inch/hour) 140 in/hr 140 in/hr 23 Diameter of the underdrain pipes(if applicable) 6 in 6 in 24 Does the design include Internal Water Storage(IWS)? No No 25 if so,elevation of the top of the IWS(fmsl) N/A N/A 26 Elevation of the planting surface(fmsl) 94.5 94.7 27 Species of tree(s)that will be planted Eastern Redbud Eastern Redbud 28 Media depth(inches) 15 in 15 in 29 Number of clean out pipes 1 each 1 Will maintenance be performed per the Filterra Operations and Yes Yes 30 Maintenance Manual? ADDITIONAL INFORMATION 31 Please use this space to provide any additional information about the Filterra Unit( ): The ponding depth and filter media depth differ from the MDC.This is due to a shallow existing invert on the catch basin both Filterra units will tie into.The design parameters have been approved by Contech as stated in the attached email.