HomeMy WebLinkAboutNCC222712_NOT Closeout Documents_20230724 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699
County: Iredell Project: Line M-218 Exposure at Damson Lane River basin: Yadkin-PeeDee
Person financially responsible:Public Service Co of NC,Inc-Andrew Moore Project#: IREDE-2022-011
Address: PO Box 1398,800 Gaston Rd,Building A,Gastonia,NC 28053
1. Project Location: Damson Lane,Mooresville
Pictures: No
2. Weather and soil conditions: Sunny,Workable Soils Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No One Onsite Title:
Inspection report: Sent Report Date given/sent: July 14,2023
9. Corrective action needed:
10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion,however there are
some bare areas that need to be repaired and stabilized. No additional self-monitoring or
self-inspections are required.Project is in compliance and released under the SPCA.
Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT)
unless permit approval date was prior to April 2019.
The NOT is available at:https:tledocs.deq.nc.gov/Forms/NCG01-Termination.Please note
that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Jeffrey Chandler Others present:
Date of inspection: July 13,2023 Time arriving on site: 3:00 PM Time leaving site: 3:30 PM
cc: