Loading...
HomeMy WebLinkAboutPages from C204741 Cabarrus Trestle Install Plan.pdff - 630 620 610 600 590 580 = 570 19+00 I 1 79+50 20+00 20+50 21+00 VERTICAL CURVE SPAN A DATA -L- SPAN B 1'-7'MIN. (+)0.4308% FILL FACE 0END BENT 1 BERM ITYP.) - STA.19+69.35 -1- 1'-0"MIN. EARTH PI = 19+90.00 GRADE POINT EL. 612.18 EL = 612.42 BERM (TYP.) BASE DISCHARGE (01003 VC = 150.00' EL. 604.4 )NT SLOPE a TOP OF 1.33 -L- [NT EL. 612.19 �O '� GRILLED EL. YR. W.S. EXP. 4" ya+' PIER / EL. 603.0 3'-6'0 (SEE TABLE)// COLUMN FIX. FI%. FIX. (TYP.) N,p4 LOW CHORD EL. 606.64 1 1 21+50 22+00 SPAN C 1'-6' TO UNCLASSIFIED FILL FACE CO END BENT STRUCTURE STA. 21+59.35 -L- EXCAVATION GRADE POINT EL. 610.53 (TYP.) BEGIN FRONT Al_ STA. 21+73.15 FIX. UNCLASSIFIED - v L STRUCTURE + EXCAVATION TO EL. 599.0 LOW CHOR -- (TYP.IV/ EL. 604.91 F :LES / 1� \\ % eD� �E%ISTING Top DRILLED0\� ��1��{�\b PIER (TYP') SUBSTRUCTURE A' PIER (SEE TAE END BENT 1 BENT 1 (TYP.) BENT 2 SECTION ALONG -L- (SECTIONS AT END BENTS & BENTS ARE TAKEN AT RIGHT ANGLES) 190'-0'(FILL FACE END BENT 1 TO FILL FACE END BENT 2) EARTH BERM EL. 601.20 0 (LEVEL) TEMPORARY o SHORING (TO X RETAIN APR FILL, STAGE 1) i TEMPORARY / SHORING ,',C.Y� (STAGE 1) 7� EXISTINi � W.P. l FILL FACE srRucrw CJ ENO BENT 1 �� STA. 19+69.35 -I- -i i BEGIN APPROACH SLAB STA. 19+45.76 J- 0 0 ID STA. TO SR 1394 �20+64.00 A21 (POPLAR TENT RD.)19+00 20i00 BEGIN FRONT SLOPE .'1 W.P. 3 0 t BENT 2 STA. 19+54.33 -L- i� �. STA. 21+02.85 L- i TEMPORARY 135' 00'-00" � W.P. ca FL BENT 1 �( SHORING (TO ��� RETAIN APP. / (TYP.) T- STA. 20+25.85 L i FILL STAGE Z) i TEMPORARY SHORING (STAGE 27 J�. J C STRUCTURENB ,(7 7 9 m ASSEMBLE BY SG CHECKED BY : MIL xm DESIGN ENGINEER OF RECORD END BENT 2 610.37 23+001 F.A. PROJ. NO. t VERTICAL CURVE DATA -L- (-)1.1187% 6 (+)0.4050% PI = 23+10.00 EL = 608.84 VC = 240.00' APPROX. �'� Te.eStCC EXISTING GROUNDLINE `- rMP4?VFOv-'S 0-"-E - Ce wE n%A-rC TOP OF DRILLED PIER ELEVATIONS DRILLED PIER NO. BENT 1 BENT 2 1-4 589.00 596.00 5-9 590.50 1 591.00 / BANK STABILIZATION (ROADWAY DETAIL & PAY ITEM) EARTH BERM- - EL. 599.22 (LEVEL) i S II RAP CLASS II CLASS B RIP RAP RIP RAP (ROADWAY DETAIL BANK STABILIZATION & PAY ITEM) BATE , Tzi & OPAY A TEM)TAIL PLAN DATE: 11-22 (STEEL PILES NOT SHOWN FOR CLARITY) DATE : 3-23 (STAGE 1) RETAIN APP. FILL, STAGE 1) STA. 21+73.15 -1- 221 N 14'-46'-44.8'W END APPROACH SLAB TO DAVIDSON STA. 21+82.93 -L- HWY 73 TEMPORARY SHORING (TO RETAIN APP. FILL, STAGE 2) -L- 3/6/20]3 SEAL 1', 029429 I HEREBY CERTIFY THESE PLANS ARE THE AS -BUILT PLANS HYDRAULIC DATA DESIGN DISCHARGE:_ _ _5.216 CFS FREQUENCY OF DESIGN FLOOD: _ _ _50 YRS. DESIGN HIGH WATER ELEVATION:_ _603.0 DRAINAGE AREA: --------------------- 30.8 SO. MI. BASE DISCHARGE (0100): ___6,454 CFS BASE HIGH WATER ELEVATION: _ ___604.4 OVERTOPPING FLOOD DATA OVERTOPPING DISCHARGE:-12.000 CFS FREQUENCY OF OVERTOPPING FLOOD: 500+ YRS. OVERTOPPING FLOOD ELEVATION:_ _609.2 OVERTOPPING OCCURS G1 STA. 23+66.21 -L- PROPOSED ROADWAY It G.�.-... STV ENGINEERS, INC. E100 eoo n•n tt.B,°xcL28202 J15 NC ❑°.R.. Number F-0991 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 23+00 PROJECT NO. B-5808 CABARRUS COUNTY STATION: 20+64.00 -L- 0 ..... CAPoLdA DEPARTMENT OF TRANSPORTATION RR Q GENERAL DRAWING FOR BRIDGE ON US 29 AND US 601 OVER IRISH BUFFALO CREEK BETWEEN SR 1394 AND DAVIDSON HWY 73 S-1