Summary of Comments on P:\2018 Jobs\18064.1 - Primm
Sunset Road CDs\CAD\18064.1 - 401_404 WL-5 (1)
Page: 1
Number: 1 Author: splocklear1 Date: 7/19/2023 10:29:29 AM
Has the City of Charlotte approved the Stormwater Management Plan for this project?
Author: Long.Quach Date: 7/20/2023 1:18:04 PM
Yes, City of Charlotte approved the Stormwater Management plan for this project.
Number: 2 Author: splocklear1 Date: 7/19/2023 10:29:29 AM
Is there adequate room to construct these retaining wall without disturbing the buffer?
Author: Long.Quach Date: 7/20/2023 1:08:25 PM
Yes, the retaining walls will be constructed on the high side of the buffer.
Number: 3 Author: splocklear1 Date: 7/19/2023 10:29:29 AM
What treatment in being provided for this stormwater runoff prior to discharging into buffer/creek?
Author: Long.Quach Date: 7/20/2023 1:09:43 PM
This is the bypass storm drain system that will carry the offsite runoff therefore no treatment is required for this runoff .
Number: 4 Author: splocklear1 Date: 7/19/2023 10:29:29 AM
The discharge structure for BMP #1 must be relocated. As shown, it appears to be located in the forebay of the BMP which allows the system to
"short circuit" and does not allow for treatment of the stormwater runoff.
Author: Long.Quach Date: 7/20/2023 1:12:33 PM
The exhibit is expanded to shown more the detail of BMP #1. The forebay of the BMP is revised to avoid "short circuit".
Number: 5 Author: splocklear1 Date: 7/19/2023 10:29:29 AM
With the flow being split at the outlet into the BMP, please provide plans that show the BMP in its entirety. How is right (east) side of BMP being
discharged?
Author: Long.Quach Date: 7/20/2023 1:11:16 PM
The exhibit is expanded to show the east side of the BMP.
Number: 6 Author: rconchilla Date: 7/19/2023 10:29:29 AM
Depict Gutter Branch south of the BMP discharge
Author: Long.Quach Date: 7/20/2023 1:11:34 PM
Gutter Branch south of the BMP area added .