HomeMy WebLinkAboutShoreline sketch for DEQ.pdf12. Please approximately sketch the following information on this plan and provide dimensions for
each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ formal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
Full Pond/ Normal water Level..
Shoreline
Plan View
Lake
-
- {At Full Pondf Normal Water L. I) Existing D1 k
30ftx7ft
I
i
Vtx Bolt
00— Ut pond/ N WL
Full Pond/Normal Water Level
_
�4
S IOrelln2llL Yw' pw
Riprap
F15a I
Abo fuII pond/NWL
2 ft.' 150 ft.
additionak clearing
`i£rte�essarg
-
- �
I
i
E
AMPLE
Plan View
FORM: SSGP 02-2017 Page 3 of 4
a�
Lake
4-0
(At Full Pond/ Normal Water Level)
C
2l
s-
0
Q
G
Side View lLILL.
3 ft. below full pond water level 4 ft. above full pond water level 2 ft, additional clearing
if necessary
FORM: SSGP 02-2017 Page 4 of 4