HomeMy WebLinkAbout820733_Routine Inspection_20230725J
Type of Visit: ommpliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: ,Xe Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: 7 d Arrival Time: Departure Time: ad County:`-44ft
Farm Name:Owner Email:
Owner Name: //C/ G G ( Phone:
Mailing Address:
Physical Address: Facility Contact: ( jj�� �L &4B
Title:
Phone:
Region: .rely
Onsite Representative:
Integrator: 6JJ&9&0
Certified Operator:
Certification Number:
/C30y�(vd
Back-up Operator:
Location of Farm:
Certification Number:
Latitude: Longitude:
k A$a 44, 040 a&b4k H09'b#@'kS$0#; #vs
b>}`y#kN¢1&§ptt$#%�-'awarv#k
iF$�§Nyy#`k#F@k3Yx#Sy4 $4a '8=#8 $444 L:#S &6#iYttB&$b kk9 3T.9e, t#'# 9§at 9§4mR rkaate h0a Y•p 4, #BP4 }@ p@# 4
#6 $kS Sp`ea#aRp]ppto p#t#YM Nir&$Y,Rf}h`Yy§sti&Aq {e8i v li L`04#•• 8>'�3vp4 aN 000s,H
# 448'P#, Btt$#m+gg ffitd #s. Pa $ l ssm,#at-zk $' oak 9�ry$ >!#ib a###+F##A kifkg a4rs#Rdad G§15$ &##k'+I9 40AR':#oil #3#t k�W3e.
9 #b# d '&alJ� its aV ?em $d�yyyy uuuyyy Is all .�{�,}� §5k%y3u ,g,§�¢�*% I&W *" py�.ggU �rt$a6.4 $>b.#it 4�y4 tea n y8 q #il#y'q.
Ut414911a�tt
##s to b#@t . At 0 §k3 I§'l[ 8•t6W,U{{+'It
§fire'kitie §#g §#yp# 6a' $aik#,
111mlp6
5$n pSR4tt4GUA114rt�dd.0}3& F4Y2ttTa g4YM1Y�#rx 'a �*40 $itFAG# �§•+b ib.tc
4 o-8# iF��l�1:11
°ktt ail $1R#i'MX$ x'##�iF#4 5+ poop %#
WW. }1aAtga,
8#$#.:,6_k fi...F4't$dG'iltr^§ ##*119{#u4gsP
11 Wean to Finish
Layer Dairy Cow
Wean to Feeder
fl INon-Layer In Dairy Calf
i Feeder to Finish VqW
Farrow to Wean
§& g s # Dairy Heifer
* a ,IQ s " OV Dry Cow
U
s s#
Farrow to Feeder
o Non -Dairy
# � # on _ �� + p # � ry � -
�' Farrow to Finish
a a
Layers
i�$ Beef Stocker
Gilts
Non -Layers
Pullets
; Beef Feeder
jBeef Brood Cow I*,
to Boars
bt'8$#**st. o*w4 s*so'Mi d�#M
bb p§ va aam ttar ar's xe§err a#Msx*§#tea§ gg,toQVea4W k$
#a§#&bie il#a e,#u Yam iGb!a56 dr§a664tt•'& a t§t$�.
S`1'
Turke s
Turkey Poults
809 25tl8.tt%km aura Way#xx.kY
wr#a.rgg§d#c: pe a
av�=ms$&au§�x$xa:taa§� m ttxz.z#§so
k4+bs4a§m#•##kaA#Ew RmtY##€dz.#F#0a 0#aa4aa#'#I
atw«d F ��k»axe a##x#m #x .#»
• m • tt
..##
6&
Other
sos. d.t minas x �. o-. > mxaxr s•aa
�$ a .# ;9 Bi#9m ,ns t$§aa paw:#$nna w§$ #s #a.ea
F<g # § ra as aP k$so*"#• a�aa�s�## � a '##� � •
saw#a�#e a## #a+x. aR+'m :€ a #a pp $s
v# b#'a; d a# art k'+4s # $+ax#@4F#3#a# I
+#.a t #S a awg aata a
uism u� aamar - s•tt
.a •
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes ,4E5 No ❑ NA ❑ NE
[—]Yes [—]No
❑ Yes ❑ No
❑ NA ❑ NE
❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes --allo ❑ NA ❑ NE
❑ Yes .Eff No ❑ NA ❑ NE
Page I of 3
511212020 Continued
Facility Number: - -2 Date of Inspection: '
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes 12ORo
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes ❑ No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5 Structure
6
Identifier: f
Spillway?:
Designed Freeboard (in): C
Observed Freeboard (in): 31
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes ED'Ao
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes _�'No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes e'No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes ,4^No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes _[E!rNo
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes _ErNo
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes —[] No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into
Bare Soil
❑ Outside of Acceptable Crop Window ❑>�Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): l �/7� cXJcyvCea9¢ 6;f}.4-'L
�
1
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes ,,O-To
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes _�No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes _'No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes ErNo
❑ NA
❑ NE
Reauired Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes ETNo
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes J-No
❑ NA
❑ NE
the appropriate box.
❑ WUP El Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes KNo
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
[—]Yes ETNo
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
[—]Yes ❑rNo
❑ NA
❑ NE
Page 2 of 3
511212020 Continued
Facility Number: - %
Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes _E No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes �No ❑ NA FINE
the appropriate box(es) below. T
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
❑ Yes _❑j No ❑ NA ❑ NE
❑ Yes � No ❑ NA ❑ NE
❑ Yes 0 No ❑ NA ❑ NE
❑ Yes e'No ❑ NA ❑ NE
❑ Yes El -No ❑ NA ❑ NE
❑ Yes e'No ❑ NA ❑ NE
❑ Yes 4�:j No
❑ Yes ❑'No
❑ Yes Ea No
❑ NA ❑ NE
❑NA ❑NE
❑ NA ❑ NE
Phone:9e—e S.%$ ii.2,F3—
Date:
Page 3 of 3 511212020
FACILITY #.� —// FARM NAME: 6c—)622c I2 LAGOON LEVEL
PERMIT pns)
- DUE EVERY 5 YEARS
- - EXPERIATION DATE _
- CURRENT NUMBER OF
- OIC CARD YES OR NO
NUMBER OF ANIMALS
WASTE UTILIZATION PLAN (WUP) (920)
SOIL TYPES
CROP TYPES
- ODOR CONTROL CHECK LIST YES OR NO
- Irrigation Plan Maps YES OR NO
WASTE REPORT (#21)
-GOOD FOR 60/DAYS BEFORE OR AFTER
DATE 2C//rJ q` -3 NITROGEN LEVEL
DATE �q` /�(e �-3 NITROGEN LEVEL
DATE `G aDld-Y NITROGEN LEVEL l
EVERY 3 YEARS:
P-1 (NO MORE THEN 400)
- PH(N.f if4or W.)
Cu2N (NO MORE THEN 8000)
(IF PEANUTS NO MORE THEN 300)
DATE
SOIL REPORT (#Y1)
I RR2 (s21)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
CALBRIATION (ma)
EACH REEL SHOULD BE CALIBRATED EVERY OTHER YEAR
DATE OF CALIBRATION y�lila1
FLOW RATES
RAIN FALL (mt)
-INITIAL AFTER 1" RAIN EVENT _
-LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED PDA NEEDED.
q / LUDGE (mi a2s)
-DUE EVERY YEAR: DATE / d " �I C
O: Y , y P: % RATIO OF SLUDGE 35
O: P: % RATIO OF SLUDGE
0: P: % RATIO OF SLUDGE
0: P: % RATIO OF SLUDGE
OTHER FORMS (uzz AND 921)
RAIN BREAKER FORM CROP YEILDS MORTALITY.
*If fields are grazed there will be no crop yields
VISUAL CHECK
FOUNDATION OR PIT LEAKS PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE
AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES
WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT
CROPS NO PONDING REELS FEED BINS LAGOON GARBAGE
Bermuda grass: Opens March tat- Ends September 30t
Small Grain Over seed: Opens October 1st- Ends March 31 st
Corn: Opens February 15t - Ends June 30*
Cotton: Opens March 15t - Ends August 1st
Rye: Opens September 1 A- Ends March 31st
Oats: Opens September 1 ct- Ends April 15w
Wheat: Opens September 1 st - Ends April 30t
Soybeans: Opens April l st- Ends September 15t
Fescue: Opens August 1 st- Ends July 31 st
Sorghum Hay: Opens March 15i - Ends August 31 st