Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8040836_Historical File_20160104
PAT MCCRORY Governor DONALD R. VAN DER VAART Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY January 4, 2016 Julie Wilsey, Airport Director New Hanover County Airport Authority 1740 Airport Boulevard Wilmington, NC 28405 Subject: Updated Master Plan BUA Table Wilmington International Airport State Stormwater Management Permit No. SW8 040836 New Hanover County Dear Ms. Wilsey: secretary TRACY DAVIS Director On September 9, 2015, the Wilmington Regional Office approved a plan revision for the Extended Dry Detention Basin #1 permitted under SW8 050647. All of the built -upon area approved under that permit has been accounted for in the Master Plan permit, as indicated in the attached updated Master Plan BUA Table for SW8 040836. The remaining overall amount of built -upon area within the Master Plan is 2,991,489 square feet. Please be aware that all terms and conditions of the permit issued on November 29, 2012, and all of the previously approved plan revisions, remain in full force and effect. Please also understand that the approval of this updated Master Plan BUA Table for the subject State Stormwater Permit is done on a case -by -case basis. Any other changes to this project must be approved through this Office prior to construction. The approval of the updated Master Plan BUA Table does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. If you have any questions concerning this matter, please do not hesitate to call me at (910) 796-7215. Sincerely, /,*�, 06CA...) eY-.1" Linda Lewis, E.I. Environmental Engineer III GDS1arl: G:1WQ1SharedlStormwaterlPermits & Projects120041040836 HD12016 01 permit-pr 040836 cc: Jeremy Blair, P.E., Paramounte Engineering New Hanover County Building Inspections Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 127 Cardinal Drive Extension I Wihnington, NC 28405 910 7% 7215 T 1 910 350 2004 F I httn://oortal.ncdenr.ora/web/lr/ SW8 040836 MASTER TABLE Originally issued November 24, 2004 Last updated 9/9/2015 Total Site Area 1620.8 30% Overall BUA Max. 486.2 Existing BLJA as of November 24, 2004 260.6 Remaining BUA as of update date 187.675 8175123 Extended Dry Detention Basin (EDDB #1) Ph 1 & 2 Max BUA = 8520835 Remaining BUA= 2991489 Master Plan BUA EDDB #1 Permit # Date Project name BUA Added Cumulative BUA Added Cumulative SW8 040836 11/24/2004 Master - existing BUA 260.6 4552087 SW8 040918 11/24/2004 Perimeter Road Ph. 1 2 262.6 SW8 040926 10/15/2004 GA Apron Rehab 0 262.6 SW8 991003 12/30/2004 T-Hangars 0.38 262.98 SW8 050547 6/15/2005 EDDB #1 0 262.98 SW8 050801 8/12/2005 GA Apron Expansion 1.45 264.43 151589 4703676 SW8 060326 4/7/2006 Air Wilmington FBO Building 4.52 268.95 196725 4900401 SW8 060425 4/27/2006 Runway 6-24 Rehab 0 268.95 0 4900401 SW8 060515 5/18/2006 Terminal Parking Lots 4.63 273.58 201655 5102056 SW8 040836 8/31/2006 Runway 6-24 ILS 1.56 275.14 0 5102056 SW8 040918 7/18/2007 Perimeter Road Ph. II 4.08 279.22 0 5102056 SW8 060515 5/14/2008 Credit Card Parking Lots 5.18 284.4 225722 5327778 SW8 040836 12/19/2008 Temporary Concrete Batch Plant 0.85 285.25 0 5327778 SW8 050547 10/28/2009 EDDB #1 Expansion 0 285.25 15843 5343621 SW8 040836 7/12/2010 35 MALSR Catwalk, 35 ILS, 6-24 PAPIS -0.11 285.14 0 5343621 SW8 040836 3/29/2011 Taxiway A, D, F and H Rehab -0.31 284.83 0 5343621 SW8 040836 1/9/2011 Remove Temp. Conc. Batch Plant -0.85 283.98 0 5943621 SW8 040836 12/9/2011 Taxiway B, C, J and G paved shoulders 7.74 291.72 0 5343621 SW8 040836 7/23/2022 Runway 17 and Taxiway A Extension 2.12 293.84 0 5343621 SW8 040836 8/6/2012 Security Fencing 0 293.84 0 5343621 SW8 040836 10/4/2012 Air Wilmington Hangar No. 3 0.41 294.25 0 5343621 SW8 050547 2/8/2013 Consolidated Rental Car Facility 4.71 298.96 205202 5548823 SW8 040836 6/11/2014 Runway 24 Wildlife Hazard & NAVAID 0 294.25 0 5343621 SW8 040836 8/4/2015 Apron Rehab 0.745 294.995 32453 5376074 SW8 050547 9/9/2015 ILM Flex Space 1.53 296.525 GRIM 5442586 SW8 050547 9/9/2015 Business Park Access Road 1.44 297.965 62570 5505156 SW8 IS0723 9/15/2015 Air Wilmington Hangar No. 4 0.56 298,525 24190 5529346 298.525 5529346 298.525 5529346 298.525 5529346 298.525 5529346 F DEMLR USE ONLY Date Received Fee Paid (express only) Permit ber State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW 8 040836 North General Aviation Apron Pavement Rehabilitation, Storm Water Improvements, 2. Project Name: and Apron Expansion (Schedules I. II. III. & V) 3. Permit Holder's name (specify the name of the corporation, individual, etc.): 4. Print Owner/Signing Official's name and title (person legally responsible for per v' Julie Wilsey, Airport Director JUN 10205 5. Mailing Address for person listed in item 2 above: BY.. 1740 Airport Boulevard City: Wilmington State: NC zip: 28405 Phone: ( 910 ) 341-4333 Fax: ( 910 ) 341-4365 Email:—JW!Isey@flyilm.com II. PLAN REVISION INFORMATION 1 _ Summarize the plan revision proposed (attach additional pages if needed): This proiect will remove 28,219 sf (0.65 ac) of existing impervious area and install 14,063 sf sf (0.32 ac), resulting a deduction of 14,156 sf (0.33 ac) covered under permit SW8-040836 See additional pages III. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. The complete application package should be submitted to the DEMLR Office that issued the permit. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original & 1 copy of the Plan Revision Application Form_ law • Two (2) copies of revised plans (must be revisions of original approved plan sheet(s)) mkI If applying for Express review (only available in 20 coastal counties): • Application fee of $500.00 (made payable to NCDENR) VI. APPLICANTS CERTIFICATION I, (print or type name of person listed in General Information, item 3) Julie Wilse� T certify that I have authorized these plan revisions and that the information included on this plan revision application ' , to a best of y knowledge, correct and complete. Signature: Date: 6 Ndof,5 Plan RevisioiYForm U Rev. Oct. 31, 2013 ¢o -93(2 Lewis,Linda From: Lewis,Linda Sent: Wednesday, August 26, 2015 3:49 PM To: 'Karen.CTR.Dorrell@faa.gov' Cc: JWilsey@flyilm.com; Barrington.CTR.Brown@faa.gov Subject: RE: Wilmington al-M) Airport Project and Master Stormwater Permit I don't understand. Regardless of the amount of disturbance, the Master permit for the airport (SW8 040836) tracks all of the constructed BUA to ensure that the overall low density aspect of the airport is maintained and to ensure that the proposed project is not within the drainage area of the permitted BMP's for the Airport. Was this road part of the recently approved August modification? If not, then it will need to be accounted for. Linda From: Karen.CTR.Dorrell@faa.gov [mailto:Karen.CTR.Dorrell@faa.gov] Sent: Wednesday, August 26, 2015 3:18 PM To: Lewis,Linda Cc: JWilsey@flyilm.com; Barrington.CTR.Brown@faa.gov Subject: RE: Wilmington (ILM) Airport Project and Master Stormwater Permit Iv13. Lcwls, The first phase of the. road has been paved and is complete. As stated below the soil disturbance .was less than an acre. At this time we still do not know if or when the second part of the road will be built. Due to funding and runway closure constraints, we are asking if we can delay the removal of the pavement (see red area in the attachment) to offset the new pavement until at least November 2015 or possibly spring 2016. The second phase of the road may be built in Spring 2016 so if possible the pavement could be removed at that time. Nevertheless, we do not want to impact the airport's existing permit and will remove the pavement as required. I have copied the project's project manager, Barrington Brown. Please advise as to how we should proceed. Thank you for your assistance, ��kA3 tires\f`�� Karen Dorrell Senior Environmental Engineer Parsons/T4 3800 Camp Creek Pkwy Building 2400, Suite 106 Atlanta, GA 30331 404-762-3586 404-559-1715fax 404-617-5229 cell From: Lewis,Linda fmailto:linda.lewis@ncdenr.gov] Sent: Friday, July 10, 2015 11:05 AM To: Dorrell, Karen CTR (FAA) Cc: Julie Wilsey Subject: RE: NPDES questions for upcoming Wilmington airport project Please talk to Julie Wilsey before you do anything. The Airport usually triages their permit applications depending on their need and funding availability, so it would be a good thing to make sure that this project fits into her upcoming permit submission schedule. I attach the permits and the most recent master tables for tracking the built -upon area, but they are currently both in review for an Apron Rehab/Expansion project, so the tables will be changing from what is currently on file. By law, we have 90 days from receipt of a complete application to issue a permit. Depending on the quality of the application materials, it may take less time than that. There is also an Express review process available for a larger fee that results in a permit within 30 days. However, if you have never done state stormwater permitting, you may not want to go that route. It requires quality submissions that are near 100% complete and allows only 2 addinfo request events (max 5 days turnaround for each) in order to issue a permit within the 30 day express time frame. The consultant and the owner must attend a submission meeting where the entire application, plans, and calculations are reviewed for completeness. The consultant must have a very good understanding of the applicable stormwater rules and requirements, or the $2000 or $4000 fee may be forfeited and the application will have to be resubmitted for review in the "regular" program. Linda From: Karen.CTR.Dorrellca�faa.gov fmailto:Karen.CTR.Dorrell(dfaa.gov] Sent: Friday, July 10, 2015 10:33 AM To: Lewis,Linda Subject: RE: NPDES questions for upcoming Wilmington airport project Ms. Lewis, Thanks so much for getting back to me so quickly. We should have plans in the next couple of weeks. I assume the plans need to be signed and sealed? I have reviewed the Stormwater Management Permit Application form. We will fill it out as a modification to the existing Master stormwater permit. Once the complete application is submitted about how long is the review process? Do we submit it to the DEMLR address below? How do I go about getting a copy of these two permits? Thanks again, Karen Dorrell Senior Environmental Engineer Parsons/T4 3800 Camp Creek Pkvuy Building 2400, Suite 106 Atlanta, GA 30331 404-762-3586 404-559-1715fax 404-617-5229 cell From: Lewis,Linda fmailto:linda.lewis(&ncdenr.gov] Sent: Friday, July 10, 2015 9:19 AM To: Dorrell, Karen CTR (FAA); Julie Wilsey Cc: Scott, Georgette; Gregson, Jim Subject: RE: NPDES questions for upcoming Wilmington airport project Ms. Dorrell: Your email to Jim Gregson was forwarded to me. I'm not sure how helpful I will be, but here goes: The Wilmington Airport is currently covered by a Master stormwater permit, SW8 040836. This permit accounts for the overall low density of the airport and includes a high density component, an extended dry detention basin (EDDB) which is permitted under SW8 050547, to treat the runoff from the "collected" landside built -upon areas (BUA) of the airport. The runways and existing built -upon area on the airside are covered by the terms of SL 2012-200 (section c4), which I have copied below: PART VI. DIRECT THE DEPARTMENT OF ENVIRONMENT AND. NATURAL RESOURCES TO ACCEPT ALTERNATIVE MEASURES OF STORMWATER CONTROL AT PUBLIC AIRPORTS SECTION 6. G.S. 143-214.7 is amended by adding two new subsections to read: "(6) In accordance with the Federal Aviation Administration August 28, 2007, Advisory Circular No. 150/5200- 33B (Hazardous Wildlife Attractants on or Near Airports), the Department shall not require the use of stormwater retention ponds, stormwater detention ponds, or any other stormwater control measure that promotes standing water in order to comply with this section at public airports that support commercial air carriers or general aviation services. Development projects located within five statute miles from the farthest edge of an airport air operations area, as that term is defined in 14 C.F.R. § 153.3 (July 2011 Edition), shall not be required to use stonnwater retention ponds, stormwater detention ponds, or any other stormwater control measure that promotes standing water in order to comply with this section. Existing stormwater retention ponds, stormwater detention ponds, or any other stormwater control measure that promotes standing water in order to comply with this section located at public airports or that are within five statute miles from the farthest edge of an airport operations area may be replaced with alternative measures included in the Division of Water Quality's Best Management Practice Manual chapter on airports. In order to be approved by the Department, alternative measures or management designs that are not expressly included in the Division of Water Quality's Best Management Practice Manual shall provide for equal or better stormwater control based on the pre- and post -development hydrograph. Any replacement of existing stormwater retention ponds, stormwater detention ponds, or any other stormwater control measure that promotes standing water shall be considered a minor modification to the State general stormwater permit. (c4) The Department shall deem runways, taxiways, and any other areas that provide for overland stormwater flow that promote infiltration and treatment of stormwater into grassed buffers, shoulders, and grass swales permitted pursuant to the State post -construction stormwater requirements." Any cumulative disturbances within the airport which are greater than 1 acre, or any additions to the amount of BUA, or addition of BUA or changes within the permitted drainaee area of the extended dry detention basin, need to be reviewed for compliance with the Master stormwater plan and permit, the extended detention basin permit (SW8 050547) and/or the Session Law, depending on what the project is and where it is located within the airport. The master permit is currently set to expire on November 24, 2018. The SW8 050547 permit covering the EDDB will expire on June 15, 2019. An application for permit renewal must be submitted at least 180 days before the expiration date. If the road project were added to the permits, then even if the road was not built right away, it would continue to be "permitted" when the permit is renewed. We would support going ahead and getting all of the road work approved (both phases) as a modification to SW8 040836 and/or SW8 050547 and then wait for the funding to come through. We usually work with the permittee, Julie Wilsey, airport director, on all projects within the airport property. Ms. Wilsey has been copied on this email. All applications for development within the airport would need to be signed by the permittee of record. I sincerely hope that addresses your questions. If not, please feel free to email or call me — my contact information is below. Linda Linda Lewis, E.I. Environmental Engineer III Division of Energy, Mineral and Land Resources Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Main Office — 910-796-7215 Direct Line — 910-796-7343 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and maybe disclosed to third parties. From: Scott, Georgette Sent: Thursday, July 09, 2015 4:29 PM To: Lewis,Linda Subject: FW: NPDES questions for upcoming Wilmington airport project Linda, this was forwarded by Morelia. I know you handle most of the airport permits. Can you answer Karen? I believe she is talking state stormwater not NPDES Thanks Georgette From: Karen.CTR.DorreII(@faa.gov fmaiito:Karen.CTR.Dorrellaafaa.gov] Sent: Thursday, July 09, 2015 2:35 PM To: Gregson, Jim Cc: King, Morelia s Subject: NPDES questions for upcoming Wilmington airport project I have a few questions for upcoming FAA projects at the Wilmington airport. There is a road project that will be constructed probably in two phases. I am not sure about the schedule for the second phase. It could be late 2015, in 2016 or not at all. The first section of the road will have less than an acre of disturbance and is expected to start this summer. We do not have funding for the second phase at this. time. If we were to go ahead and submit the SW Mgmt Permit Application for the entire road how long is this stormwater permit valid? If we did do the project next year, would that be considered a separate project or should the disturbance be considered with the first Phase? We are just trying to decide if we should submit the permit app now and be ready for when we receive funding or just wait to see if we will receive funding at all. If I need to contact someone else to discuss these questions, please let me know. Thanks, Karen Dorrell Senior Environmental Engineer Parsons/T4 3800 Camp Creek Pkwy Building 2400, Suite 106 Atlanta, GA 30331 404-762-3586 404-559-1715fax 404-617-5229 cell 8 1 7 6 1 5 4 1 3 2 1 1 ----------- --- ------ --------------------------------------- ----- ---- �� Ir/ACCESS I EXISTING GRAVEL RUNWAY OBJECT FREE AREA (TYP) Fi \ i � ROAD -EXISTING STORM I I PIPE I jl — I I r1 I I REMOVE 1880 SF + + OF ASPHALT AND ����REf�'LAf2E WITH (;------I---SOD PER SPECS. / I 1 RUNWAY SAFETY AREA (TYP) F L C L � / I / / I FOR FUTURE ACCESS ROAD / I EXTENSION -REMOVE 5410 SF/ OF ASPHALT AND REPLACE WITH SOD PER SPECS I 1 1 I 1 1 LOCALIZER 1 1 i I CRITICAL AREA Ck 4. 1 i v 1 ! I I 2 1 i - ------------ L - - m -11 ------I- - - - - - 11 11 `a 1 FOR FUTURE ACCESS ROAD 1 •, EXTENSION - REMOVE 5390 SF 1 I `I OF ASPHALT AND REPLACE 11 �- ITH SOD PER SPECS I 1 I 1 I I I �I m REMOVE 1820 SF I�2��7a OF ASPHALT AND-- REPLACE WITH SOD PER SPECS.I 1 I I 1 I (SEE NOTE 7 1 3T EASEME I LOCALIZER CRITICAL AREA ------ -��EX ENDED �//- -- Q Wt� oV 0 F- 0 ow }w 0 W I' N 31n a ¢ Uw W REMOVE 5000 SF o V � GRAVEL a .I �OF Z U N,, c0. J ROADEL LOCALIZER CRITICAL AREA it .I �I II - - I I i ------ --- —-------- - --- PROPOSED REIL (SEE NOTE 7) i ---- RUNWAY SAFETY AREA (TYP)-`•-_ 25' R EN 30'[ASEM__--- OF ASPHALT SAIL' = ITA--= -_--- - - APPROX 375'TO - ppA1N RWY 06 THRESHOLD __________ `='l b �E ----- PTSIManaged Services Inc. 100'R _ — — — — — 3800 Camp Creek Pkwy I �7 — _---- ATCL — Building- 2400, Suite 106 Q ------ 190SF OBJECT......-.. r,REA (TYP) -i — _-CONSTRUCT--RUNWAY-. -- -- --- -- ._ ......... .... .... _ ..... -- -.. - Atlanta. GA 30331 X X L _ — _ OF CONCRETE 404.766.1693 X X PROPOSED REIL (BY OTHERS) 404.559.1715 (Fax) PCU RACK _ EXISTING (SEE NOTE 7) RELEASED FOR LOCALIZER SHELTER FINAL SUBMITTAL- 10/07/2014 AMENDED - 06-08-2015 NOT TO BE USED FOR PERMITTING, LEGEND A 1 ® DEMOLITION AND REMOVAL OF CONCRETE. 1 SITE PLAN \Q�Vi50, 0 50' 100, SCALE: 1" - 50' 7 6 5 -IT6 4 3 NOTES 1. FOR GENERAL NOTES. SEE DWG G004. 2. RUNWAY 06-24 THRESHOLD LATITUDE/LONGITUDE AND ELEVATIONS ARE BASED ON AMIS DATA SHEETS. 3. THE EXISTING SEWER FORCE MAIN SHALL BE LOCATED AND PROTECTED DURING CONSTRUCTION. 4. ALL CONDUITS AND CABLES SHOWN ARE APPROXIMATE. SUBCONTRACTOR TO VERIFY LOCATION ON SITE. 6. REMOVE EXISTING GRAVEL DRIVE THAT WILL BE UNUSED AFTER THE INSTALLATION OF THE NEW PAVED ACCESS ROAD. REESTABLISH DISTURBED AREA WITH SOD. 7. NEW REIL TO BE INSTALLED CONCURRENTLY WITH ACCESS ROAD PROJECT. SEE DRAWING SERIES ILM-D-906013 FOR REIL CONSTRUCTION PLANS. 8. IN ALL DISTURBED AREAS. INSTALL TOPSOIL TO RESTORE/ MATCH EXISTING GRADE AND SOD PER SPECIFICATION. 9. DIMENSIONS FROM CENTERLINE OF RUNWAY TO ACCESS ROAD ARE SHOWN AS A MINIMUM. THE ACCESS ROAD CAN BE ADJUSTED FURTHER AWAY FROM RUNWAY CENTERLINE IF NECESSARY TO ,KEEP GRADING OUT OF RSA. CONSTRUCT 27 SF \ OF CONCRETE (BY OTHERS) tt A tt CONSTRUCT 36 SF OF CONCRETE (BY OTHERS) I '-- RUNWAY 06 O THRESHOLD LAT, N 34" 15142.7932" LONG* W 77' 54137.1124" ELEV - 20.8 FT MSL —_\---61;a - — — — — — — — — — — — PD OEEO I DESORPTION I 'CN I RORTEE DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION - TECHNICAL OPERATIONS EASTERN SERVICE . LOC RUNWAY 24 SITE PLAN NILMINGTON WILMINGTON_ INTL AIRPORT ,,,,,BY BY SUBMIT�TEDBY� MPR/O/V-E/p1/ BY lJt{4I Cn =K nKfi= tnunGe In{i - l:Gn I Gn OATE RNED M ENGNEEPo GDSERVICES OR WING N0107/2O14 ' :KED LW NAVADS ILM-D-1001122-CO01 2 1 I 0 Casmer, Jo From: Casmer, Jo Sent: Tuesday, June 23, 2015 3:56 PM To: 'jwilsey@flyilm.com' Subject: Wilmington International Airport; Stormwater Permits SW8 0505047 and SW8 040836 The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) received the Stormwater Permit Plan Revision Applications on June 10, 2015. The projects have been assigned to Linda Lewis and you will be notified if additional information is needed. Jo Casmer Administrative Assistant for DEMLR/Stormwater Section NC Department of Environment & Natural Resources 127 Cardinal Drive Extension Wiimington, NC 28405 Phone: (910) 796-7336 Fax: (910) 350-2004 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and mwy be disdosed to third parties TALBERT & BRIGHT, INC. r ENGINEERING & PLANNING CONSULTANTS LETTER OF TRANSMITTAL To: NC Division of Water Quality 127 Cardinal Drive Ext Wilmington, NC 28405 WE ARE SENDING YOU: ❑ Shop Drawings ❑ Copy of Letter ® Attached ❑ Prints ❑ Change Order Date: 6/10/15 Pro'. No. 3301-1303 Attention: Linda Lewis Re: Wilmington International Airport North GA Apron Pavement Rehab & SW Impro Stormwater Permit Application Revisions — Permit No. SW8 040836 & SW8 050547 ❑ Under Separate Cover via ® Plans ❑ Other the following items: ❑ Specifications ITEM DATE NO. DESCRIPTION 1 Plan Revision Application Form no fee SW8 040836 (Original + One Co 2 Two Copies of Narrative with Impervious Calcs 2 Two Copies of Plan Sheets Al, A2, EX1-EX6, G1-G3, G10, & G11 1 Plan Revision Application Form no fee SW8 050547 (Original + One Co 2 Two Copies of Narrative with Impervious Calcs 2 Two Copies of Plan Sheets Al, A2, EX1-EX6, G1-G3, G10, & G11 THESE ARE TRANSMITTED, as checked below: ® For Approval ❑ No Exception taken ® For your Use ❑ Make Corrections Noted ❑ For Review and Comment ❑ Amend and Resubmit ❑ As Requested ❑ Rejected — See Remarks ❑ FOR BIDS DUE ON REMARKS ❑ Resubmit Copies for Approval ❑ Submit Copies for Distribution ❑ Return Corrected Prints ❑ Prints Returned After Loan to Us ❑ Other COPY To Julie Wilsey SIGNED Ray Marconi ENGINEERING & PLANNING CONSULTANTS 4810 Shelley Drive Wilmington, NC 28405 910.763.5350 FAX 910.762.6281 Completeness review Checklist eject Name: � Received Date: 0 Z-6 ��— P.Dject Location: b Accepted Date: a` ra Rule(s) El 2008 Coastal LJ1995 Coastal ®Phase II (WiRO.) LjUniversal 1988 Coastal (Type of Permit: New or Mod !4 PR ) IExcisting Permit # (Mod or PR): n Q ^q,7e j--jPE Certon File? Density: HD or LD Type: Commercial or Residential %: (% OK?) Stream Class: SA Map ,NCG: ite to SW8 ISUDdivided?: Subdivision or Single Lot 11 NORW Map I 8 Mxempt I Paperwork Emailed Engineer on: Supplements) (1 original per BMP) BMP Type(s): O&M with correct/original signatures (1 original per BMP except LS/VFS and swales) pplication with correct/original signatures Deed ®Corp or LLC: Sig, Auth. per SoS or letter Email Address: Design Engineer �$505 (within 6mo) Email Address: Owner Soils Report with SHWT '` `� � Hate to Revd ewer - Calculations (signed/sealed) No obvious errors' C� La-- iDensity includes common areas, etc Deed Restrictions, if subdivided: 3 l ei' �ed'�--•� ��`� 2a&4"'" Signed & Notarized Lj ELJLorreci i empaie ILOMMIKes & MULL)) or Uec. Lovenants & Rest: 11 _ ets Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) FFnGrading Wetlands: Delineated or No Wetlands Vicinity Map Eli Layout (proposed BUA dimensions) Legend Fl===EDA Maps [IProject Boundaries Crifiltration Wet Pond Offslte Soils Report ®Soils Report MPE Cert for Master SHWT: SHWT: Deed Rest for Master Bottom: PP: BUA Permitted (Master): Visited: BUA Proposed (Offsite): Additional information: Permitted Pd 000sed: BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) p v: po';e Lot #: rILot # Matches Master PronaN pd- sf sf North General Avation Apron Pavement Rehabilitation, Stormwater Improvements, and Apron Expansion project at Wilmington International Airport As previously discussed in the project scoping meeting on February 19, 2015, the airport is beginning the initial work necessary to be able to provide a second Fixed Base Operator (FBO) on the north side of the airfield. This project will allow for rehabilitation of some existing aircraft parking apron pavement and installation of drainage infrastructure to accommodate this future development. Project Narrative: Please seethe attached Exhibit 'Project Area Map' for the Items listed below: Item 1: The project will consist of rehabilitation of the existing 1940's era concrete aircraft parking apron. The rehabilitation effort will include construction of an overlay of the existing concrete pavement. This rehabilitation effort will also remove portions of existing pavement that will not be replaced, resulting in a decrease of the existing built upon area. The apron currently drains to inlets located within the pavement area and the collected stormwater is conveyed via drainage pipes to an existing ditch. Please see attached Exhibit 'A'showing the removal of the existing pavement. Item 4: As part of a bid alternative, the airport will be removing the existing hangar building where aircraft currently park. This bid alternative will remove the hangar slab and construct concrete pavement in the location of the existing concrete slab along with placing concrete pavement in the grassed areas east and west of the hangar for aircraft parking. The built upon area constructed in the existing grass area will be more than offset by the removal of existing concrete pavement located adjacent to and immediately west of the apron rehabilitation area. Drainage patterns from this apron area will not change and the apron area will drain to the same drainage ditch as it does today. As there is a decrease in BUA and the area will drain as it does historically to the same ditch, no new BMPs are proposed. Please see attached Exhibit 'A' showing the removal of the existing pavement and installation of new pavement. Items 2 & 5: Along the western edge of the apron, a new storm drain, system (Item 2 - shown in red) will be installed both to bring the apron into compliance with current National Fire Protection Association (NFPA) standards and to allow for filling of the ditch (Item 5) for redevelopment of the area between the apron and Trask Drive. Stormwater collected in the new drainage pipe (Item 2) will be conveyed to the existing ditch located north of the apron being rehabilitated. Based on our discussions February 19, 2015, Items 1, 2, 4, and 5 will be a Plan Revision covered under existing Stormwater Master Plan Permit No. SW8 040836. Item 3: In preparation for the future redevelopment, new drainage pipe (shown in blue) will be installed along the eastern edge of Trask Drive. The drainage pipe will be connected to the existing drainage system that conveys stormwater to Extended Dry Detention Basin #1 and the associated pre-treatment swales (Airport's existing Regional BMPs under Stormwater Permit No. SW8 050547). Based on the approved permit SW8 050547 modification November 29, 2012, the proposed pipeline and drainage area are within Paramounte's'overall basin map' (map attached with location of Item 3 shown). This system will be primarily utilized to drain the future redevelopment with the potential for minor connections to the proposed drainage inlets. The future development is anticipated to include hangars, hangar taxilanes and FBO terminal building in this area. The pipeline will consist of one manhole and five drainage inlets. The inlets will be collecting a minor amount of runoff as shown on Exhibit'B'. Due to the minor increase of impervious area (0.75 acres) draining to the existing BMP, a Plan Revision covered under existing Stormwater Permit No. SW8 050547 is being submitted for this system. APPHUVED,.A' 0 ��r NORTH CAROLINA ENVIRONMENTAL JUN 1 MANAGEMENT W v0 03CQI P� BY: ON 64 - 7 4ti- 2GIt(� cy� . Y' ._, ---_- :l-l. _- .I. . - ... ..' �.. ':.- , li \ ::' y{ .��._:-,A..-, .-."l-pl.* ...� , :I_., "- .I -4, ,..NA-,1"`,,_ , ._ .., , I..1ft.",.. -., -,.�1-� ..,: ,"�.,,:- -,.- "� , �f .-*,�:,`-4,A-:- 1"..,, "--.��:.�:-, .:.'71,-..1.-7. 4--,,--.�-.,'- .— 1�. � ..��- /,. .j.- .-"-,�. ,. b".-'..' .j� , , I"I .'. .1;" l..";/;..,.. ':: ,,/� ____";I.j_.L..-;.. .- , . _;..j;�., ..-- ._.-.. r..:-.-._ .. "--.-;, .-,'"-:1�,:.,..:' . - / -, - - ,, - �!�,._..:�- .: ll::."� _.-, ,,. � , .:� :-__I-I_,-.j..-,-1 I -_, _,_--7-� '�.—,�.7 —" -- -...,, - _I .. � -- r_�.-_' I- 'L- -�. .; .-.�_ ��-_ . _�.-1 4-:II . :. : �1I-.- 4 .4 .-i.-. _..�. ;-.. _ —� I I.., .. -_I... . .-I ._._ �. I _,".4 '_.. ._�.F. --I .., . _—v--. I_'I.- ; ,. "- - . � .- . . .4 .'.. ...... _.!..._:'...-.-....,— . -- :_..- ...__. .1 _.. , . -. If— 11 � / � /. : . L,.` �. ' I. .- . I, L. i.. . . .. , 11, - ,I ....* .. '.,- . .,..., . :.,r'_. . e S I I — ", _1- _. .,." �.-�-;_...,-- . I., �;.,� .-. I. * ,,-`._ - . �-. -"- I' , �., %;_:� tl r I i 1 '�-,-_.:,:..,:,. . ..... . t-',. - _ . ,;_-_,_-..% +00 i 1 \ ._ c.__. � .;:m.._- . �.-. ,. . . - % -,, _ -.�.z`. 7. ..,. _P... :-_, , -.l. '.� �.,.4.-:;t:I.� ...= -... -.. -� .:.::--._%. ,' I .,1% -."._. _ --*; -v .. _r- _-:.ioI wIw I I & a-," =P+-40 r2 '0 '•F b 4+00•, 5 OP-•- ':B_..- .-. �-��-. j -- j 1 ,.. -�%. I IIi � IM:.� ..... ,._Z,!:.:�,-: x :._I� -I -1} t 0' �m9+sii' F I _ 130='�� �,'. 3 :YL 1' ,I I L . .'.-,.�.,1-.:1n". , ,-;. - r;I. . I - %I.. -I.. —.-� ._. � -=.�..— _ . - ,� - I : .;.. .., . - =�—` 1 ! �" l / -3`zi 1 _ i �.. _- ! I 1. t` I Y• ti ✓. ^r /i _ �' l - 1 - -'. ¢. �' - a SF _ - ti 564 1. J' c _ - `F +3 s REMOVED 1 c ! N •' II .F ■; tee. N �, �1. �. �".. _ _ '� _ e - a x I 1 a.l - - - --.: - ... .... _ -._ :. _ :.�-. .,�.,..,.-�.,1:,.::....:....1_.,"i7.i,.. i__.l..-.. .. ___. ....... _..-. 1 . . .__. -. - . . _.._.:. - _./.: `:: A'"'t�I, I . \'\\\\'\�, Y 11'. ?" 1✓ 1 d _ - a - 4 4 .I �_ ' 1 1 26,565 SF i A- 1B ' REMOVED t �- 4 - i - .. I 1 �1 �635 Sr•t1 1 A-5 - ~d•- r i t ; <'` REMOVED' �. 1 1 t I� p�e AP 8 A-7 A-17 APB A_} ■ ! A_3 M3 ■I.i c- _ �_ �' _l!\ \ i���► _��\ i-2 _14, - - - M•,S •'A-' \\l �\\ ���� �������� \ ,� - 455 SF - .. ;.s.: a-,B AP-ta A-,s AP-, ? �' REMO G' IEI I I .. . f _ I i - — ffi i i %i - �I t1 ..-E- Y tt I 7 '_t I I - %I II : • t '' . ..... ...!... _ �.. I I I 1 _ Y I :P I i a 1 �; - - -..-. � -T "I' - Y' -T-' _ —� "[ 1 1 - --- I u _ I 1. I• i :..;> : :.. . . .. i�. J. , J� .:. ' :. . a. - - i —i - - -. — - - - - - - _ sA 1 — - t , ,I I ,� ... . i + j \'4,'559 ,., .., -�—r- - - - - i -- - - - .I. I i 1.;1 :-'. i I INSTALLED :.. I t T t f F- + :c I I a� s _ _ w_ _ _L_. E__ _ .. _ . . __ .. s_. _.. _ _-i—f_ _ _ _ q:. rr:__r._ resew_'_ ....:. , �.._ _ — 1 - - '1 -•1. - .. I-'1 �- •III i, .1.. 1 {._ ..I. ., ..'. �: i r _-lL• -- - - .-. _ .. .. .. -. I. I 'i- 1 - .. f__ - - - -r i I I i 'I .. 11."" ":• _. - -. ,- -_ -- - �.,..v..._�.i__�....__.__% - - - - - . .. - -- _, --. - - - _ - - .. .. - !'•'- - '- .11• -, �. h. 1 I i I i I :.:. : i , 1 ` r .. y ., x i _.I. .. ,. .... - _ 1.. I 'I I I" i 11 111 .. , . .. -_ - ... - - - :. - IL , . I# , I I! �, I t. t r }:• 1' 1 _ - - - - - - - - -- - - - -- .. - — - - - - - I.. i �.� - _� ` I L' i ca j I i f I i r': I , I i— I C s i.d , , : ;rr�a .,_, _:r.• G+o4 ,' .::.: • oar_ I j z+oa+©c -oo ; �+o — ; - s+a0 ! I j __ 7-Ot� E+OG 19+00 -10 00 ` 1 :ai poi H= . ^.il---=-+" ;+'.. - : F - .,_.s7.. _ . Y,.-r-••-.-_'_ -_,T_ r '_.'""'°_.'* . :,i, 1.�1.. , - •,,,I --•"ice,. •Y —�-'r' -'. ti �-9^- : r:-'„ `-'" - � '- - '-� : r" '"i- Y' k -....YTS' r'vY� '_"1 �S F I y i i� ; -T—I ! I i _ f I _ — �. . :. .. - _. _�.._ _ - •- i - — - �. I- — - . - -. - - - — - --_.. _ _t _s_. :i' -fi - - - - Y - , f - --- - - dl i I I i _ I -I 1 :1 I _ ;.. I I. • j( . . . , _� . %rt a_ — - --�--� -- — --- — — - -. -J _ --- Lr '. 1i.1. I i 1., la I i . { I t .' I YF - ,f , :. . � . � - � -�_ � :. 1_ 9 504 �S ..: s#.,, , :,:. :. j t i. � i I i\ I i {- I i _ I I: ! H INSTALLED . :11,... .. :_..ate.-_ ., e,•:: <•:•.,.•.. :r...�;':'• f i I� •j 1 .; i J: - - -•7t—'- - r - F - 11 - tl■ : I I ..f. i I _ I 1 I - M` I �? 1 I I t I I i 1'.~%s t I _ %. L I :, I' :fr.� i .s' G. - - _ F _ _ _ ` _ y 33 _ 1 �: S' r' l 1 `': _ : �.. i ' ram. :, A: p}I Ly - -$ f .r . }+ t` - - s r:' _ `` _ _ _ rs _ i-=.. -• ' ._yam — - _ w T3- - - — }' i •• ,. -- - - :•.:. 1. r- F 'S. <• 4_ =r: =i- `.a =.: .r-- 3 P, <i r` {' f "_. , f -,. z rI-!' - i1. �+ w : _: f'� ... 'i 4� . y :7 - - =a -r- .. .. • r' _ - _ ....:. «- ,.'.:: _� t _ - �� _ _ — ir: IMPERVIOUS REMOVED 564 SF (0.01 AC) 635 SF (0.01 AC) 26,565 SF (0.61 AC) 455 SF (0.01 AC) IMPERVIOUS INSTALLED 4,559 SF (0.11 AC) 9,504 SF (0.12 AC) NET IMPERVIOUS TOTAL 68,076 SF (1.57 AC) 32,453 SF (0.75 AC) 14,156 SF (0.33 AC) REMOVED PLAN REVISION PROPOSED: THE PROPOSED PROJECT HAS A NET DEDUCTION OF 14,156 SQUARE FEET (0.33 ACRES) FOR THE AIRPORT'S MASTER STORM WATER MANAGEMENT SYSTEM COVERED UNDER PERMIT SW8-040836. 40 20 0 40 80 120 SCALE IN FEET f 80, 9m. �i",I� 2 F OO@ .jE 610€ 1 z c a N a Q r N 1 S� .= _w F,xe11 or- �-n w Z 0 N > Ix z W F �- 20 Q oaZ ¢g0 .iW a� rL_ujny_Q 0 z lr z .- w - J� ¢ z0 r1-a _m oc< 53w n1 =5 NKZ¢MZ N ZoanW oz¢m z� rrWn QNW- F z _ Z O m W Z Z W O 2 Z J F Q Q H d' - J O - Z Q 2 w w I Oat. I MAY 2015 Seale ,' - Be D.— RDA Ch..k.d ABM Protect No. 3301-1303 • i ■ # # LEGEND EXISTING STORM 1 PIPE FROM RENTAL �� DIRECTION OF CAR FACILITY i PIPE FLOW # r � r * F / EXISTING 72" STORMWATER PIPE ■ =g: .. �— TO EDDB #1 CONNECT 'r I 0 3 } Z i ■ ■ ■ ■ ■ F7 m E 3. EWD CUSMMS Bu a E C Fi _ g-3 m B P'- 2 1 ;• BP_4 BP f I 1 .l 1 �• t t �•' t a 3 t f •� O —6. I .. =IL >v 1t 1 1 , �. i tlldll i 1� I I. [ Y .I I L' — _._ I i - - i I 11 J I - 1 i I ' v'r 1 f4 I x - I S 1 I� lF I. I r 1 1 • �i" '•F� 1' DONCR JL �. . FOUNDA710 I 'f • 1 1. �F 1 l 1 .i. II'F t00. 1 7 _ �S - 1 — .r, 1 a�. 1 l .. L ■ r - i• E 1. A tiRees LDj j STRUCTURE DRAINAGE AREA B-1 (MANHOLE) 0 B-2 (DROP INLET) 11,135 SF (0.26 AC) B-3 (DROP INLET) 9,026 SF (0.21 AC) B-4 (DROP INLET) 15,307 SF (0.35 AC) B-5 (DROP INLET) 19,045 SF (0.44 AC) B-6 (DROP INLET) 13,563 SF (0.31 AC) IMPERVIOUS AREA 0 4,669 SF (0.11 AC) 5,161 SF (0.12 AC) 2,976 SF (0.07 AC) 13,141 SF (0.30 AC) 6,506 SF (0.15 AC) TOTAL 68,076 SF (1.57 AC) 32,453 SF (0.75 AC) ITEM #3 TO EXISTING SCHEDULE IV : � ' �r. � •��° �. PLAN SHEETS G10 & G11 IMPERVIOUS AREA RIVE . . ADWgy�' • � - - J .Jrvi� :. t � '4 is - ,Q ��s i '��. r,,. �- �, ' 1 •iL�a: - �`" ��- � •zti C 1[ ` (N'4RDNlR �R�. -,; c`- \ i f,7 A Y% A .1 S" 5• .�. i 11 1' 1. :Q Q Q. wO I - F o r :Z o l o �•z I �r. 1 � l •z rc •w _ y~� t. .a i..L _ r r•. •.1 - I _ 7 i J:• . d — 3 KKR EpDN• aA 50�6 5 00` _ -5 ~ +UU ..fir J0 r- - _ _ I -f J. _ _ I r•t ; C (/f a I RO PLAN REVISION PROPOSED: THE PROPOSED PROJECT IS USING 32,453 SQUARE FEET (0.75 ACRES) OF THE PERMITTED FUTURE BUA ALLOCATED FOR THE AIRPORT'S MASTER STORM WATER MANAGEMENT SYSTEM COVERED UNDER PERMIT SW8-050547 DRAINAGE AREA PER INLET PER INLET _ DRAINAGE AREA 40 20 0 40 80 120 SCALE IN FEET 1 "- 80' z Z w La m r O w � as ¢dOz Ir g CL r2 aK OErzz NO z� I- <a Q.a~ a(e >3w a`'' zz amzo I �d Zo a�a -5 �a z O c� w 0 z z - 5 i- _ z wz z o Z J � w _ 1yJ Q � a F Q V _ H J O - Z 0] Q 2 W fV MAY 2015 smi. 1. �. omen REM Checked ABM Pr,o*t No, 3301-1303 41 za¢x�tmevanr 09est8L60(04iiijQkdi. I -�g-! � �a• Q NOIDMWVM vNe�l.rq �!� x smnwexv+ � xns:xmrsn aa7.vmlc'xOtt5 !ti"II d fl . �:.; C�j _._---.._ m firru Trcaa Mrnn C.