Loading...
HomeMy WebLinkAboutNCG021017_Scanned site map 2 _20230725 Y(y/ . y e i MARTIN COUNTY 17 . 92 ACRES .. '•I etJ3 v �. ; Jx .. _ _ µ r ' �` Y' � ,.max „n '. � l .yyrt 4 �p .� i-''f�•r � „� F .. s - LILLEY, e''+ UNCONTAMINATED EARTHEN MATERIAL GENERATED FROM OFFSITE SOURCES WILL BE USED TO BACKFILL PORTIONS OF N. THE EXCAVATION AREA. BECAUSE THE SITE IS ACTIVELY BEING AND MINED, THE EXACT LOCATION TO DISPOSE OF THE MATERIAL IS UNKNOWN AT THIS TIME. HOWEVER, NO OFFSITE " GENERATED MATERIAL WILL BE DISPOSED OF OUTSIDE OF THE V. , EXISTING APPROVED EXCAVATION LIMITS OF± 12.33 ACRES. THIS OFFSITE MATERIAL WILL ALSO BE USED TO BUILD AND RECLAIM THE SLOPES AROUND THE EXCAVATION AREA. + ; RO N,EDWARD ILLEY,J ELM R EX/`STUNG PO LILLEY,J ELMO JR WY�1NE,IRE E.ROB N ' ., KIRBYSCOTT UZZELL. �oo�� oTVATF°BUF ,. _p�Fe� ONS\MPSEP� FFa�gNT�q/qF — i �'.�� ".;<- •� '• UNO PIER � cs x In TOG�NERPTFOEPRS I r LILLEY, a E VIS,W _IAM T AS ^sF1; TRUST '; ; °c� MITCHELL,MARY WHITLEY,WILLIAM FRANKL'FN'JR- �� TRACT 1 ti CHE N,MI j0'NARD .. 5.58 ACRES. �d �� eE?Gs I P e t P 1 yRU TEE DAVIS^JO�N TRVING SOG2o\ Q C� Pe�oe p� OFFSS TOeq /ST�gBFDq / �' WIL'CIAIU Y : sT �o GF P T R tin TFG CkF cFFF I . / I o TEMPORARY-STOCKPILE / \ I ��oe AREA 0.27'A ES �0�� yo Jee�� FRgT oW WHITEHEAD,JOHNATHAN _I ` .�D�@MARCl� �ECCA AI SHEITON, B CHAPMAN, EDWARM" ,R Cr �• 4 HEAD,JOHNATHAN f 'p��0 MITCHELL,MARY '. NE' B�.' NY A SCOT LLIA �p T WI M+DUKE � •\�` �\�' TRACT 2 o I �—' I i t.:t:•.1. ._ ' - y;, T r PEAKS,J DIE K Off' 7.02-ACRES LEY,J ELMO JR ETALS. ` CHJNAPf;E[GV/�L�W�EI T LOR L A , 111ELL GODWI�V >� 4 BEACH,FREDERICK BRANDON ''�. - r 1� ' S POINT MITCHELL MARY t BROUGHTON,MARION BAXTER �� " ` ROBER YCE LEY,J ELMO JR ETALS \ ` \ OFFS/TFGBgckF A ` ' CONSTRUCTION SEQUENCE LILLEY,WILLIAM CLIFTON FRgTFp�I'/ty \ JOHNSC�N,D UGLAS C .- LILLEY,STEPHEN C JR l / SOUNOjSTogq FN yT/tijq A I ALL SOILS, MINERALS, ROCK, GRAVEL, AND WASTE OR OTHER MATERIAL BROUGHT" ONTO OR REMOVED FROM THIS SITE MUST BE HAULED TO OR BROWN,/DAVID MICHAEL - � .' a FROM AN APPROVED PERMITTED FACILITY. HILLING,DANIEL-K 4 1 I 1. CONTRACTOR SHALL CONTACT 811 ONE CALL CENTER FOR L LOCATIONS OF EXISTING UTILITIES 72 HOURS PRIOR TO BEGINNING �-- CONSTRUCTION (1-800-632-4949). 2. INSTALL SILT FENCE AND SILT FENCE RELIEF POINTS AS SHOWN -, ZEMORE,AAF'ON JR LL wl A IFTON / I AROUND THE PERIMETER OF THE AREA DESIGNATED FOR WkLKINSO ,SYLVIA B STOCKPILE/BERM. 3. PERMANENTLY SEED AREAS THAT WILL NOT BE RE-DISTURBED. DO - I NOT ALLOW ANY DISTURBED AREAS TO REMAIN DISTURBED ANY LONGER INSON,SYL/B > .1 THAN WHAT IS NECESSARY (SEE TABLE BELOW FOR TIMEFRAME 7„� _ O I REQUIREMENTS). BEFORE STRIPPING OR ANY OTHER LAND DISTURBING ACTING INSIDE THE EXCAVATION AREA, CONSTRUCT TEMPORARY `f DIVERSION DITCHES (IF NECESSARY)TO DIRECT SEDIMENT-LADEN RUNOFF DOMECQ,B RLALLEN l a TO BASIN. 4. ONCE ALL EROSION CONTROL ITEMS HAVE BEEN INSTALLED, PL-PL-PL ildL�PLC PL� �PL� d P EXCAVATION SHOULD BEGIN WITH THE REMOVAL OF ALL TOPSOIL AND THE CATEGORY AFFECTED ACREAGE TOPSOIL USED TO BUILD THE TEMPORARY STOCKPILE/BERM. 4 `c., � •fs 5. AS THE EXCAVATION PROGRESSES, GRADE THE SLOPES AT A 3.1 MINING AREA 12.33 ACRES LILLEY,J ELMO JR ,, * u , ABOVE THE WATER LEVEL AND AT A 2.1, OR NATURAL ANGLE OF REPOSE, 4 Y ' T / •"_�Y` BELOW THE WATER LEVEL. HAUL ROADS 0 ACRES / 6. SEED AND STABILIZE SLOPES AND DISTURBED AREAS ONCE THEY ARE TEMPORARY STOCKPILE AREA LILLEY,MARY P _ _ COMPLETED. (TOPSOIL & WASTE MATERIAL) 0.27 ACRES /s� 7. AFTER THE MINING IS COMPLETE AND ALL DISTURBED AREAS ARE PERRY,SIMON Alll STABILIZED, REMOVE ALL TEMPORARY SEDIMENT AND EROSION CONTROL UNEXCAVATED BUFFER/BERM 5.32 ACRES DEVICES. TOTAL ACREAGE AFFECTED 17.92 ACRES BARNHILL TOTAL ACREAGE PERMITTED 17.92 ACRES / � �;� CONTRACTING LEGEND � �� y COMPANY PROPERTY LINE —PL—PL—PL_ x�� 800 Tiffany Blvd. Suit 200, P.O. BOX 7948 ROCKY MOUNT, NORTH CAROLINA 27804 TREE LINE PERMIT BOUNDARY —LOo—LOo OWNER: MARY MITCHELL —II—II— I— I_ UNEXCAVATED SILT FENCE BUFFER WITH BERM d\ DRAWN BY: Dustin Faulkner WETLAND BOUNDARY TEMP. SILT FENCE OUTLET CERTIFICATION NO.: 4119 UNDISTURBED PROPOSED ,d� �a SCALE: 1 = 200 50'UNDISTURBED BUFFER BUFFER MINING AREA 3— 'd�,d TEMP. STOCKPILE EXISTING DATE: ORIGINAL 5/31 /2023 AREA �__�����—�OCeY11� STRUCTURES SHEET: 1 of 2