Loading...
HomeMy WebLinkAboutShoreline sketch for DEQ.pdf12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ formal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Full Pond/ Normal water Level.. Shoreline Plan View Lake - - {At Full Pondf Normal Water L. I) Existing D1 k 30ftx7ft I i Vtx Bolt 00— Ut pond/ N WL Full Pond/Normal Water Level _ �4 S IOrelln2llL Yw' pw Riprap F15a I Abo fuII pond/NWL 2 ft.' 150 ft. additionak clearing `i£rte�essarg - - � I i E AMPLE Plan View FORM: SSGP 02-2017 Page 3 of 4 a� Lake 4-0 (At Full Pond/ Normal Water Level) C 2l s- 0 Q G Side View lLILL. 3 ft. below full pond water level 4 ft. above full pond water level 2 ft, additional clearing if necessary FORM: SSGP 02-2017 Page 4 of 4