HomeMy WebLinkAboutEast Mingo Mitigation Plan-monitoring updates      FINAL MITIGATION PLAN  Submitted to IRT    June 12, 2023    WILDLANDS CAPE FEAR 06 UMBRELLA  MITIGATION BANK  Site Name: East Mingo Creek Mitigation Site  Johnston County, NC  Cape Fear River Basin  HUC 03030006  USACE Action ID No. SAW‐2020‐02093  NCDWR # 20201989       PREPARED BY:    Wildlands Engineering, Inc.  312 W Millbrook Road, Suite 225  Raleigh, NC 27609  Phone: (919) 851‐9986              Final Mitigation Plan  Wildlands Cape Fear 06 Umbrella Mitigation Bank  East Mingo Creek Mitigation Site    Johnston County, NC  Cape Fear River Basin  HUC 03030006  USACE Action ID No. SAW‐2020‐02093  NCDWR # 20201989        PREPARED BY:    Wildlands Engineering, Inc.  312 W Millbrook Road, Suite 225  Raleigh, NC 27609  Phone: (919) 851‐9986    Contributing Staff:  Angela Allen, PE, Project Manager   John Hutton, Principal in Charge  Charlie Neaves, Lead Scientist, Wetland Delineation  Greg Turner, PE, Project Engineer  Noyes Harrigan, EI, Designer  Catherine Warner, Plan Production  Andrea Thompson, Lead Steward  Jeff Keaton, PE, Lead Quality Assurance  Nicole Macaluso Millns, PE, CFM, Quality Assurance East Mingo Creek Mitigation Site  Final Mitigation Plan   Page i June 2023  TABLE OF CONTENTS  1.0 Introduction .............................................................................................................................. 1  2.0 Basin Characterization and Site Selection .................................................................................. 1  3.0 Baseline and Existing Conditions ............................................................................................... 2  3.1 Watershed Conditions .................................................................................................................. 2  3.2 Landscape Characteristics ............................................................................................................ 2  3.3 Project Resources ......................................................................................................................... 3  3.4 Overall Functional Uplift Potential ............................................................................................. 12  3.5 Site Constraints to Functional Uplift ........................................................................................... 13  4.0 Regulatory Considerations ...................................................................................................... 13  4.1 401/404 ...................................................................................................................................... 14  4.2 Threatened and Endangered Species ......................................................................................... 15  4.3 Cultural Resources / Conservation Lands / Natural Heritage Areas ........................................... 15  4.4 FEMA Floodplain Compliance and Hydrologic Trespass ............................................................. 16  5.0 Mitigation Site Goals and Objectives ....................................................................................... 16  6.0 Design Approach and Mitigation Work Plan ............................................................................ 17  6.1 Design Approach Overview ........................................................................................................ 17  6.2 Reference Streams ...................................................................................................................... 18  6.3 Reference Wetland and Vegetation ........................................................................................... 19  6.4 Design Channel Morphological Parameters ............................................................................... 20  6.5 Design Bankfull Discharge Analysis ............................................................................................ 24  6.6 Sediment Transport Analysis ...................................................................................................... 25  6.7 Project Implementation .............................................................................................................. 26  6.8 Vegetation, Planting Plan, and Land Management .................................................................... 28  6.9 Project Risk and Uncertainties .................................................................................................... 31  7.0 Determination of Credits ......................................................................................................... 31  8.0 Performance Standards ........................................................................................................... 34  9.0 Monitoring Plan ...................................................................................................................... 36  10.0 Long‐Term Management Plan ................................................................................................. 37   Ownership and Long‐Term Manager .......................................................................................... 37   Long‐Term Management Activities ............................................................................................ 37   Funding Mechanism ................................................................................................................... 38   Contingency Plan ........................................................................................................................ 39  11.0 Adaptive Management Plan .................................................................................................... 39  12.0 Financial Assurances ............................................................................................................... 40  13.0 References .............................................................................................................................. 42    TABLES  Table 1: Project Attribute Table Part 1 ................................................................................................. 1  Table 2: Project Attribute Table Part 2 ................................................................................................. 2  Table 3: Summary of Stream Resources ............................................................................................... 7  Table 4: Existing Wetlands Summary .................................................................................................... 8  Table 5: 2022 Groundwater Gauge Summary ..................................................................................... 12  Table 6: Project Attribute Table Part 3 ............................................................................................... 13  Table 7: Estimated Impacts to Project Wetlands ................................................................................ 14  Table 8: Mitigation Goals and Objectives ........................................................................................... 17  Table 9: Functional Impairments and Restoration Approach .............................................................. 18  Table 10: Stream Reference Data Used in Development of Design Parameters ................................... 19  East Mingo Creek Mitigation Site  Final Mitigation Plan   Page ii June 2023  Table 11: Reference Wetland Hydrology Results 2006‐2010 ............................................................... 20  Table 12: Summary of Morphological Parameters for East Mingo Creek ............................................. 21  Table 13: Summary of Morphological Parameters for Beaver Creek, Cricket Creek, and Deer Creek ... 22  Table 14: Summary of Morphological Parameters for Lamb Creek, Lizard Creek, and Mouse Creek .... 23  Table 15: Summary of Morphological Parameters for Rabbit Creek, Snake Creek, and UT to Beaver  Creek 24  Table 16: Summary of Design Discharge Analysis ............................................................................... 25  Table 17: Results of Competence Analysis .......................................................................................... 26  Table 18: Project Assets and Credits ................................................................................................... 32  Table 19: Summary of Performance Standards ................................................................................... 35  Table 20: Monitoring Components ..................................................................................................... 36  Table 21: Long‐Term Management ..................................................................................................... 38  Table 22: Management Funding ......................................................................................................... 39  Table 23: Financial Assurances Table .................................................................................................. 41    FIGURES  Figure 1 Vicinity Map  Figure 2 Service Area Map  Figure 3 Existing Conditions Map  Figure 4 NCDOT Draft STIP FY 2020‐2029  Figure 5 Watershed Map  Figure 6 USGS Topographic Map   Figure 7 Soils Map  Figure 8 Concept Design Map  Figure 9 Reference Reach Map  Figure 10 Design Discharge Analysis  Figure 11 Monitoring Components Map    APPENDICES  Appendix 1 Maps, Data, and Analysis  Appendix 2 JD Concurrence  Appendix 3 DWR Stream ID, NCSAM, and NCWAM Forms  Appendix 4 Regulatory Correspondence  Appendix 5 Maintenance Plan   Appendix 6 Credit Release Schedule  Appendix 7 Site Protection Instrument  Appendix 8 Financial Assurance  Appendix 9 Draft Plan Sheets    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 1 June 2023  1.0 Introduction  Wildlands Holdings VI, LLC (“Sponsor”) proposes to develop the East Mingo Mitigation Site (Site) as the  first project under the Wildlands Cape Fear 06 Umbrella Mitigation Bank (“Bank”). Wildlands Holdings  VI, LLC is wholly owned by Wildlands Engineering, Inc.   The Site is in southwest Johnston County, NC approximately two miles northwest of Benson (Figure 1).  The project is the 14‐digit Hydrologic Unit Code (HUC) 03030006020010 and the NC Department of  Environmental Quality Division of Water Resources (NCDEQ DWR) Subbasin 03‐06‐18. The Site will  provide stream and wetland mitigation credits in the Cape Fear Hydrologic Unit 03030006 (Cape Fear  06) (Figure 2). The project involves the restoration and enhancement of East Mingo Creek and its  tributaries to provide 7066.076 stream credits. It also involves the reestablishment, rehabilitation, and  enhancement of wetlands to provide 22.537 riparian wetland credits. The Site will be protected by a  45.89‐acre conservation easement.  Table 1: Project Attribute Table Part 1  Project Information  Project Name  East Mingo Mitigation Site  County Johnston  Project Area (acres) 45.89  Project Coordinates (latitude and longitude) 35.398681 N, 78.574376 W  Planted Acreage (acres of woody stems planted) 31.52  2.0 Basin Characterization and Site Selection  The Site is located in the Cape Fear 06 basin. The Cape Fear 06 basin, as described in the DWR 2005  Cape Fear River Basin Water Quality Plan (WQP), includes the municipalities of Clinton, Benson, Coats,  Dunn, Angier, Autryville, Garland, Falcon, Roseboro, and Stedman but is largely forested or in  agricultural use. Several highways bisect the basin including US‐701, NC‐24, NC‐242, US‐13, US‐421, NC‐ 27 and I‐95. State highway NC‐210 runs most of the length of the subbasin along the South River.  Developing a mitigation bank will allow unavoidable impacts to Waters of the United States within the  service area (Figure 4) to be mitigated appropriately and provide a means for the economic growth of  this region to continue while ensuring aquatic resources and water quality are maintained. This includes  the potential widening for the aforementioned roads within the watershed.  The proposed Bank is located in DWR subbasin 03‐06‐18 and HUC 03030006020010. There are no  current local or state watershed plans associated specifically with this subbasin. The watershed is  dominated by forest (56%) and agriculture (41%) with urban areas making up less than 2%. There are  over 100 registered swine operations in this subbasin. This subbasin is not included in North Carolina  Division of Mitigation Services’ (DMS) River Basin Restoration Priorities plan for the Cape Fear 06, which  concentrates on the South River and Great Coharie Creek. While DWR devotes a chapter in the Cape  Fear River Basin Plan to the 03‐06‐18, the chapter is focused on the Black River and South River. Visual  inspections indicate the primary stressors in the East Mingo Creek watershed are animal operations,  primarily cattle. The Site addresses degradation due to animal operations by removing livestock from  the Site streams and wetlands, converting agricultural land to forest, and protecting the site from  developmental pressures through the establishment of a conservation easement.       East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 2 June 2023  3.0 Baseline and Existing Conditions  3.1 Watershed Conditions  The Site watershed (Table 2 and Figure 5) is situated in rural Johnston County near Benson, NC. The Site  topography, as indicated on the Benson, NC USGS 7.5‐minute topographic quadrangle, shows a wide,  flat valley bottom spanning most of the Site (Figure 6). Drainage areas for the project reaches were  delineated using 2‐foot contour intervals derived from the North Carolina Floodplain Mapping  Program’s 2007 Light Detection and Ranging (LiDAR) data. Land uses draining to the project reaches are  a mix of forested and agricultural/pasture/hay fields with some residential development and open  water. The land use was calculated using the National Land Cover Database (NLCD) for 2011. The  impervious area within the project catchment at the downstream end was calculated to be less than one  percent of the project catchment using USGS North Carolina StreamStats Version 4.  A review of historic aerials (Appendix 1) from 1950 to 2016 shows the southern half of the site was  cleared between 1964 and 1972 This involved draining an old mill pond and ditching and straightening  East Mingo Creek and several of its tributaries (according to landowner recollection). During this time a  Confined Animal Feeding Operation (CAFO) was installed in the Snake Creek watershed west of the  project site. Between 1974 and 1983 agricultural ponds were added to the headwaters of Cow Creek  and Mouse Creek upstream of the project areas. A pond was added adjacent to Snake Creek upstream  of the project area between 1983 and 1993. Little change was noted in land use or riparian buffer  extents in the watershed since 1993 and riparian buffers within the site have remained consistent since  1972.  The project parcels, and several surrounding parcels are located in a Voluntary Agricultural District  according to Johnston County zoning maps. There are currently no developmental pressures to suggest  future changes in land use that might alter the watershed and/or add stressors throughout the  implementation, monitoring, and closeout of the project.  Table 2: Project Attribute Table Part 2  Project Watershed Summary Information  Physiographic Province Coastal Plain  Ecoregion Rolling Coastal Plain  River Basin Cape Fear 06  USGS HUC (8‐digit, 14 digit) 03030006, 03030006020010  NCDWR Sub‐basin 03‐06‐18  Project Drainage Area (acres) 2,112  Project Drainage Area Percentage of Impervious Area <1%  CGIA Land Use Classification  63% agriculture, 9% forest, 5% urban, 2%  grassland/herbaceous, 11% shrubland, 9% wetland,  1% open water  3.2 Geology and Soils  According to the NC Geologic Survey, the Site is in the Middendorf formation of the Coastal Plain  physiographic province. The Coastal Plain is characterized by relatively flat terraces of primarily  unconsolidated sediments and carbonate rocks ranging in age from Cretaceous to Quaternary. These  layered materials accumulated as sediments deposited in what was once a shallow ocean or shelf  interface along a shallow ocean. The deposits form roughly parallel belts that trend southwest to  northeast. The site is in the belt called the Middendorf Formation (km), which formed during the  Cretaceous period. Sohl and Owens (1991) describe the Middendorf formation as deeply weathered and    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 3 June 2023  consisting mainly of layered delta plain to fluvial deposits. Sediments are layered in thick black clay and  light‐colored sand layers consisting of sand, sandstone, and mudstone. Sands are primarily quartz;  however, outcrops of feldspar may be up to 15 percent. The majority of the site consists of Bibb sandy  loam soils (Figure 7), which are deep and poorly drained. Grantham silt loams, which are also deep and  poorly drained, are found at the upstream ends of Deer Creek and Lamb Creek. Gilead sandy loam, a  deep and moderately well drained soil, is found at the upstream ends of Wolf Creek, Beaver Creek, and  Lamb Creek. A small area of Uchee loamy coarse sand, a deep well drained soil, is found at the valley  edge on the upstream end of Cow Creek. No exposed bedrock is located on site and there is no geologic  grade control. Grade control features will need to be designed with logs and woody debris to mimic  what would be found in reference streams in similar geologic conditions.  3.3 Project Resources  The southern half of the site is currently maintained for livestock pasture. A forest dominated by  Chinese privet (Ligustrum sinense) is present on the northern half of the site. On March 16, 2020, all Site  streams were evaluated and scored. Stream forms are included in the appendix and further descriptions  of each stream are in Table 3 and Section 3.3.1 below.   3.3.1 Existing Streams  East Mingo Creek and W. Fork East Mingo Creek  East Mingo Creek (DA 2,154 acres)is a perennial sandbed  system that flows south from where the stream enters the site  under Banner Elk Road. At the usptream property boundary,  East Mingo flows through forest and is moderately incised with  a bank height ratio (BHR) of 1.4 (XS1). East Mingo drops over a  headcut near its confluence with Deer Creek and the BHR  increases to 2.1 (XS2). As the stream enters the pasture, the  BHR lowers to a 1.9 (XS3) and then eventually a 1.0 (XS4) at the  downstream end of the project. The upstream wooded reach  appears historically straightened in some areas and has  developed an unstable meander pattern in others, as  evidenced by streambank scour.   An old ditch branches off of East Mingo Creek at the top of the project and parallels the channel on the  right floodplain within the woods. The right floodplain channel appears to have been excavated as a  ditch between 1964 and 1972. The ditch breaks up and re‐forms at a headcut and becomes a  jurisdictional channel paralelling East Mingo Creek in the same valley. This has been named W. Fork East  Mingo Creek.  Bedform diversity and large woody debris are present in the upstream wooded reach, however as East  Mingo enters the pasture, bedform diversity decreases. Within the pasture, channel substrate is  dominated by fines from livestock trampling of the streambed and banks. Historic channel incision is  masked at the downstream portion of East Mingo Creek (below Wolf Creek) because of the influence of  beaver dams downstream of the property holding a higher water elevation within the channel.          East Mingo Creek    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 4 June 2023  Lizard Creek   Lizard Creek (DA 32 acres) is an intermittent sandbed stream with  low width to depth ratio, flowing through an unconfined, forested  floodplain dominated by Chinese privet. The channel bedform is  highly influenced by root systems of trees and Chinese privet on  the banks, forming instream drop structures and scour pools.  Large woody debris and leaf packs are present. At the  downstream end, Lizard Creek incises to meet the invert elevation  of East Mingo Creek. Bedform is diminished or absent entirely  within the incised area.   Cricket Creek  Cricket Creek (DA 1.7 acres) is a short, intermittent stream that  begins at a headwater wetland and flows west northwesterly into  East Mingo Creek. The channel becomes deeply incised as it  approaches East Mingo Creek. The bedform of Cricket Creek is  largely defined by roots of trees from the forested floodplain.  Snake Creek and Snake Creek Anabranch  Snake Creek (DA 185 acres) is a perennial stream. Upstream of the  site, Snake Creek follows along the western edge of an existing  pond. While the stream is incised, it is not currently threatening  the stability of the pond. Snake Creek enters the site as a single  thread channel. The channel meanders through the wide alluvial  floodplain of East Mingo Creek and splits into Snake Creek and  Snake Creek Anabranch (intermittent). The stream banks and bed  have been severely trampled by livestock. This has caused a fining  of bed material along with lack of bedform. There is an ephemeral  channel that joins Snake Creek coming from the outlet of the  offsite pond. There is no understory in this portion of the woods  due to livestock grazing. Snake Creek and Snake Creek Anabranch  incise in order to meet the elevation of East Mingo Creek.        Snake Creek  Snake Creek Anabranch  Cricket Creek  Lizard Creek    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 5 June 2023  Deer Creek  Deer Creek (DA 20 acres) is an intermittent stream similar in  function and livestock impact to Snake Creek. There is stable  pattern, and the stream is connected to the floodplain; however,  the banks and bed suffer from extensive livestock trampling. The  upstream end is less trampled due to a dense colony of Chinese  privet on the stream banks and floodplain. Deer Creek incises to  join East Mingo Creek downstream, losing bedform diversity and  floodplain connection in Reach 2.  Mouse Creek   Mouse Creek (DA 9.4  acres) is an intermittent stream that flows through a heavily  grazed wooded pasture. Though incised, it appears vertically  and laterally stable until the confluence of East Mingo Creek  where it incises further. Livestock trampling is evident within  Mouse Creek resulting in a fining of bed material and a lack of  bedform diversity. There is also little to no large woody debris  (LWD) present.    Rabbit Creek and UT to Rabbit Creek  Rabbit Creek (DA 34 acres) is an intermittent stream that flows  through a wooded pasture similar to Mouse Creek. The stream  is stable with good bedform diversity and floodplain access.  Downstream of the wooded buffer, Rabbit Creek appears to  have been historically ditched to drain straight out to East  Mingo Creek. Rabbit Creek’s width to depth ratio increases and  the channel incises, separating it from the floodplain. The  stream bedform and streambanks are extensively impacted by  livestock trampling in this ditched section.   UT to Rabbit Creek (DA 1.3 acres) is short intermittent stream that connects to Rabbit Creek.   Wolf Creek  Wolf Creek (DA 14 acres) is an intermittent stream that lacks a  wooded riparian buffer and is dominated by common rush (Juncus  effuses) and pasture grasses. The channel is overly wide due to  livestock trampling; however, a smaller, nested channel has begun  to form within the larger channel. Wolf Creek has poor bedform  diversity and few instances of LWD.   Mouse Creek  Wolf Creek  Rabbit Creek  Deer Creek    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 6 June 2023  Lamb Creek  Lamb Creek (DA 14 acres) is a perennial stream that begins at a  headwater wetland seep in a wooded pasture. The channel  transitions between a single thread and multi‐thread channel  influenced by slope changes within the valley. The stream  dimension and pattern appear stable, and stream bedform is  shaped by woody debris and tree roots. As Lamb Creeks enters the  open pasture, the channel becomes single‐thread and the stream  appears to have been historically ditched straight out to East  Mingo Creek. It flows through the riparian wetlands of East Mingo Creek and common rush dominates  the streambanks. Stream bed and banks are so extensively trampled by livestock in the pasture that  they are indiscernible in some areas.  Cow Creek  Cow Creek (DA 16 acres) is an intermittent stream that is impounded by a series of inline farm ponds  upstream of the Bank. Cow Creek enters the Site immediately downstream of a pond outlet and flows  through loblolly pines (Pinus taeda). The stream has good bedform diversity in the pines and limited  LWD. As Cow Creek enters the floodplain of East Mingo Creek the channel flattens, is lined with  common rush, and is trampled by livestock.     Beaver Creek and UT to Beaver Creek  Beaver Creek (DA 12 acres) is an intermittent stream that is impounded by a farm pond at the upstream  extent. The dam has failed, and Beaver Creek is incised through the dam. Beaver Creek remains incised  until it reaches the floodplain wetlands of East Mingo Creek. Beaver Creek consistently lacks bedform  diversity, LWD, and has poor hydrologic connection to the floodplain.  UT to Beaver Creek (DA 0.5 acres) is a small, steep intermittent stream that drains an old sediment pond  (now a wetland) near Benson‐Hardee Road.          Beaver Creek UT to Beaver Creek Cow Creek  Lamb Creek    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 7 June 2023  Table 3: Summary of Stream Resources  Reach Summary Information  Parameter East Mingo  Creek Beaver Creek Cricket Creek Cow Creek Deer Creek  Length of Reach (lf) 4927 347 77 306 442  Valley Confinement (confined,  moderately confined,  unconfined)  Unconfined Moderately  confined Unconfined Unconfined Unconfined  Drainage Area (acres) 2,154 12 1.7 16 20  Perennial, Intermittent,  Ephemeral Perennial Intermittent Intermittent Intermittent Intermittent  NCDWR Water Quality  Classification C; SW N/A N/A N/A N/A  Stream Classification (Existing  and Proposed) F5, C5 E5b, C5 E5b, C5 E5, N/A C5b, C5  FEMA Classification Zone AE Zone AE  (fringe)  Zone AE  (fringe)  Zone AE  (fringe)  Zone AE  (fringe)  NCSAM Overall Score Low Low Low Low Low    Parameter Lamb Creek Lizard Creek Mouse  Creek Rabbit Creek Snake Creek  Length of Reach (lf) 703 170 421 446 400  Valley Confinement (confined,  moderately confined,  unconfined)  Unconfined Unconfined Unconfined Unconfined Unconfined  Drainage Area (acres) 14 32 9.4 34 185  Perennial, Intermittent,  Ephemeral Perennial Intermittent Intermittent Intermittent Perennial  NCDWR Water Quality  Classification N/A N/A N/A N/A N/A  Stream Classification (Existing  and Proposed) E5, C5 E5b, C5 E5, C5 C5, C5 E5, C5  FEMA Classification Zone AE  (fringe)  Zone AE  (fringe)  Zone AE  (fringe)  Zone AE  (fringe)  Zone AE  (fringe)  NCSAM Overall Score Low Low Low Low Low         East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 8 June 2023  Parameter Snake Creek  Anabranch  UT to Beaver  Creek  UT to Rabbit  Creek Wolf Creek  Length of Reach (lf) 467 94 28 418  Valley Confinement (confined,  moderately confined,  unconfined)  Unconfined Moderately  confined Unconfined Unconfined  Drainage Area (acres) ‐ 0.5 1.3 14  Perennial, Intermittent,  Ephemeral Intermittent Intermittent Intermittent Intermittent  NCDWR Water Quality  Classification N/A N/A N/A N/A  Stream Classification (Existing  and Proposed) C5b C5b, B5 N/A C5, N/A  FEMA Classification Zone AE (fringe) Zone X Zone AE (fringe) Zone AE (fringe)  NCSAM Overall Score ‐  ‐  ‐ Low  3.3.2 Existing Wetlands  Wildlands investigated the extent of Waters of the United States within the project area during the fall  of 2021 and spring of 2022. All jurisdictional resources were located by sub‐meter GPS or conventional  survey. USACE staff provided email concurrence with jurisdictional resource mapping on July 11, 2022.  Existing wetland summary information is presented in Table 4.  Table 4: Existing Wetlands Summary   Wetland Summary Information  Parameter Wetland A Wetland B Wetland C Wetland D  Size of Wetland (acres) 1.380 0.156 1.248 0.041  Wetland Type (NCWAM  Class)  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest  Overall NCWAM Rating Medium Medium Low Medium  Mapped Soil Series Bibb Bibb Bibb Bibb  Drainage Class PD PD PD PD  Soil Hydric Status Yes Yes Yes Yes  Source of Hydrology Groundwater Groundwater Groundwater Groundwater  Restoration or  enhancement method  (hydrologic, vegetative,  etc.)  Hydrologic,  Vegetative  Hydrologic,  Vegetative  Hydrologic,  Vegetative  Hydrologic,  Vegetative         East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 9 June 2023  Wetland Summary Information  Parameter Wetland E Wetland F Wetland G Wetland H  Size of Wetland (acres) 0.033 0.679 1.391 0.497  Wetland Type (NCWAM  Class)  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest  Overall NCWAM Rating Low Low Medium Low  Mapped Soil Series Bibb Bibb Gilead/Grantham Grantham  Drainage Class PD PD MWD/PD PD  Soil Hydric Status Yes Yes No/Yes Yes  Source of Hydrology Groundwater Groundwater Groundwater Groundwater  Restoration or  enhancement method  (hydrologic, vegetative,  etc.)  Hydrologic,  Vegetative  Hydrologic,  Vegetative  Hydrologic,  Vegetative  Hydrologic,  Vegetative    Wetland Summary Information  Parameter Wetland I Wetland J Wetland K Wetland L  Size of Wetland (acres) 0.382 0.011 0.726 0.524  Wetland Type (NCWAM  Class)  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest  Overall NCWAM Rating Low Low Low Low  Mapped Soil Series Bibb Bibb Bibb Bibb  Drainage Class PD PD PD PD  Soil Hydric Status Yes Yes Yes Yes  Source of Hydrology Groundwater Groundwater Groundwater Groundwater  Restoration or  enhancement method  (hydrologic, vegetative,  etc.)  Hydrologic,  Vegetative  Hydrologic,  Vegetative  Hydrologic,  Vegetative  Hydrologic,  Vegetative    Wetland Summary Information  Parameter Wetland M Wetland N Wetland O Wetland P  Size of Wetland (acres) 1.287 0.165 0.109 0.456  Wetland Type (NCWAM  Class)  Headwater  Forest Headwater Forest Bottomland  Hardwood Forest Headwater Forest  Overall NCWAM Rating Low Low Low Medium  Mapped Soil Series Bibb/Gilead Bibb/Uchee Bibb Bibb  Drainage Class PD/MWD PD/WD PD PD  Soil Hydric Status Yes/No Yes/No Yes Yes  Source of Hydrology Groundwater Groundwater Groundwater Groundwater  Restoration or  enhancement method  (hydrologic, vegetative,  etc.)  Vegetative Vegetative Hydrologic,  Vegetative Vegetative    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 10 June 2023  Wetland Summary Information  Parameter Wetland Q Wetland R Wetland S Wetland T  Size of Wetland (acres) 0.008 0.025 0.022 0.020  Wetland Type (NCWAM  Class)  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest  Overall NCWAM Rating Low Low Low Low  Mapped Soil Series Bibb Bibb Bibb Bibb  Drainage Class PD PD PD PD  Soil Hydric Status Yes Yes Yes Yes  Source of Hydrology Groundwater Groundwater Groundwater Groundwater  Restoration or  enhancement method  (hydrologic, vegetative,  etc.)  Hydrologic,  Vegetative  Hydrologic,  Vegetative  Hydrologic,  Vegetative  Hydrologic,  Vegetative    Wetland Summary Information    Parameter Wetland U Wetland V Wetland W  Size of Wetland (acres) 4.879 4.372 0.655  Wetland Type (NCWAM  Class)  Bottomland  Hardwood Forest  Bottomland  Hardwood Forest Headwater Forest  Overall NCWAM Rating Low Low Low  Mapped Soil Series Bibb Bibb Gilead  Drainage Class PD PD MWD  Soil Hydric Status Yes Yes No  Source of Hydrology Groundwater Groundwater Groundwater  Restoration or  enhancement method  (hydrologic, vegetative,  etc.)  Vegetative Vegetative Hydrologic,  Vegetative    Wetlands were classified and evaluated using the North Carolina Wetland Assessment Method  (NCWAM). Wetlands within the conservation easement were classified as Bottomland Hardwood  Forests or Headwater Forests; the distinguishing factor between these two wetland types is order of the  most closely associated stream channel. Wetland impairments throughout the site are due to  manipulation of the vegetation community, presence of livestock, ditching, and altered hydrology from  stream incision.   The approximate northern third of the project area where Wetland A – Wetland E is located is forested  but contains dense Chinese privet in the understory which is outcompeting native lower strata  vegetation. Livestock does not access this area. East Mingo Creek is incised and generally straight  through this area and presumably drains historic wetlands and partially drains current, existing  wetlands. Based on the 1972 and 1983 historical aerial photos (Appendix 1) and the presence of spoil  piles, it appears a man‐made shallow ditch was constructed along the right toe of slope through part of  this area to divert groundwater discharge down valley instead of across the floodplain. This feature  generally follows the western edge of Wetland C (Figure 3). Although it has been unmaintained for  decades, it still functions to intercept groundwater discharge and partially dry out the right floodplain of    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 11 June 2023  East Mingo Creek in the vicinity of Wetland C. Moving north to south, the defined flow path of this ditch  terminates. During the wet season or flood events, water splays out overland for a short distance  through Wetland C before entering a network of erosional channels. Given the pattern of these  channels, it is unlikely they were directly manmade, but likely formed as a result of increased  headcutting and erosion rates due to some type of disturbance. These channels were determined to be  non‐jurisdictional features but function to lower in water table in their vicinity.   The middle third of the project area containing Wetland F – Wetland K is accessed by cattle and has a  forested canopy with desirable species composition but has minimal lower strata vegetation present  due to livestock impacts. East Mingo Creek and the West Fork of East Mingo Creek are incised and have  a partial drainage effect on wetlands within the floodplain. Parts of Wetland F, Wetland G, and Wetland  H have developed erosional features that directly drain groundwater discharge to East Mingo Creek.  The Southern third of the project area is maintained as pasture and regularly grazed by livestock. All  wetlands within this area (Wetland N – Wetland W) provide poor habitat quality and minimal water  quality improvements. Hydrologic regime of wetlands in this area varies with differences in persistence  of groundwater discharge and proximity to an incised stream channel. Wetland L, Wetland O, Wetland  Q, Wetland S, and Wetland T are partially drained by the incised East Mingo Creek channel. Wetland N,  Wetland P, the pasture portion of Wetland M, Wetland U, and Wetland V, do not appear affected by any  major drainage conduit. Wetland P, Wetland U, and Wetland V each contain portions that appear to be  ponded or saturated at the soil surface for six to ten months out of the year. Wetland W contains three  distinct functional units, two of which are heavily manipulated. Part of Wetland W is formed from a  failed farm pond. The dam is breached but still retains ponded water with emergent vegetation. The  southeastern “lobe” of Wetland W is a manmade basin which functions similarly to a shallow retention  basin (Figure 3). Although clearly manmade, these features were more appropriately classified as  wetland than open water in their current condition. A Headwater Forest type wetland would have  naturally occurred in this location. The pond and basin provide poor quality habitat, water quality, and  hydrology functions. The third unit of Wetland W has generally unaltered topography but vegetation has  been manipulated.  3.3.3 Relic Hydric Soils  A licensed soil scientist (LSS) evaluated the site on March 11, 2020 to assess the extent of hydric soils on  site. The preliminary investigation determined that the entire East Mingo Creek valley contains hydric  soils. Since the hydric soil area covers the whole valley bottom and extends slightly upslope in hollows  and areas of groundwater discharge, a detailed investigation to field‐delineate the hydric soil boundary  was not necessary. Instead, a relief and elevation‐based approach to mapping hydric soil areas were  used. The LSS determined that soils within the East Mingo Creek valley are most like the Bibb series  (Coarse‐loamy, siliceous, active, acid, thermic, Typic Fluvaquents). The LSS report is included in Appendix  1. Additional soil observations by Wildlands during wetland delineation and general existing conditions  assessment further supported the presence of hydric soils within the entire valley.  3.3.4 Existing Hydrology  Seven groundwater gauges (GW) were installed on site in July 2021 and recorded data until early  February 2023 (Figure 3, Appendix 1). Growing season dates proposed for this Site are March 1 through  November 16 (260 days) and the hydroperiod criterion is proposed as 12%. A full discussion of growing  season date and hydroperiod selection follows in Section 8.0 Performance Standards. The water table at  GWs 1‐6 generally remained at soil depths significantly below 12 inches with only brief rises above a 12‐ inch depth. The water table receded rapidly after each rise. At GW 7, the water table generally remained  between soils depths of 12 to 22 inches during the early part of the 2022 growing season. GW 7 occurs  within Wetland C and wetland hydrology indicators were observed in this vicinity despite gauge data    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 12 June 2023  indicating that the water table was not within 12 inches of the soil surface for a period of 14 days or  longer. It seems possible that this area does undergo saturation within 12 inches of the soil surface for  greater than 14 days during some years. GW 7 is representative of the hydrological impairment to  existing wetlands imposed by the incised stream channels and the toe of slope ditch along the western  edge of Wetland C. Summary data from the 2022 growing season is presented in Table 5.  Table 5: 2022 Groundwater Gauge Summary  Gauge   Consecutive Days in Growing  Season with Groundwater Table  Above 12 in. Depth  Consecutive Percent of Growing  Season with Groundwater Table  Above 12 in. Depth  Proposed Wetland  Approach  1 2 0.8 Re‐establishment  2 0 0 N/A1  3 0 0 Re‐establishment  4 0 0 Re‐establishment  5 0 0 Re‐establishment  6 1 0.4 Re‐establishment  7 1 0.4 Rehabilitation  1 GW 2 is in an area not proposed for wetland credit.  3.3.5 Existing Vegetation  Riparian buffers are largely absent from streams within the open pasture, including East Mingo Creek,  Rabbit Creek, Wolf Creek, and Beaver Creek and the downstream ends of Lamb Creek and Cow Creek.  The open pasture is dominated by pasture grasses such as fescue (Festuca sp.), as well as soft rush  (Juncus effusus), and dogfennel (Eupatorium capillifolium). Portions of the pasture near Beaver Creek  contain wetland indicator vegetation such as tag alder (Alnus serrulata), duck potato (Saggitaria  latifolia), and rushes (Juncus spp). The treelines adjacent to the easement in this southern area contain  swamp tupelo (Nyssa biflora), laurel oak (Quercus laurifolia) and white oak (Quercus alba). Multiflora  rose (Rosa multiflora) occurs around the pond and in patches throughout the pasture. Chinese privet  was observed at varied densities within wooded areas throughout the Site.  Floristic diversity increases in the wooded portion of the easement between Mouse Creek and the pond  outlet swale north of Snake Creek. Canopy species include swamp tupelo (Nyssa biflora), tulip poplar  (Liriodendron tulipifera), southern red oak (Quercus falcata), mockernut hickory (Carya tomentosa),  American elm (Ulmus americana), sugarberry (Celtis laevigata), eastern red cedar (Juniperus virginiana),  sweetbay magnolia (Magnolia virginiana), water oak (Quercus nigra), and red maple (Acer rubrum). Sub‐ canopy species include American beautyberry (Callicarpa americana), red mulberry (Morus rubra),  winterberry (Ilex decidua) and American holly (Ilex opaca). The understory layer includes a variety of  forbs and graminoids including violets (Viola spp.) and river cane (Arundinaria sp.).   The forested area on the northernmost portion of the site has prolific cover of Chinese privet. Observed  in lesser densities were wisteria (Wisteria sp.), mimosa (Albizia julibrissin), and Japanese honeysuckle  (Lonicera japonica).   3.4 Overall Functional Uplift Potential  The primary stressors onsite are livestock access, incision, scour, and the resulting hydrologic  disconnection of riparian wetlands. Livestock trampling has degraded streambanks and bedform and  limited biodiversity of vegetation onsite. These stressors led to NCSAM overall ratings of low for all  streams and low for intermittent streams. Without intervention, East Mingo Creek will continue to  incise, which will further disconnect riparian wetland hydrology. The further incision of East Mingo  would cause incision along the tributaries. Ultimately, functional uplift for this Site is linked to  improvement in and maintenance of hydrologic connectivity between streams and riparian wetlands.    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 13 June 2023  Additionally, establishing a diverse riparian buffer will protect and enhance this connectivity. Functional  uplift for the site will be achieved through the following:   Restoring degraded stream channels to reduce erosion and reconnect streams to riparian  wetlands to restore hydrologic connection;   Removing extensive Chinese privet on site to increase vegetation biodiversity at the northern  portion of the Site;   Planting riparian buffers to shade streams, help stabilize streams, and promote woody debris in  system;    Protecting the Site with a conservation easement; and   Excluding livestock from the conservation easement.  These project components are described in Section 5 in terms of goals, objectives, and outcomes for the  project and in greater detail in Section 6 as the project site mitigation plan.  3.5 Site Constraints to Functional Uplift  Two internal easement breaks are included to maintain landowner access to adjoining tracts. Each  crossing proposed will be fenced and gated if needed for livestock exclusion. A ford crossing will be  located on East Mingo Creek and a ford crossing will be located on Lamb Creek. An existing overhead  utility line is located along Benson‐Hardee Road at the southern end of the project and an external  easement break is located here along East Mingo Creek up to the edge of the NCDOT right‐of‐way.  Livestock will be fenced out of this break and it will not be used as a crossing.  Cattle currently have access to the majority of the Site. After restoration, the landowner may remove  cattle from all or a part of the property. Wildlands will provide fencing along the perimeter of the  easement of any sections of the property where cattle will be present. The landowner will be required  to install fencing if cattle are returned to the property in the future.  The easement boundaries around all streams proposed for mitigation credit provide the required 50‐ foot minimum riparian buffer for Coastal Plain streams. The easement area will be marked per USACE  guidelines. The entire easement area can be accessed for construction, monitoring, and long‐term  stewardship from Benson‐Hardee Road and Banner Elk Road.   4.0 Regulatory Considerations  Table 5, below, is a summary of regulatory considerations for the Site. These considerations are  expanded upon in Sections 4.1‐4.4.  Table 6: Project Attribute Table Part 3  Regulatory Considerations  Parameters Applicable? Resolved? Supporting Docs?  Water of the United States ‐ Section 404 Yes Yes PCN  Water of the United States ‐ Section 401 Yes Yes PCN  Endangered Species Act Yes Yes Appendix 4  Historic Preservation Act Yes Yes Appendix 4  Coastal Zone Management Act No No N/A  FEMA Floodplain Compliance Yes Yes Appendix 4  Essential Fisheries Habitat No N/A N/A    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 14 June 2023  4.1 401/404  Care has been taken to design the streams to remain hydrologically connected to existing wetlands on‐ site, while minimizing impacts to those wetlands. The W. Fork East Mingo Creek will be filled during  project construction. This will be classified as a permanent stream impact and is necessary to restore the  East Mingo Creek as a single thread system. Most of the floodplain grading will be considered a  temporary impact to wetlands as hydrologic connectivity is anticipated to improve after channel  restoration, and vegetation will be re‐established. Any wetlands within the conservation easement and  outside of the limits of disturbance will be flagged prior to construction to prevent unintended impacts.  This will be noted in the final construction plans on the Erosion and Sediment Control Plan and Detail  plan sheets, as well as in the project specifications.   Table 6 estimates the anticipated impacts to wetland areas on this project. Final impacts will be  provided in the Pre‐Construction Notification, after proposed floodplain grading and the erosion control  plan are complete and will more accurately quantify these data. The numbers below reflect a  conservative estimate of potential impacts. The Pre‐Construction Notification, including this data, will be  provided to the IRT with the Final Mitigation Plan.   Table 7: Estimated Impacts to Project Wetlands  Jurisdictional  Feature Classification Acreage  Permanent (P) Impact Temporary (T) Impact  Type of  Activity  Impact Area  (acres)  Type of  Activity  Impact Area  (acres)  Wetland A  Bottomland  Hardwood  Forest  1.380  Conversion  to Stream  Resource  0.010 Floodplain  Grading 0.214  Wetland B  Bottomland  Hardwood  Forest  0.156  Conversion  to Stream  Resource  N/A Floodplain  Grading 0.015  Wetland C  Bottomland  Hardwood  Forest  1.248  Conversion  to Stream  Resource  0.170 Floodplain  Grading 0.927  Wetland D  Bottomland  Hardwood  Forest  0.041  Conversion  to Stream  Resource  0.023 Floodplain  Grading 0.018  Wetland E  Bottomland  Hardwood  Forest  0.033  Conversion  to Stream  Resource  0.010 Floodplain  Grading 0.023  Wetland F  Bottomland  Hardwood  Forest  0.679  Conversion  to Stream  Resource  N/A Floodplain  Grading 0.073  Wetland G  Bottomland  Hardwood  Forest  1.391  Conversion  to Stream  Resource  N/A Floodplain  Grading 0.045  Wetland H  Bottomland  Hardwood  Forest  0.497  Conversion  to Stream  Resource  N/A Floodplain  Grading 0.036  Wetland L  Bottomland  Hardwood  Forest  0.524  Conversion  to Stream  Resource  0.011 Floodplain  Grading 0.150    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 15 June 2023  Wetland M Headwater  Forest 1.287  Conversion  to Stream  Resource/  Permanent  Crossing  0.040 Floodplain  Grading 0.141  Wetland N Headwater  Forest 0.165 Permanent  Crossing 0.002 Floodplain  Grading N/A  Wetland O  Bottomland  Hardwood  Forest  0.109 Permanent  Crossing 0.023 Haul Road 0.017  Wetland P Headwater  Forest 0.456  Conversion  to Stream  Resource  0.001 Floodplain  Grading 0.039  Wetland Q  Bottomland  Hardwood  Forest  0.008 Permanent  Crossing 0.008 Floodplain  Grading N/A  Wetland R  Bottomland  Hardwood  Forest  0.025  Conversion  to Stream  Resource  0.007 Floodplain  Grading 0.018  Wetland S  Bottomland  Hardwood  Forest  0.022  Conversion  to Stream  Resource  0.012 Floodplain  Grading 0.010  Wetland T  Bottomland  Hardwood  Forest  0.020  Conversion  to Stream  Resource  N/A Floodplain  Grading 0.020  Wetland U  Bottomland  Hardwood  Forest  4.879  Conversion  to Stream  Resource  0.007 Floodplain  Grading 0.993  Wetland V  Bottomland  Hardwood  Forest  4.372  Conversion  to Stream  Resource  0.001 Floodplain  Grading 1.019  Wetland W Headwater  Forest 0.655  Conversion  to Stream  Resource  0.031 Floodplain  Grading 0.188  4.2 Threatened and Endangered Species  Wildlands utilized the US Fish and Wildlife Service’s (USFWS) Information for Planning and Consultation  (IPaC) and the NC Natural Heritage Program (NHP) databases to search for federally listed threatened  and endangered plant and animal species within the project parcels. The endangered red‐cockaded  woodpecker (Picoides borealis) (RCW) was the only listed species possibly occurring within the project  parcels. The red‐cockaded woodpecker requires open pine woodlands and savannahs with large, mature  trees. A pedestrian survey of the site performed on March 16, 2022 indicated there is no suitable habitat  for the red‐cockaded woodpecker. Thereby, Wildlands concludes the project will have “no effect” on the  RCW. USFWS replied to the public notice and stated it has “...no objection to the activity as described in  the permit application [public notice].” The official species list and correspondence with USFWS are  included in Appendix 4.  4.3 Cultural Resources / Conservation Lands / Natural Heritage Areas  The Site is not located near any entries listed on the National Register with the State Historic  Preservation Office (SHPO). SHPO reviewed the project prospectus and responded in a letter dated July    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 16 June 2023  12, 2021 that they are “aware of no historic resources which would be affected by the project.” For  regulatory communication, please refer to Appendix 5.   4.4 FEMA Floodplain Compliance and Hydrologic Trespass  The Bank is represented on the Johnston County Flood Insurance  Rate Map (FIRM) Panels 1620 and 1528. A limited detailed study  has been performed on East Mingo Creek. The majority of the Bank  is mapped in special flood hazard area FEMA Zone AE. There is no  mapped floodway.   Due to the Priority 1 approach on East Mingo Creek within the  mapped Zone AE, it is likely that base flood water surface  elevations will change from the published elevations. If this occurs,  a Conditional Letter of Map Revision (CLOMR) may be required  prior to construction. If required, a Letter of Map Revision (LOMR)  will be submitted after the project is constructed. Wildlands will  coordinate with the Town of Benson floodplain administrator to  obtain the appropriate floodplain development permit for the  project.  The Bank will be designed to avoid adverse floodplain impacts or  hydrologic trespass on adjacent properties or local roadways.   5.0 Mitigation Site Goals and Objectives  The overall goal of the project is to improve stream and riparian wetland function through stream  restoration and riparian buffer re‐vegetation. Project goals have been set in order to achieve the  functional uplift outlined in Section 3 and alleviate the watershed stressors. The project goals and  related objectives are described in Table 7, below.      FIRM Panel 1620    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 17 June 2023  Table 8: Mitigation Goals and Objectives   Goal Objective Expected Outcomes  Exclude livestock  from streams and  wetlands.  Remove livestock from site or install  livestock exclusion fencing along the  conservation easement.  Reduce sediment, turbidity, nutrient, and fecal  coliform bacteria inputs.  Improve stream  channel stability.  Construct stream channels that will  maintain stable cross‐sections, patterns,  and profiles over time. Repair eroding  stream banks with bioengineering.   Reduce shear stress on channel boundary. Reduce  sediment inputs from bank erosion.   Improve instream  habitat.  Install habitat features such as  constructed riffles, cover logs, and brush  toes in restored/enhanced streams. Add  woody materials to channel beds.  Construct pools of varying depth.   Increase and diversify available habitats for  macroinvertebrates, fish, and amphibians, leading  to colonization and an increase in biodiversity over  time. Add complexity including large woody debris  (LWD) to the streams.  Reconnect  channels with  floodplains.  Construct stream channels with  appropriate bankfull dimensions and  depth relative to the existing floodplain.  Allow more frequent flood flows to disperse on the  floodplain. Support geomorphology and higher‐ level functions. Improve wetland hydrology.  Improve wetland  hydrology.  Remove livestock to allow soil profiles to  stabilize. Remove drain effect of  channelized streams and floodplain  ditches.  Increased surface water residency time will provide  contact treatment and groundwater recharge  potential.   Restore and  enhance native  floodplain and  streambank  vegetation.  Plant native canopy and understory  species in riparian and wetland zones and  plant native shrub and herbaceous species  on streambanks. Treat invasive species  within the project area.  Reduce sediment inputs from bank erosion and  runoff. Increase nutrient cycling and storage in  floodplain. Provide riparian habitat. Add a source  of LWD and organic material to streams. Support  all stream functions.    Permanently  protect the project  from harmful uses.  Establish a conservation easement on the  Bank.   Protect Bank from encroachment on the riparian  corridor and direct impact to streams and  wetlands. Support all stream functions.    6.0 Design Approach and Mitigation Work Plan  6.1 Design Approach Overview   The design approach (Figure 8) for this site was developed to maximize functional uplift and meet the  goals and objectives described in Section 5. The table below summarizes the primary impairments to  each stream reach and the proposed restoration activity.     East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 18 June 2023  Table 9: Functional Impairments and Restoration Approach  Resource Reach Primary Stressors/Impairments Restoration Approach  East Mingo  Creek  1  Incised, unstable pattern, streambank scouring, mass  wasting of bank material, lack of bedform diversity,  livestock access  Restoration – Priority 1  2 Livestock access, lack of riparian buffer Enhancement II  Lizard Creek ‐ Incised, isolated erosion, livestock access Restoration – Priority 1  Cricket Creek 1 Livestock access, invasive monoculture riparian  understory Enhancement II   2 Incised, Isolated erosion, livestock access Restoration – Priority 1  Snake Creek  1 Livestock access, lack of riparian understory Enhancement II   2 Incision, active headcuts, lack of riparian understory,  livestock access Restoration – Priority 1  Snake Creek  Anabranch ‐ Livestock access, lack of riparian understory Enhancement II (Not for  Credit)  Deer Creek 1 Livestock access, lack of riparian understory Enhancement II   2   Restoration – Priority 1  Mouse Creek 1 Livestock access, lack of riparian understory Enhancement II   2 Incised, Isolated erosion, livestock access Restoration – Priority 1  Rabbit Creek 1  Livestock access, lack of riparian understory Enhancement II   2 Incised, Isolated erosion, livestock access Restoration – Priority 1  UT to Rabbit  Creek ‐   Livestock access, lack of riparian understory Enhancement II   Wolf Creek ‐ Isolated erosion, livestock access Enhancement II   Lamb Creek  1  Livestock access, lack of riparian understory Enhancement II  (Headwater Guidance)  2 Livestock access, lack of pattern, lack of riparian  buffer, bank trampling Restoration – Priority 1  Cow Creek ‐ Livestock access, lack of riparian understory Enhancement II   Beaver Creek ‐ Ponded headwater, livestock access, lack of riparian  buffer, incision in failed pond dam.  Restoration – Priority 1  and Priority 2  UT to Beaver  Creek ‐ Livestock access, lack of riparian buffer  Restoration – Priority 1    6.2 Reference Streams  Reference reaches were chosen to inform the design because of their similarities to the Site streams  including drainage area, valley slope, morphology, and bed material (Figure 9). They were also chosen  for their examples of pool formation using woody debris in low slope conditions. Geomorphic  parameters for these reference reaches are summarized in Appendix 4 (except for reference reaches  only used for discharge analysis). A brief description of each reference reach is included in Table 9.          East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 19 June 2023  Table 10: Stream Reference Data Used in Development of Design Parameters  Reference Reach  Stream  Type Landscape Position Chosen For Used For Used on  streams  Scout West 1 E5/C5b  Headwater, steeper  tributary (~2.6%),  flowing into broad  flat mainstem  Similar region to Site with  same controlling hydrology  Q, Dimension,  Pattern,  Profile  Tributaries  Scout West 2 E5 Wide, low slope  alluvial valley.  Sandbed with examples of  woody debris pool  structures, pattern, and  similar landscape position to  tributaries  Q, Dimension,  Pattern,  Profile  Tributaries  Scout East 2 E5 Wide, low slope,  alluvial valley  Channel slope, size, and  pattern, and habitat  structures  Q, Dimension,  Pattern,  Profile  Tributaries  Johanna E5/C5 Wide, low slope,  alluvial valley  Channel dimensions,  landscape position, habitat  structures, pattern, slope   Q, Dimension,  Pattern,  Profile  East  Mingo  Creek and  Tributaries  Outland Branch C6C/D6 Low slope, alluvial  valley  Channel dimensions,  landscape position, habitat  structures, pattern, slope  Q, Dimension,  Pattern,  Profile  East  Mingo  Creek and  Tributaries  Raven Rock Site  2 E4b Low slope, alluvial  valley Similar drainage area Q Tributaries  Acorn Millpond  Reach 1 C6  Low slope, alluvial  valley  Similar drainage area Q Tributaries  Acorn Millpond  Reach 2 C6 Low slope, alluvial  valley  Similar drainage area Q  East  Mingo  Creek and  Tributaries    6.3 Reference Wetland and Vegetation  One reference wetland, Johanna Creek, which has been monitored for a period of greater than five  years was identified for this project. Johanna Creek is within 30 miles of the Site and was initially  identified in 2001 by Buck Engineering and was used by Wildlands for the Devils Racetrack Mitigation  Site that closed out in 2021. Hydrology at the Site was maintained continuously for over 10 years. The  Site is an example of a Coastal Plain small stream swamp as described by Schafale and Weakley (1990).  These systems exist as the floodplains of small blackwater and brownwater streams in which separate  fluvial features and associated vegetation are too small or poorly developed to distinguish. Hydrology of  these systems is palustrine, intermittently, temporarily, or seasonally flooded. Flows tend to be highly  variable with floods of short duration and periods of very low flow. Johanna Creek reference wetland  has similar hydrologic controls as the Site with the main stream channel flowing through the Site and  small drainages that provide additional water to the floodplain during wet periods. Due to the shallow,  unincised condition of the main stream at Johanna Creek, the high water table conditions are sustained  across the active floodplain. Monitoring data for Johana Creek presented below was taken between    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 20 June 2023  2006 and 2010. The table below presents the results for the growing seasons. The hydrology results  reported are the consecutive period of the growing season during which the water table was within 12  inches of the soil surface. Annual results are averaged over the five‐year period to provide a range of  anticipated conditions for comparison to the restoration site.   Table 11: Reference Wetland Hydrology Results 2006‐2010  Max Hydroperiod by Year (Growing Season 17‐Mar through 5‐Nov, 232 days)  Reach 2006 2007 2008 2009 2010 Average  Johanna Ref MW1 8 3 2 3 18 6.8  Johanna Ref MW2 8 8 8 15 14 10.6  Johanna Ref AW3 29 19 22 17 18 21.0  Johanna Ref MW4 9 19 16 16 13 14.6  Johanna Ref MW5 0 1 0 0 13 2.8    Soils located within the wetland areas of the reference site are mapped as the Bibb series, which has  moderate permeability and the seasonal high water table is within 0.5 to 1.5 feet of soil surface.  (SCS,  1994). Wildlands confirmed the soil series with an onsite investigation.   Historical aerials reveal that the Johanna Creek reference wetland area has not been cleared since 1939.  The reference wetland area has vegetation that is classified as Coastal Plain small stream swamp and  bottomland forest types (Schafale & Weakley, 1990). Dominant species include swamp chestnut oak  (Quercus michauxii), laurel oak, red maple, sweetbay magnolia, river birch (Betula nigra), tulip poplar,  sweetgum (Liquidambar styraciflua), green ash (Fraxinus pennsylvanica), and sycamore (Platanus  occidentalis). Common understory vegetation includes ironwood (Carpinus caroliniana), American holly,  leucothoe (Leucothoe axillaris), sweet pepperbush (Clethra alnifolia), and swamp titi (Cyrilla  racemiflora). The herbaceous stratum consists of microstegium (Microstegium vimineum), false nettle  (Boehmeria cylindrica), jewel‐weed (Impatiens capensis), cinnamon fern (Osmunda cinnamomea),  sensitive fern (Onoclea sensibilis), greenbrier (Smilax spp.), Virginia creeper (Parthenocissus  quinquefolia), grape (Vitis spp.), poison ivy (Toxicodendron radicans), and honeysuckle.    6.4 Design Channel Morphological Parameters  A combination of reference reach data and designer experience was used to develop design parameters  for streams onsite. Key morphological parameters are summarized in tables below and extended  parameter tables can be found in Appendix 1.                  East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 21 June 2023  Table 12: Summary of Morphological Parameters for East Mingo Creek  Parameter     Existing  Parameters Reference Parameters Proposed  Parameters  East Mingo Creek  Reach 1 Cedar Creek Johanna Outland Branch East Mingo Creek  Reach 1  min max min max min max min max min max  Valley Width (ft) 210 395 ‐  ‐  ‐ ‐  ‐  ‐ 210 395  Contributing Drainage Area  (acres) 2,067 2,605 576 518 2,067  Channel/ Reach  Classification F5 E5 E5/C5 C6c/D6 C5  Design Discharge Width (ft) 15.0 16.8 11.1 12 9.7 10.6 12.1 16  Design Discharge Depth (ft) 1.3 1.7 1.8 0.80 0.5 0.6 1.2  Design Discharge Area (ft2) 18.9 22.3 18.9 22.2 7.2 7.8 5.5 6.1 18.6  Design Discharge Velocity  (ft/s) 1.6 1.7 3.0 3.1 1.8 1.9 1.9 2.1 1.9  Design Discharge (cfs) 35 57 68 14 10.3 13.1 35  Water Surface Slope (%) 0.12 0.30 0.22 0.70 0.20  Sinuosity 1.22 1.2 1.2 1.2 1.1 1.3  Width/ Depth Ratio 11.9 12.7 6.54 6.6 10.1 19.7 18.4 26.3 14  Bank Height Ratio 2.4 2.9 1.0 1.0 1.0 1.0 1.0 1.0 1.0  Entrenchment Ratio 1.4 >2.2 8.0 9.6 20.7 23.5 >2.2    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 22 June 2023  Table 13: Summary of Morphological Parameters for Beaver Creek, Cricket Creek, and Deer Creek  Parameter     Existing Parameters Reference Parameters Proposed Parameters  Beaver  Creek  Cricket  Creek  Reach  2  Deer  Creek  Reach  2  Scout West 1 Scout West 2 Scout East 2 Beaver  Creek  Cricket  Creek  Reach  2  Deer  Creek  Reach  2 min max min max min max  Valley Width (ft) 40 65 >100 ‐ ‐ ‐ ‐ ‐ ‐ 50 65 >100  Contributing Drainage  Area (acres) 14.7 1.7 20.5 38.4 218 429 3.2 1.69 20.48  Channel/ Reach  Classification E5b E5b C5b E/C5b E5 E5 C5 C5 C5  Design Discharge Width  (ft) 2.7 2.1 4.3 2.6 6.3 5.6 7.6 4.7 6.1 5.6 7.0 5.6  Design Discharge Depth  (ft) 0.8 0.5 0.2 0.30 0.50 0.7 1.0 1.1 1.3 0.44 0.6 0.44  Design Discharge Area  (ft2) 2.5 1.1 1.1 1.2 2.0 5.3 5.4 6 6.9 2.5 3.9 2.5  Design Discharge  Velocity (ft/s) 6.4 2.9 3.3 1.3 2.3 1.2 1.2 2.9 2.5 1.2 1.2 1.5  Design Discharge (cfs) 2.9 1.4 3.4 2.6 6.4 17.5 2.9 1.4 3.4  Water Surface Slope  (%) 5.6 3.2 4.0 2.6 4.0 1.68 2.3 0.19 1.1  Sinuosity 1.1 1.08 1.16 1.1 1.2 1.2 1.20 1.20 1.20  Width/ Depth Ratio 3.2 7.9 17.3 5.4 19.9 5.7 11 3.6 5.4 13.0 13.0 13.0  Bank Height Ratio 1.0 2.1 1.4 1.1 1.3 1.1 1.2 1.0 1.0 1.0 1.0  Entrenchment Ratio >2.2 1.9 >2.2 >2.2 >2.2 >2.2 >2.2 >2.2 >2.2    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 23 June 2023  Table 14: Summary of Morphological Parameters for Lamb Creek, Lizard Creek, and Mouse Creek  Parameter     Existing Parameters Reference Parameters Proposed Parameters  Lamb  Creek  Reach 2  Lizard  Creek  Reach  2  Mouse  Creek  Reach  2  Scout West 1 Scout West 2 Scout East 2 Lamb  Creek  Reach  2  Lizard  Creek  Reach  2  Mouse  Creek  Reach  2  min max min max min max  Valley Width (ft) 50 75 >100 ‐ ‐ ‐ ‐ ‐ ‐ 50 75 >100  Contributing Drainage  Area (acres) 14.1 33.3 3.8 38.4 218 429 14.08 33.28 3.84  Channel/ Reach  Classification E5 E5b E5 E/C5b E5 E5 C5 C5 C5  Design Discharge  Width (ft) 16.6 2.7 5.5 2.6 6.3 5.6 7.6 4.7 6.1 5.4 7 0.31  Design Discharge  Depth (ft) 0.3 0.3 0.4 0.30 0.50 0.7 1.0 1.1 1.3 0.43 0.55 4  Design Discharge Area  (ft2) 1.5 0.93 2.3 1.2 2.0 5.3 5.4 6 6.9 2.3 3.9 1.3  Design Discharge  Velocity (ft/s) 2.3 3.7 3.7 1.3 2.3 1.2 1.2 2.9 2.5 1.3 1.2 1.2  Design Discharge (cfs) 2.8 4.5 1.5 2.6 6.4 17.5 2.8 4.5 1.5  Water Surface Slope  (%) 1.6 3.6 2.6 2.6 4.0 1.68 1.5 1.3 0.48  Sinuosity 1.11 1.03 1.20 1.1 1.2 1.2 1.20 1.20 1.20  Width/ Depth Ratio 16.6 7.8 12.8 5.4 19.9 5.7 11 3.6 5.4 13.0 13.0 13.0  Bank Height Ratio 1.0 1.9 1.8 1.1 1.3 1.1 1.2 1.0 1.0 1.0 1.0  Entrenchment Ratio >2.2 >2.2 >2.2 >2.2 >2.2 >2.2 >2.2 >2.2 >2.2    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 24 June 2023  Table 15: Summary of Morphological Parameters for Rabbit Creek, Snake Creek, and UT to Beaver Creek  Parameter     Existing Parameters Reference Parameters Proposed Parameters  Rabbit  Creek  Reach 2  Snake  Creek  Reach  2  UT to  Beaver  Creek   Scout West 1 Scout West 2 Scout East 2 Rabbit  Creek  Reach  2  Snake  Creek  Reach  2  UT to  Beaver  Creek  min max min max min max  Valley Width (ft) >100 > 100 20 ‐ ‐ ‐ ‐ ‐ ‐ >100 > 100 20  Contributing Drainage  Area (acres) 37.8 147.2 3.2 38.4 218 429 37.76 147.2 14.72  Channel/ Reach  Classification C5 E5 C5b E/C5b E5 E5 C5 C6 B5  Design Discharge  Width (ft) 6.2 5.9 2.3 2.6 6.3 5.6 7.6 4.7 6.1 6.2 8.6 2.5  Design Discharge  Depth (ft) 0.5 0.7 0.2 0.30 0.50 0.7 1.0 1.1 1.3 0.5 0.69 1.5  Design Discharge Area  (ft2) 3.0 4.0 0.4 1.2 2.0 5.3 5.4 6 6.9 3.0 6.2 0.6  Design Discharge  Velocity (ft/s) 3.4 3.9 3.5 1.3 2.3 1.2 1.2 2.9 2.5 1.7 1.6 3.4  Design Discharge (cfs) 4.8 10 1.0 2.6 6.4 17.5 4.8 10 1.0  Water Surface Slope  (%) 1.8 1.6 7.0 2.6 4.0 1.68 0.51 1.2 7.9  Sinuosity 1.09 1.29 1.12 1.1 1.2 1.2 1.20 1.20 1.20  Width/ Depth Ratio 12.8 8.7 12.3 5.4 19.9 5.7 11 3.6 5.4 13.0 13.0 10.0  Bank Height Ratio 2.0 1.8 1.4 1.1 1.3 1.1 1.2 1.0 1.0 1.0 1.0  Entrenchment Ratio 2.1 >2.2 >2.2 >2.2 >2.2 >2.2 >2.3 >2.2 >2.2    6.5 Design Bankfull Discharge Analysis  The primary design goal for restoration reaches onsite is to hydraulically connect the reaches to their  existing floodplains to prevent continued incision along Site streams. This means selecting a design  discharge that allows for frequent overbank events. Multiple methods were used to develop design  discharges for restoration reaches, including published regional curve data (Doll et al. 2003), reference  reach data, and existing bankfull indicators. Additionally, Wildlands performed a regional flood  frequency analysis using U.S. Geological Survey (USGS) gage sites. Results are shown in Table 15 and  illustrated in Figure 10.     East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 25 June 2023  Table 16: Summary of Design Discharge Analysis  East  Mingo  Creek  Reach 1  Snake  Creek  Rabbit  Creek  Reach 2  Lizard  Creek  Deer  Creek  Reach 2  Lamb  Creek  Reach 2  Beaver  Creek  Mouse  Creek  Reach 2  Cricket  Creek  UT to  Beaver  Creek  DA (acres) 2,067 185 34 32 20 14 12 9.4 1.7 0.5  DA (sq. mi.) 3.2 0.29 0.053 0.051 0.031 0.021 0.019 0.015 0.0026 0.00075  NC Rural Coastal  Plain Regional  Curve (cfs)  39 6.8 4.1 1.9 1.4 1.0 1.0 0.8 0.2 0.09  Wildlands  Regional  USGS  Flood  Frequency  Analysis  (cfs)  1.2‐ year  event  38 9.9 3.8 3.7 2.9 2.3 2.2 1.9 0.7 0.4  1.5‐ year  event  56 16 6.7 6.6 5.2 4.2 4.0 3.5 1.4 0.8  Site‐Specific  Reference Reach  Curve (cfs)  24 8.5 4.5 4.0 3.3 2.8 2.7 2.4 1.1 0.7  Manning's  Equation  From  Surveyed  XS (cfs)  XS4 38                    XS5 23                    XS6       3.5              XS7         3.6            XS8               8.7      Design Q 35 10 4.8 4.5 3.4 2.8 2.9 2.5 1.4 0.8    The results of the discharge analysis provided a range of discharge values. As illustrated in Figure 12, the  most concurrence was found between values for the site‐specific reference reach curve and the  Wildlands regional flood frequency analysis 1.2‐ or 1.5‐year storm. The final design values are generally  in line with the site‐specific reference reach curve. This was chosen for its development using sites of  similar size within the Coastal Plain.  6.6 Sediment Transport Analysis  Wildlands performed a qualitative assessment of sediment supply and sources in the project watershed  using past, current, and projected future land use conditions from the National Land Cover Database  (NLCD), historic and current aerial photography, and future county zoning maps.  The prominent sediment source within the Site is stream bank erosion that is exhibited on Reach 1 of  East Mingo Creek. A competence analysis was performed using shear stress as calculated by the Shields  (1936) and Andrews (1984) equation described by Rosgen (2001). The results of the competence  analysis are shown in Table 16.        East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 26 June 2023  Table 17: Results of Competence Analysis  East  Mingo  Creek  Reach 1  Lizard  Creek  Snake  Creek  Reach 2  Deer  Creek  Reach 2  Mouse  Creek  Reach  2  Rabbit  Creek  Reach  2  Lamb  Creek  Reach 2  Beaver  Creek  Reach 1  Design Abkf (sq ft) 18.6 3.9 6.2 2.5 1.3 3.0 2.3 2.5  Design Wbkf (ft) 16.0 7.0 8.9 5.6 4.0 6.2 5.4 5.6  Design Dbkf (ft) 1.16 0.55 0.69 0.44 0.31 0.49 0.43 0.44  Design Schan (ft/ft) 0.0022 0.0025 0.0033 0.0050 0.0050 0.0055 0.012 0.023  Design Bankfull Velocity  (fps) 1.9 1.2 1.6 1.5 1.5 1.7 1.3 1.2  Bankfull Shear Stress, t  (lb/sq ft) 0.15 0.08 0.14 0.13 0.09 0.16 0.11 0.09  Movable particle size (mm) 38.4 24.3 35.5 34.1 26.6 40.0 29.3 25.3  The competence analysis was used to guide channel plan, pattern, profile, and material sizing. Site  streams are predominately sandbed with interspersed gravel. East Mingo Creek, Lizard Creek, Snake  Creek, and Beaver Creek have low valley slopes and low channel slopes. To ensure adequate sediment  transport competence was maintained, reaches were designed with longer pools and shorter riffles. This  increased localized velocities at the stream riffles. The competence analysis on these reaches indicated  reaches could transport medium sized gravel, but not the maximum particle size. Knowing localized  shear stresses could be higher based on individual riffle velocities, the bed material will be sized to pass  sand and small gravels, with the D50 and Dmax being similar to existing conditions. Additionally, since  the Site is prone to degradation, design will include threshold structures to prevent head cuts from  forming and migrating. Such structures will include log drops, constructed riffles with rock, and  combinations of the two.  6.7 Project Implementation  6.7.1 East Mingo Creek  East Mingo Creek Reach 1 will be restored using a Priority 1 restoration approach. The stream will be  reconnected with an active floodplain and the channel will be reconstructed with stable dimension,  pattern, and profile to transport water and sediment delivered to the system. Streams will meander  through their natural valleys, restoring pattern to a previously straightened and ditched system. East  Mingo Creek Reach 1 is a very flat section of the project. Therefore, as discussed in the sediment  transport sections, pools were designed flat to allow for grade drop over riffles. Stream structures in this  reach are placed primarily for habitat formation and maintenance as there is low shear stress. Woody  material will be incorporated as much as possible to mimic conditions found in the reference reaches.  East Mingo Creek Reach 2 will incorporate similar habitat structures to provide variability within the  reach.   6.7.2 Lizard Creek  Lizard Creek will be restored using a Priority 1 restoration approach to reconnect the channel to the  historic floodplain. The stream will meander until it flows into East Mingo Creek. Structures along this  reach will be both grade control and habitat‐driven, incorporating logs and woody debris to promote  stable fish and macroinvertebrate habitat.  6.7.3 Cricket Creek  Enhancement II is proposed for Cricket Creek Reach 1. Native riparian buffers will be planted and  invasives will be treated. Reach 2 will be restored using a Priority 1 approach and connected to the    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 27 June 2023  proposed elevation of East Mingo Creek Reach 1. Structures made with logs and woody debris will be  incorporated to control grade and provide fish and macroinvertebrate habitat.  6.7.4 Snake Creek and Snake Creek Anabranch  Snake Creek Reach 1 is slated for Enhancement II. Livestock will be removed from the channel.  Additionally, invasive species within the riparian buffer will be treated. Reach 2 consists of a small reach  downstream of a headcut. The headcut will be stabilized and Reach 2 will be fully restored, introducing a  meander before meeting up with East Mingo Creek. Structures along this reach will be both grade  control and habitat‐driven, incorporating logs and woody debris to promote stable fish and  macroinvertebrate habitat. Snake Creek Anabranch is not for credit and will be connected into the newly  restored East Mingo Creek.   6.7.5 Deer Creek, Mouse Creek, and Rabbit Creek  Enhancement II is proposed for the upstream reaches of Deer Creek, Mouse Creek and Rabbit Creek.  Livestock will be removed from the Site or excluded from the conservation easement using fencing.  Additionally, native riparian buffers will be established, and the invasive colony of Chinese privet will be  treated. Reach 2 on each Creek will be restored using a Priority 1 approach and connected to adjacent  floodplain wetlands and proposed East Mingo Creek. Structures along this reach will be both grade  control and habitat‐driven, incorporating logs and woody debris to promote stable fish and  macroinvertebrate habitat.  6.7.6 UT to Rabbit Creek  Enhancement II is proposed for UT to Rabbit Creek. Livestock will be removed from the Site or excluded  from the conservation easement using fencing. Additionally, native riparian buffers will be established,  and the invasives will be treated.   6.7.7 Wolf Creek  Enhancement II is proposed for Wolf Creek. Livestock will be removed from the Site or excluded from  the conservation easement using fencing. Additionally, native riparian buffers will be established, and  the invasives will be treated. Bedform diversity will be introduced where Wolf Creek is connected to  proposed East Mingo Creek. This section will also include a structure for grade control and woody debris  to promote stable fish and macroinvertebrate habitat.  6.7.8   Lamb Creek  Enhancement II is proposed for Lamb Creek Reach 1. Livestock will be removed from the Site or  excluded from the conservation easement using fencing. Additionally, native riparian buffers will be  established, and the invasives will be treated. A ford crossing will be constructed in the easement break  just upstream of where Lamb Creek enters the East Mingo floodplain. Downstream of the crossing,  Reach 2 will be restored using a Priority 1 approach and connected to adjacent riparian wetlands with  appropriate pattern. Structures along this reach will be both grade control and habitat‐driven,  incorporating logs and woody debris to promote stable fish and macroinvertebrate habitat.  6.7.9   Cow Creek  Enhancement II is proposed for Cow Creek. Livestock will be removed from the Site or excluded from the  conservation easement using fencing. Additionally, native riparian buffers will be established, and the  invasives will be treated. There are existing farm ponds upstream of Cow Creek that are outside of the  project parcel. While these ponds control flow to Cow Creek, Wildlands does not have any control over  them or their respective property parcel.    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 28 June 2023  6.7.10   Beaver Creek and UT to Beaver Creek  The pond and dam on Beaver Creek will be removed and Beaver Creek and UT to Beaver Creek will be  restored using Priority 1 restoration from its origin until it reaches the floodplain of East Mingo Creek,  where it spreads out into an existing wetland. Structures along this reach will be both grade control and  habitat‐driven, incorporating logs and woody debris to promote stable fish and macroinvertebrate  habitat.  6.7.11  Wetland Design Implementation  Proposed wetland mitigation at the Site includes re‐establishment of drained, historic wetlands and  rehabilitation and enhancement of existing jurisdictional wetland features. Wetland re‐establishment is  proposed on 16.642 acres of relic hydric soils that lack a contemporary wetland hydrology regime.  Wetland rehabilitation is proposed on 4.174 acres of existing jurisdictional wetland that have  hydrological and vegetation impairments. 10.087 acres are proposed for wetland enhancement via  vegetation improvements and cattle exclusion.  Multiple restoration components will restore wetland hydrology to areas proposed for wetland  rehabilitation and re‐establishment. Elevating the East Mingo Creek streambed will reduce groundwater  drainage to the channel and increase interaction of the stream with floodplain wetlands. Although the  West Fork of East Mingo Creek is currently classified as a jurisdictional stream channel, it appears to  have formed as a result of disturbance and accelerated erosional forces. Portions of this channel have a  wetted bottom through much of the year; however, it is mostly stagnant during normal flow conditions  and only conveys flow during higher stages of East Mingo Creek. The West Fork of East Mingo Creek is  several feet deep and contributes to draining historic floodplain wetlands. Filling this poorly‐functioning  channel is proposed to favor wetland restoration and a net ecological improvement is expected as a  result. The non‐jurisdictional, erosional channels and the toe slope ditch up valley of West Fork of East  Mingo Creek will also be filled since they have a similar drainage effect on historic wetlands as well as a  partial drainage effect to portions of Wetland C.   Wetland F and Wetland G discharge groundwater. Cattle disturbance has allowed this discharging water  to form erosional channels connecting them to the current East Mingo Creek channel. Re‐aligning East  Mingo Creek will eliminate this direct discharge to the channel and favor soil saturation between  Wetlands F and G and the new stream channel.   Part of Wetland W is formed in a former pond bed. Following removal of the failed dam, construction of  a stream channel, and floodplain grading, a more naturally functioning wetland is expected to develop in  this area. This portion of Wetland W is proposed for rehabilitation credit.  Wetlands proposed for enhancement generally have sufficient wetland hydrology such that function will  improve over time with removal of stressors and vegetation improvements. Cattle will be excluded,  appropriate native hydrophytic plant communities will be established, and invasive species populations  will be treated in all wetland credit areas.   6.8 Vegetation, Planting Plan, and Land Management  6.8.1 Vegetation and Planting Plan  The objective of the planting plan is to establish, over time, a thriving riparian buffer composed of native  species. The planting plan resembles a Coastal Plain small stream swamp community type for most  portions of the Site. In the long‐term ponded areas (4.6 acres), it resembles a transitional natural  community of mixed shrubs, bald cypress (Taxodium distichum), and blackwater bottomland hardwoods  that mimics the dynamic nature of frequently flooded landscapes in the Upper Coastal Plain.     East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 29 June 2023  Though land use history has drastically altered the floristic composition throughout the Site, the  observed existing vegetation in the wooded areas, the primary soil type, Bibb, and the blackwater  nature of East Mingo Creek are indicators of a Coastal Plain small stream swamp, inferring one of our  target natural communities. Coastal Plain small stream swamps are explicitly described as being highly  varied in species composition, though Carolina Vegetation Survey data indicates that sweetgum, water  oak, laurel oak, red maple, loblolly pine, tulip poplar, and swamp tupelo are most commonly the  dominant canopy species (Schafale, 2012). The proposed tree and shrub species compositions for this  Site reflect the native existing vegetation, which includes many of the indicator species for Coastal Plain  small stream swamps. Some adaptations were made to target community species composition based on  commercial availability, and to omit tree species (red maple, sweetgum, and loblolly pine).  Portions of the project are open canopy and ponded with up to 3 inches of standing water for prolonged  periods of the year (Figure 3). These areas are referred to as long‐term ponded areas in figures,  discussion text, and planting tables. They contain wetland indicator vegetation such as tag alder, duck  potato, and rushes. Where not grazed they transition into forested wetland primarily comprised of  swamp tupelo and laurel oak. Based on the flooding regime and surrounding indicator vegetation, the  target natural community at the end of the monitoring period is a transitional community with  components of both blackwater bottomland hardwood (swamp transition subtype) and Coastal Plain  wet shrubland (Hall and Howard, 2022). The long‐term ponded area planting zones are designed to  encompass all the non‐forested ponded areas as well as some surrounding wetlands not found to be  frequently flooded. The zones were simplified for the labor force planting the trees.  Blackwater bottomland hardwood (swamp transition subtype) has a large component of bald cypress  and swamp tupelo. Overcup oak (Quercus lyrata) and laurel oak are strong indicator species as well,  with understory and herbaceous forest strata generally lacking (Schafale, 2012). The indicator  vegetation described in coastal plain general wet shrublands, as defined by the North Carolina  Biodiversity Project (Hall and Howard, 2022), is not well matched to the existing vegetation found  onsite. However, biogeographic foundations of this natural community, such as ponding regime, align to  the conditions of the Site. The Site has a long history of anthropogenic disturbance that may have  inhibited the establishment of the dominant species described in Hall and Howard’s Coastal Plain  general wet shrubland (such as swamp highbush blueberry (Vaccinium formosum) or southern  arrowwood (Viburnum dentatum). Most of the indicator shrub species for this natural community type  are not commercially available. Wildlands will add flood‐tolerant shrubs such as tag alder, buttonbush  (Cephalanthus occidentalis), and winterberry to the blackwater bottomland hardwood forest (swamp  subtype) to provide the ecological function of a coastal plain general wet shrubland succeeding to  hardwood forest.   Given the hydrology of the long‐term ponded areas, it can be expected that tree growth will be  influenced by the duration of ponding. By including a mixture of trees, shrubs, bare root size class and  live stake size class, the mid‐successional and transitional nature of this planting zone has an integrated  adaptability to mitigate the risk of growth impediment due to ponding. It is proposed that the  performance criteria for the blackwater bottomland hardwood forest (swamp transition subtype) be the  survival of 180 stems per acre averaging five feet tall at the end of MY7. Performance standards are  further explained in section 8.0 Performance Standards. Research has shown that bare roots planted  into standing water shed their existing root systems and grow entirely new root systems adapted for  prolonged saturated conditions (Conner, 2004). According to Conner, the species in his research found  to be most tolerant of planting into standing water are bald cypress, black willow, and water tupelo. At  the Falling Creek Mitigation Site and McClenny Mitigation Site, bald cypress proved to be a strong  performer in vegetation establishment of heavily saturated soils.    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 30 June 2023  For these reasons, our transitional community has a strong bald cypress component. Practical  considerations for vegetation establishment in this area led to some adaptations to the target  community species composition, including commercial availability. Several native species such as silky  willow and buttonbush were selected based on commercial availability of live stakes, which will develop  flood‐tolerant roots without the traumatic process of shedding existing roots. Twenty‐five percent of the  stems to be planted in this zone will be live stakes.   The restored buffer will improve riparian and wetland habitat, enhance stream stability, shade the  streams and wetlands, and provide a source of organic material. Non‐forested areas within the  conservation easement will be revegetated with a combination of trees, shrubs, forbs, and grasses. The  selected species assemblage is based on the existing natural community types, reference sites, and  professional judgement regarding species establishment in the anticipated Site conditions. The  streambanks will be planted with regionally appropriate live stakes and herbaceous plugs. Permanent  native seed mixes are based on the proposed target communities, professional judgement regarding  seed establishment, and commercial availability. Separate seed mixes were developed for wetland areas  and will be broadcast on all disturbed areas in the conservation easement. The complete planting plan is  found in the preliminary design plans. Planting tables are located on Sheet 2.0 of the draft plans located  in Appendix 9.   The non‐wooded riparian buffer areas will be planted with bare root seedlings. Species planted as bare  roots will be planted at 12‐foot by 6‐foot spacing. In addition, streambanks will be planted with live  stakes. Herbaceous plugs will be planted throughout the Site in combination with instream structures to  add toe‐of‐slope protection for the streambanks.   To help ensure tree growth and survival, soil tests may be performed across the Site and amendments  may be applied based on results. Subsoils exposed during construction may be especially difficult for  establishment of vegetation. Soil samples may be taken at grade in the floodplain where soil is  anticipated to be moved during construction.   Additional monitoring and maintenance issues regarding vegetation can be found in Sections 8, 9, and  10 and Appendix 5.   6.8.2 Land Management   The primary purpose of land management prior to construction is to effectively treat invasive plant  populations and to assess soil quality. As detailed below, populations of invasive plants on the Site will  be monitored by Wildlands and treated as necessary both before and during the monitoring period.  Wildlands will also monitor the Site for future land management issues, such as floodplain erosion, bare  areas, and boundary encroachments that arise during the monitoring period.  Exotic invasive species within the conservation easement will be treated using a combination of  different mechanical and chemical techniques. Princess tree (Paulownia tomentosa), wisteria, mimosa,  multiflora rose, and Japanese honeysuckle occur at low densities (< 1%) in the riparian corridor.  Occurrences of Chinese privet will be removed throughout the project, the most extensive and densest  of which is found in the northern portion of the Site. Prior to construction, this monotypic Chinese privet  infestation will be mechanically removed with a mulcher/masticator and cut stump treated with a 25%  triclopyr or glyphosate solution. Outside of the monotypic ‘privet forest’ and where feasible, mechanical  removal of exotic invasives species may take place during construction. Otherwise, exotic invasive plant  species will be controlled using a variety of mechanical and chemical methods based on species, size,  extent, and professional judgement throughout the monitoring period. Multiple treatments are  expected for satisfactory reduction of invasives, especially in the ‘privet forest’ where root sprouts, stem    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 31 June 2023  sprouts, or seed bank release may require follow‐up chemical control. During the floristic inventory  there were incidental observations of several multiflora rose bushes which appeared to have rose  rosette disease (Emaravirus sp.). It is spread by a small mite. If the presence of rose rosette disease is  accurate there may be an element of biological control happening onsite as well. The extent of invasive  species coverage will be monitored, mapped, and controlled as necessary throughout the required  monitoring period. Additional monitoring and maintenance issues regarding vegetation are in Sections  8, 9, and 10 and in Appendix 5.  6.9 Project Risk and Uncertainties  There are no utilities within the project area that require outside maintenance. The streams have been  designed to prevent erosion and headcuts within the stream channel. The stream promotes movement  of sediment through the system from unforeseen inputs or changes within the watershed. As this is a  sandbed system, sediment pulses are expected to move through the system and may periodically  inundate stream channels. This may occur during large storm events (i.e., hurricanes). Channels are  expected to flush out this sediment and reform during subsequent storm events.   The Site is located in a rural watershed where the dominant land uses are agriculture, forest, and  residential. The project parcels and several surrounding project parcels are located in a Voluntary  Agricultural District, according to Johnston County zoning maps. There are currently no developmental  pressures in the area that suggest future changes in land use that might alter the watershed and/or add  stressors to the project.  The easement area will be clearly marked with easement markers along all sides according to standards.  The area of easement along adjacent active grazing pasture will be fenced to exclude cattle access. If  areas not fenced show signs of encroachment or an area is deemed high risk for encroachment, the  easement will be marked with high visibility horse tape between the easement signs. Coordination with  adjacent landowners ahead of project construction will determine if extra marking is necessary to aid in  their agricultural activities. For example, if tall growing crops are planted, six‐foot PVC may be installed  along that boundary.  The streams have been designed to avoid hydrologic trespass on neighboring properties. There is  potential for beaver to move into the Site after construction. If the presence of beaver is identified  onsite, beaver will be trapped and removed from the Site.   Potential maintenance activities that address these risk and uncertainties are located in Appendix 5 –  Maintenance Plan, and Section 10.2 – Long Term Management Activities.  7.0 Determination of Credits  The final stream credits associated with the Site are listed in Table 17. Stream restoration is at a  proposed credit ratio of 1:1. Enhancement II is at a proposed credit ratio of 2.5:1. All riparian buffers are  the required minimum of 50 feet, with most extending beyond the required 50 feet in width to  incorporate riparian wetlands. Wetland re‐establishment and rehabilitation in pasture and wooded  areas containing dense Chinese privet are proposed at credit ratios of 1:1 and 1.5:1, respectively. Within  the forested, cattle‐accessed middle third of the project area, re‐establishment is proposed at credit  ratio of 1.25:1 and rehabilitation at 2:1. All wetland enhancement occurs in the pasture portion of the  Site and is proposed at a 2:1 credit ratio.    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 32 June 2023  Table 18: Project Assets and Credits  Project  Segment  Existing  Footage  or  Acreage  Mitigation  Plan  Footage or  Acreage  Mitigation  Category  Restoration  Level  Priority  Level  Mitigation  Ratio (:1) Comments  East Mingo  Creek Reach 1 3,705 3,837 Warm R 1 1  Full channel restoration,  planted buffer,  permanent conservation  easement  East Mingo  Creek Reach 2 1,167 1,167 Warm EII ‐ 2.5  Cattle exclusion, planted  buffer, permanent  conservation easement  Lizard Creek 83 170 Warm R 1 1  Full channel restoration,  planted buffer,  permanent conservation  easement  Cricket Creek  Reach 1 77 70 Warm EII ‐ 2.5  Cattle exclusion, planted  buffer, permanent  conservation easement  Cricket Creek  Reach 2 ‐ 80 Warm R 1 1  Cattle exclusion, full  channel restoration,  planted buffer,  permanent conservation  easement  Snake Creek  Reach 1 254 250 Warm EII ‐ 2.5  Permanent conservation  easement, cattle  Exclusion  Snake Creek  Reach 2 91 62 Warm R 1 1  Full channel restoration,  planted buffer,  permanent conservation  easement  Deer Creek  Reach 1 241 196 Warm EII ‐ 2.5  Permanent conservation  easement, cattle  exclusion  Deer Creek  Reach 2 125 270 Warm R 1 1  Full channel restoration,  planted buffer,  permanent conservation  easement, cattle  exclusion  Snake Creek  Anabranch 467 250 Warm EII (Not for  Credit) ‐  ‐  Planted buffer,  permanent conservation  easement, cattle  exclusion  Mouse Creek  Reach 1 267 267 Warm EII ‐ 2.5  Permanent conservation  easement, cattle  exclusion  Mouse Creek  Reach 2 134 203 Warm R 1 1  Full channel restoration,  planted buffer,  permanent conservation  easement, cattle  exclusion    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 33 June 2023  Project  Segment  Existing  Footage  or  Acreage  Mitigation  Plan  Footage or  Acreage  Mitigation  Category  Restoration  Level  Priority  Level  Mitigation  Ratio (:1) Comments  Rabbit Creek  Reach 1 228 226 Warm EII ‐ 2.5  Permanent conservation  easement, cattle  exclusion  Rabbit Creek  Reach 2 205 267 Warm R 1 1  Full channel restoration,  planted buffer,  permanent conservation  easement, cattle  exclusion  UT to Rabbit  Creek 27 22 Warm EII ‐ 2.5  Planted buffer,  permanent conservation  easement, cattle  exclusion  Wolf Creek 403 417 Warm EII ‐ 2.5  Planted buffer,  permanent conservation  easement, cattle  exclusion  Lamb Creek  Reach 1 402 268 Warm  EII  (Headwater  Guidance)   ‐ 2.5  Permanent conservation  easement, cattle  exclusion  Lamb Creek  Reach 2 308 361 Warm R 1 1  Full channel restoration,  planted buffer,  permanent conservation  easement, cattle  exclusion  Cow Creek 308 302 Warm EII ‐ 2.5  Planted buffer,  permanent conservation  easement, cattle  exclusion  Beaver Creek 318 375 Warm R 1 & 2 1  Planted buffer,  permanent conservation  easement, cattle  exclusion  UT to Beaver  Creek 94 81 Warm R 1 1  Full channel restoration,  planted buffer,  permanent conservation  easement, cattle  exclusion  Wetland Re‐ establishment  1:1  N/A 8.235 Riverine R N/A 1:1  Raise stream channel,  planted buffer, cattle  exclusion, permanent  conservation easement  Wetland Re‐ establishment  1.25:1  N/A 8.408 Riverine R N/A 1.25:1  Raise stream channel,  cattle exclusion,  permanent conservation  easement    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 34 June 2023  Project  Segment  Existing  Footage  or  Acreage  Mitigation  Plan  Footage or  Acreage  Mitigation  Category  Restoration  Level  Priority  Level  Mitigation  Ratio (:1) Comments  Wetland  Rehabilitation  1.5:1  2.668 2.668 Riverine R N/A 1.5:1  Treat invasive species,  planted buffer,  permanent conservation  easement  Wetland  Rehabilitation  2:1  1.506 1.506 Riverine R N/A 2:1  Cattle exclusion,  permanent conservation  easement  Wetland  Enhancement  2:1  10.087 10.087 Riverine RE N/A 2:1  Planted buffer, cattle  exclusion, permanent  conservation easement    Restoration Level Stream Riparian Wetland Non‐Rip.  Wetland  Coastal  Marsh Warm Cool Cold Riverine Non‐Riv.  Restoration 5,706 ‐  ‐        Re‐Establishment       14.961 ‐  ‐  ‐  Rehabilitation       2.532 ‐  ‐  ‐  Enhancement       5.044 ‐  ‐  ‐  Enhancement I   ‐   ‐  ‐         Enhancement II 1,274    ‐  ‐         Creation        ‐  ‐   ‐   ‐  Preservation   ‐  ‐   ‐         Additional Credit  From Extended  Buffers  ‐   ‐  ‐         2% Benthic Credit  Adjustment 86.076 ‐  ‐      TOTAL 7,066.076  ‐  ‐  22.537  ‐  ‐    ‐  8.0 Performance Standards  The stream performance standards for the project will follow approved performance standards  presented in North Carolina Interagency Review Team’s (NCIRT) Monitoring Requirements and  Performance Standards for Compensatory Mitigation in North Carolina (February 2013) and the  Wilmington District Stream and Wetland Compensatory Mitigation Update (NCIRT, October 2016).  Annual monitoring and routine site visits will be conducted to assess the condition of the finished  project by a qualified scientist. Specific performance standards that apply to this project are those  described in the 2016 Compensatory Mitigation Update including Vegetation (Section V, B, Items 1  through 3) and Stream Channel Stability and Stream Hydrology Performance Standards (Section VI, B,  Items 1 through 7). Table 18 summarizes performance standards.  Wildlands proposes growing season dates for wetland hydrology monitoring be March 1st through  November 16th. The growing season for wetland hydrology monitoring will occur during these same  dates each monitoring year. March 1st is proposed as the start date based on observations of soil  temperature exceeding 41 degrees Fahrenheit and bud burst occurring prior to March 1st at numerous    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 35 June 2023  mitigation sites in Johnston and surrounding counties. The NRCS WETS table approximates the growing  season end date as November 16th. Wildlands visually estimated site‐scale leaf color change as a proxy  for leaf senescence. Leaf senescence is primarily controlled by photoperiod, modified by environmental  factors, varies with species, and occurs over a period of several weeks making it difficult to identify a  single date to correlate with the growing season end. The senescence process begins prior to visible  color change; however, color change is readily observable and requires no laboratory procedures or  special equipment (Gill et al. 2015, Mariën et al. 2019). Based on this information, Wildlands  implemented the approach of assuming leaf senescence is occurring on a given site when 50% of the  leaves across that site have changed color. This threshold was generally reached during mid to late  October of 2022 for observed locations in the North Carolina inner coastal plain, which supports the  conclusion that the growing season has ended by November 16. Leaf Senescence was not directly  observed at the East Mingo Mitigation Site. Photo documentation of bud burst, leaf senescence, soil  temperature data, and the WETS table referenced in this section are included in Appendix 1. The  proposed wetland hydroperiod criterion is 12% which is within the hydroperiod range for the Bibb soil  series presented in Table 1 of the Wilmington District Stream and Wetland Compensatory Mitigation  Update (2016).  Table 19: Summary of Performance Standards  Parameter Monitoring Feature Performance Standard  Dimension Cross‐Section Survey  BHR <1.2; ER >2.2 for Restored C/E channels  Enhancement II channels maintain stream channel  geomorphological characteristics; no standards for specific  geomorphological parameter values.  Pattern and Profile Visual Assessment Should indicate stream stability  Photo  Documentation   Cross‐Section Photos   Photo Points   Crossing Photos  No excessive erosion or degradation of banks  No mid‐channel bars, Stable grade control  Crossing photos will be taken at all internal crossings  Hydrology Transducer  Four bankfull events during the 7‐year period in separate years  on East Mingo Creek  30 consecutive days of flow on Lizard Creek, Cricket Creek R1,  Deer Creek R1, Mouse Creek R1, Rabbit Creek R1, Wolf Creek,  Beaver Creek, and UT to Beaver Creek.  Vegetation  (Wetland Planting  Zones, 84% of total  planting area)  Vegetation Plots  MY3 success criteria: 320 planted stems per acre,  MY5 success criteria: 260 planted stems per acre, average of 7  feet in height in each plot. Subcanopy and shrub species will be  disregarded for average height calculations.  MY7 success criteria: 210 planted stems per acre, average of 10  feet in height in each plot. Subcanopy and shrub species will be  disregarded for average height calculations.  Minimum of 4 native species with no single species comprising  more than 50% of stems.  Vegetation (Long  Term Ponded  Areas, 16% of total  planting area)  Vegetation Plots  MY3 success criteria: 265 planted stems per acre  MY5 success criteria: 220 planted stems per acre  MY7 success criteria: 180 planted stems per acre averaging 5  feet in height. 60% herbaceous vegetation coverage or canopy  formed by woody stems.  Wetlands Groundwater Well  Water table within 12 inches of the soil surface for a  consecutive 12% of the growing season (260 consecutive  days). Proposed growing season dates are March 1 through  November 16.    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 36 June 2023  Invasive Species Visual Assessment and  GPS mapping  Invasives cover no more than 5% of the area within the  conservation easement, no kudzu.  Visual Assessment CCPV Signs of encroachment, stream instability, invasive species.    Changes in the channel that indicate a movement toward stability or enhanced habitat include a  decrease in the width‐to‐depth ratio in meandering channels or an increase in pool depth. It is  important to note that pools and bed forms (ripples, dunes, etc.) in sand bed channels may migrate over  time as a natural function of the channel hydraulics. It is also of note that sand bed streams are highly  mobile and movement of the bed material during storm events is not considered a sign of instability.  This could lead to changes in pool depth from storm to storm. These sorts of bed changes do not  constitute a problem or indicate a need for remedial actions. If channel changes indicate a movement  toward stability, remedial action will not be taken. Sand bed streams do not require substrate  monitoring so no pebble counts will be conducted.  Exotic invasive vegetation will be mapped, photographed, and visually assessed annually. Exotic invasive  species will be treated by mechanical and chemical methods so that exotic invasive species percent  coverage does not exceed 5% of the total easement acreage and that there is no presence of kudzu. All  herbicide applications will be performed in accordance with the product label and NC Department of  Agriculture rules and regulations. Benthic data will be calculated but no performance standard will be  defined.  9.0 Monitoring Plan   The Site monitoring plan has been developed to ensure that the required performance standards are  met, and project goals and objectives are achieved.   Project monitoring components are listed in more detail in Table 19. Approximate locations of the  proposed monitoring components are illustrated in Figure 11. Vegetation Plots will cover 2% of the  planted area. In existing forested areas, planting plan areas are approximations based on the limits of  disturbance (LOD). The number of vegetation plots provided in Table 19 assumes that the entire LOD  will be planted. Typically, the entire LOD is not actually disturbed in existing forests and planting the  entire LOD is not required. Wildlands proposes adjusting the number of vegetation plots to sample 2%  of the actual planted area. The actual planted area will be reported in the MY0 report.  Benthic macroinvertebrate sampling will be conducted throughout the lifespan of the project but will  not be tied to performance criteria. Two sampling locations along East Mingo Creek Reach 1 and 2 will  be sampled during pre‐construction, MY3, MY5, and MY7. Sampling will follow the Standard Operating  Procedures for the Collection and Analysis of Benthic Macroinvertebrates (NCDWR, 2016).  Table 20: Monitoring Components   Parameter Monitoring Feature  Quantity by Approach  Frequency Notes  Restoration Enhancement II  Dimension Riffle Cross Sections 8 2 Year 1, 2, 3,  5, and 7 1, 2 Pool Cross Sections 3 N/A  Pattern Pattern N/A N/A 3 Profile Longitudinal Profile N/A N/A  Hydrology Stream Gauge 1 Crest Gauge  3 Flow Gauges 5 Flow Gauges Quarterly 4    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 37 June 2023  Vegetation 100 m2 Plot 18 Fixed, 6 Random Year 1, 2, 3,  5, and 7 5  Wetlands Groundwater Well 14  6  Visual  Assessment  1 Semi‐Annual 7  Benthic  Macro‐ Invertebrates  Qual 4 Sampling 1 1 Pre‐Con, Year  3, 5, and 7 8  Reference  Photos  Stream Photographs 33 Annual   Crossing Photographs 2  1. Cross sections will be permanently marked with rebar to establish location. Surveys will include points measured at  all breaks in slope, including top of bank, bankfull, edge of water, and thalweg.  2. Entrenchment ratios will be monitored but not provided in annual monitoring reports unless requested.  3. Pattern and profile will be assessed visually during semi‐annual site visits. Longitudinal profile will be collected  during as‐built baseline monitoring survey only, unless observations indicate lack of stability and profile survey is  warranted in additional years. Project streams are sand bed systems; thus, riffles and pools may vary over time.  4. Stream gauges will be inspected and downloaded quarterly. Transducers will be set to record stage once every 2  hours.  5. Vegetation monitoring will follow an IRT approved protocol. The number of vegetation plots was calculated based  on sampling 2% of the anticipated planting area. If the construction disturbance footprint impacts less existing  forest than expected, the actual planting area may be reduced, and the number of vegetation plots may be  adjusted to sample 2% of the actual planted area.  6. Wetland gauges will be inspected and downloaded quarterly. Transducers will be set to record stage once every 6  hours.  7. Locations of exotic and nuisance vegetation along with locations of vegetation damage or boundary  encroachments will be mapped.  8. Benthic sampling will follow the Standard Operating Procedures for the Collection and Analysis of Benthic  Macroinvertebrates (NCDWR, 2016). Sampling will not be tied to performance standards or success criteria. The  2% benthic credit adjustment will be released upon completion of benthic sampling.    10.0 Long‐Term Management Plan  Ownership and Long‐Term Manager  The Site will remain in private ownership (see Appendix 7), protected in its entirety, and managed under  the terms detailed in the conservation easement. Unique Places to Save (UP2Save) will serve as the  Grantee and long‐term manager and will be the party responsible for long‐term management. The  conservation easement will be transferred to UP2Save prior to the initial credit release.  UP2Save is a 501c3 non‐profit organization that is committed to land conservation through sustainable  planning and management. UP2Save has the ability, both logistically and financially, to monitor and  enforce the provisions of the conservation easement and long‐term management plan. The organization  operates in a sustainable manner to facilitate operations well into the future. UP2Save has been  approved to serve as the easement holder and long‐term manager on several mitigation banks in North  Carolina, including Falling Creek Mitigation Site and Box Creek projects. Additional qualifications and  UP2Save’s annual report can be provided upon request.  Long‐Term Management Activities  Prior to the initial credit release and following authorization of the Mitigation Banking Instrument, the  Site will be protected in perpetuity with a conservation easement. Following the issuance of the close‐ out letter (i.e., final determination of success), long‐term management activities will be conducted to  ensure the Site remains perpetually monitored. The long‐term manager will be responsible for  inspecting the Site annually, conducting the long‐term management activities described below, and  rectifying identified deficiencies as necessary. The restrictions and long‐term management    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 38 June 2023  responsibilities will convey with the land, should the property be transferred in the future. The long‐ term manager will be responsible for periodic inspection of the Site to ensure that the restrictions  documented in the recorded easement are upheld.   Table 21: Long‐Term Management   Long‐Term  Management Activity Long‐Term Manager Responsibility Landowner Responsibility  Signage will be installed  and maintained along  the Site boundary to  denote the area  protected by the  recorded conservation  easement.  The long‐term steward will be  responsible for inspecting the Site  boundary and for maintaining or  replacing signage to ensure that the  conservation easement area is clearly  marked.  The landowner shall report damaged or  missing signs to the long‐term manager,  as well as contact the long‐term manager  if a boundary needs to be marked, or  clarification is needed regarding a  boundary location. If land use changes in  future and fencing is required to protect  the easement, the landowner is  responsible for installing appropriate  approved fencing.  Internal easement ford  crossings will be  maintained for  continued stability.  The long‐term steward will be  responsible for inspecting the internal  easement ford crossings and reporting  any stability concerns and/or  maintenance needs to the landowner.  The landowner is responsible for taking  any remedial action regarding crossing  maintenance needs identified by the long‐ term steward.  The Site will be  protected in its entirety  and managed under the  terms outlined in the  recorded conservation  easement.  The long‐term manager will be  responsible for conducting annual  inspections and for undertaking actions  that are reasonably calculated to swiftly  correct the conditions constituting a  breach. The USACE, and their  authorized agents, shall have the right  to enter and inspect the Site and to take  actions necessary to verify compliance  with the conservation easement.  The landowner shall contact the long‐term  manager if clarification is needed  regarding the restrictions associated with  the recorded conservation easement.  Funding Mechanism  Anticipated long‐term management activities and their associated annual cost are listed in Table 21,  below. Wildlands will fund a stewardship endowment that will be managed by UP2Save. UP2Save’s  endowment is designated to provide on‐going revenue to support long‐term management activities. The  stewardship endowment is invested to provide recurring revenue to cover the cost of anticipated annual  activities, easement defense, and violation resolution.  The level of effort for each activity is listed in hours or as a lump sum (LS). The cost per unit or labor rate  and anticipated frequency were utilized to calculate the total and annual activity cost. A conservative  (lower than anticipated) rate of return (or capitalization rate) of 3.50% and the estimated annual costs  of the identified management activities were utilized to determine the endowment funding  requirement.       East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 39 June 2023  Table 22: Management Funding  Management Activity Units Hours Cost/Unit Frequency Annual Cost  Annual Monitoring  Staff time for annual planning 44.75  ac 11 $65.00 Annual $715.00  Staff time to address minor violations or issues N/A 10 $650.00 Once per 10  years $65.00   Mileage 100 N/A $0.59 Annual $58.50   Lodging costs 0 N/A $100.00 Annual $0.00  Meal costs 1 N/A $20.00 Annual $20.00  Sign replacement costs 10 N/A $2.00 Annual $20.00  Insurance 1 N/A $100.00 N/A $100.00  Total Annual Funding $840.92  Capitalization Rate 3.50%  Monitoring Endowment $24,026.29  Accepting and Defending Easement in Perpetuity   Staff time for major violations N/A 80 $65.00 N/A $5,200.00  Legal Counsel N/A N/A N/A N/A $10,000.00  Other Incidentals N/A N/A N/A N/A $5,000.00   Stewardship Complexities 1 N/A $5,000 N/A $5,000.00    Monitoring Endowment $25,200.00    Total Monitoring and Legal  Defense Endowment $53,157.14   Rounded $53,157.00    Contingency Plan  Should UP2Save be unable to fulfill the long‐term management responsibilities, a plan to transfer the  responsibilities and stewardship endowment will be presented to the USACE. Long‐term management  responsibilities will not be transferred unless the long‐term manager receives written authorization  from the USACE.  11.0 Adaptive Management Plan  Upon completion of Site construction, Wildlands will implement the post‐construction monitoring  protocols and minor remedial actions (routine maintenance) will be performed as needed for the  duration of the monitoring period. Wildlands, as the Sponsor, will notify the USACE immediately if  monitoring results or visual observations suggest a trend towards instability, major remedial actions are  needed, or that performance standards cannot be achieved. Should major remedial measures be  required, the Sponsor will submit a Corrective Action Plan and coordinate with the USACE until    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 40 June 2023  authorization is secured to conduct the adaptive management activities. The Bank Sponsor is  responsible for funding and/or providing the services necessary to secure any necessary permits to  support the proposed major remedial adaptive management actions, to implement the corrective action  plan, and to deliver record drawings that depict the extent and nature of the work performed. If the  USACE determines that the Bank is not meeting performance standards or the Sponsor is not complying  with the terms of the instrument, the USACE may take appropriate actions, including but not limited to:  suspending credit sales, utilizing financial assurances, and/or terminating the instrument.  12.0 Financial Assurances  Financial assurances will be provided in the form of a Performance Bond for the activities specified in this  plan. The Performance Bond will assure the construction to restore, enhance and/or preserve the  projected aquatic resources. The bond amount will be based on Table 22 below.   Wildlands Holdings VI, LLC (Sponsor) will serve as the Principal, Travelers Casualty and Surety Company  of America (Travelers) will serve as the Surety, and Unique Places 2 Save will serve as the Obligee. As  stipulated in the Performance Bond, the Sponsor shall promptly and faithfully perform the Contract,  according to the terms, stipulations or conditions included in the MBI. However, In the event that the  Sponsor fails to meet the conditions of the Mitigation Plan, Travelers may fulfill these obligations either  by performing those obligations up to the applicable bond amount, or by paying such bond amount to  Unique Places 2 Save who would develop a proposal to fulfill the mitigation obligations.  The Performance Bond will be retired upon approval of the final as‐built report by the DE. Following  retirement of the Performance Bond, a Monitoring Bond will be issued by Travelers, to the Sponsor,  with the UP2Save as the Obligee, to cover anticipated monitoring and adaptive management costs. The  Monitoring Bond will be structured to provide continuous coverage that will decrease in value each year  according to Table 22. An annual Monitoring Bond renewal will be submitted to the USACE upon  approval of each previous year’s monitoring report. The principal amount of the Monitoring Bond is  calculated based on the total estimated costs that remains through closeout, including monitoring and  maintenance activities. Table 22 lists the proposed Monitoring Bond amounts for each monitoring year.        East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 41 June 2023  Table 23: Financial Assurances Table  Category 2022‐2024 2025 2026 2027 2028 2029 2030 2031  Engineering $48,000                        Legal $7,500                        Construction $780,900                        Planting $55,000                        As‐Built $16,000                        Monitoring ‐ $16,000  $16,800  $17,640  $18,522  $19,448  $20,421  $21,442   Re‐Grading  Contingency ‐ $0  $0  $8,000  $0  $0  $0  $8,000   Re‐Planting  Contingency ‐ $1,200  $1,200  $1,200  $1,200  $0  $0  $0   Beaver Control ‐ $0  $0  $1,500  $1,500  $1,500  $1,500  $1,500   Invasive  Treatment ‐ $5,000  $5,000  $0  $2,000  $0  $2,000  $2,000   Easement  Access Control ‐ $750  $750  $750  $750  $750  $750  $750   Corps Admin  Costs $21,744  $3,596  $3,137  $2,662  $2,081  $1,601  $1,167  $674   Sub‐Total $929,144  $26,546  $26,887  $31,752  $26,053  $23,299  $25,838  $34,365   Insurance  Principal $929,144  $194,741  $168,195  $141,307  $109,555  $83,502  $60,203  $34,365     Monitoring Phase Insurance         East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 42 June 2023  13.0 References  Conner, William, et al. 2004. Recognizing and Overcoming Difficult Site Conditions for Afforestation of  Bottomland Hardwoods. Ecological Restoration. 22(3): 183‐193.  Doll, Barbara et. al. 2003. Hydraulic Geometry Relationships for Rural North Carolina Coastal Plain  Streams. NC Stream Restoration Institute, Report to NC Division of Water Quality for 319 Grant Project  No. EW20011.   Gill, Allison L., A.S. Gallinat, R. Sanders‐DeMott, A.J. Rigden, D.J. Short Gianotti, J.A. Mantooth, and P.H.  Templer. 2015. Changes in autumn senescence in northern hemisphere deciduous trees: a meta‐ analysis of autumn phenology studies. Annals of Botany 116:875‐888  Hall, S., and T. Howard. 2022. Habitats of North Carolina [Internet]. Raleigh (NC): North Carolina  Biodiversity Project and North Carolina State Parks. Available from:  https://auth1.dpr.ncparks.gov/habitat/index.php.  Mariën, Bertold, M. Balzarolo, I. Dox, S. Leys, M.J. Loréne, C. Geron, M. Portillo‐Estrada, H. AbdElgawad,  H. Asard, and M. Campioli. 2019. Detecting the onset of autumn leaf senescence in deciduous forest  trees of the temperate zone. New Phytologist 224:166‐176  Natural Resources Conservation Service (NRCS), 2011. Web Soil Survey.  http://websoilsurvey.nrcs.usda.gov/app/HomePage.htm  North Carolina Division of Water Resources (NCDWR). 2016. Standard Operating Procedures for  Collection and Analysis of Benthic Macroinvertebrates (Version 5.0).   North Carolina Division of Water Quality (NCDWQ). 2005. Cape Fear River Basinwide Water Quality Plan.  North Carolina Division of Water Quality (NCDWQ). 2011. Surface Water Classifications.  http://portal.ncdenr.org/web/wq/ps/csu/classifications  North Carolina Geological Survey (NCGS), 1985, Geologic Map of North Carolina: Raleigh, North Carolina  Department of Natural Resources and Community Development, Geological Survey Section, scale  1:500,00, in color.  North Carolina Interagency Review Team (NCIRT), 2013. Monitoring Requirements and Performance   Standards for Compensatory Mitigation in North Carolina.  North Carolina Interagency Review Team (NCIRT), 2016. Wilmington District Stream and Wetland   Compensatory Mitigation Update.   North Carolina Wetland Assessment Method. 2016. Prepared by North Carolina Wetland Functional  Assessment Team. Accessed at:  https://files.nc.gov/ncdeq/Water%20Quality/Environmental%20Sciences/ECO/Wetlands/NC%20WAM %20User%20Man20v5.pdf  Rosgen, D. L. 1994. A classification of natural rivers. Catena 22:169‐199.  Rosgen, D.L. 2001. A stream channel stability assessment methodology. Proceedings of the Federal  Interagency Sediment Conference, Reno, NV, March 2001.  Schafale, M. 2012. Classification of the Natural Communities of North Carolina: Fourth Approximation.  North Carolina Natural Heritage Program.  Shields, D. F., Copeland, R. R, Klingman, P. C., Doyle, M. W., and Simon, A. 2003. Design for Stream  Restoration. Journal of Hydraulic Engineering 129(8):  575‐582.    East Mingo Creek Mitigation Site  Final Mitigation Plan   Page 43 June 2023  United States Army Corps of Engineers. 2005. Information Regarding Stream Restoration With Emphasis  on the Coastal Plain. US Army Corps of Engineers, Wilmington District, Regulatory Division And North  Carolina Department of Environment and Natural Resources, Division of Water Quality. Accessed at:  https://files.nc.gov/ncdeq/Water%20Quality/Surface%20Water%20Protection/401/Public%20Notices /PN_12_05_CoastalPlainSTreamMitigationFinalDraftPolicyNov28.pdf  United States Army Corps of Engineers Routine On‐Site Determination Method presented in the 1987  Corps of Engineers Delineation Manual, the subsequent Atlantic and Gulf Coastal Plain guidance  Sohl, Norman E., and James P. Owens. “Cretaceous Stratigraphy of the Carolina Coastal Plain.” The  Geology of the Carolinas: Carolina Geological Society Fiftieth Anniversary Volume, edited by J. Wright.  Horton and Victor A. Zullo, University of Tennessee Press, 1991, pp. 191–220.Simon, A. 1989. A model  of channel response in disturbed alluvial channels. Earth Surface Processes and Landforms 14(1):11‐ 26.  North Carolina Geological Survey (NCGS), 2016. Mineral Resources.  http://deq.nc.gov/about/divisions/energy‐mineral‐land‐resources/north‐carolina‐geological‐ survey/ncgs‐maps/1985‐geologic‐map‐of‐nc, North Carolina Geological Survey (NCGS), 1985. Geologic  map of North Carolina 1:500,000 scale.