HomeMy WebLinkAboutU-2579AB permit modification 7.18.2023STA�TF w+ HOR STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER J. ERIC BOYETTE GOVERNOR SECRETARY July 18, 2023 U.S. Army Corps of Engineers Charlotte Regulatory Field Office 8430 University Executive Park Drive, Suite 615 Charlotte, NC 28262 ATTN: Mr. Steve Brumagin, NCDOT Regulatory Coordinator Subject: Request for Modification to Individual Section 404 Permit and Section 401 Water Quality Certification for U-2579 AA and AB, the Winston-Salem Northern Beltway (Eastern Section of Future I-74), from US 311 to 1-40; Federal Aid Project No. NHF-0918(14), Division 9. Debit $570 from WBS No. 34839.3.GV5. References: Section 404 and 401 Individual Permit Application requested October 2, 2017, for Winston Salem Northern Beltway from I-40 to US 52 (R-2247B Phase 2, CA, CB, CD, D, EA, EB, and EC), from US 52 to US 311 North (U-2579C Phase 2, D, D, and F), and from 1-40 Business to US 311 South (U-2579AA and AB). - Modification Application for U-25791), E, F / U-2579C Phase 2, dated January 7, 2019. - Modification Application for R-2247EB, dated June 26, 2019. - Modification Application for U-2579D, E, and F, dated October 17, 2019. - Modification Application for U-2579D, E, and F, dated November 4, 2020. - Modification Application for U-2579AB, dated December 2, 2020. - Modification Application for U-2579AB noise wall addition and U-2579AA, dated November 23, 2021 - Modification Application for U-2579AB temporary access dated February 28, 2023 - Modification Application for U-2579AA dated March 24, 2023 Section 404 Individual Permit issued for the Winston Salem Northern Beltway from I-40 to US 52 (R-2247B Phase 2, CA, CB, CD, D, EA, EB, and EC), from US 52 to US 311 North (U2579C Phase 2, D, D, and F), and from 1-40 Business to US 311 South (U-2579AA and AB), dated January 22, 2018 (SAW-2017- 02112). - Permit Modification for U-25791), E, F / U-2579C Phase 2, dated March 4, 2019. - Permit Modification for R-2247EB, dated August 13, 2019. - Permit Modification for U-25791), E and F, dated January 29, 2020. - Permit Modification for U-2579D, E, and F, dated December 9, 2020. - Permit Modification for U-2579AB, dated February 10, 2021. Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION 9 375 SILAS CREEK PARKWAY WINSTON SALEM, NC 27127 Telephone: (336) 747-7800 Fax: (336) 703-6693 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 375 SILAS CREEK PARKWAY WINSTON-SALEM, NC 27127 - Permit Modification for U-2579AB noise wall addition and U-2579AA, dated July 29, 2022 - Permit Modification for U-2579AB temporary access dated March 9, 2023. - Permit Modification for U-2579AA dated May 3, 2023. Section 401 Water Quality Certification issued November 14, 2017 (WQC004131), for the Winston Salem Northern Beltway from I-40 to US 52 (R- 2247B Phase 2, CA, CB, CD, D, EA, EB, and EC), from US 52 to US 311 North (U-2579C Phase 2, D, D, and F), and from I-40 Business to US 311 South (U- 2579AA and AB); Revision 2 dated December 21, 2017; Revision 3 dated February 7, 2019; and Revision 4 dated August 13, 2019; Revision 5 dated November 14, 2019; Revision 6, dated November 30, 2020; Revision 7, dated February 9, 2021; Revision 8, dated January 10, 2022; Revision 9, dated March 9, 2023; Revision 10, dated April 27, 2023. Dear Sir: The purposes of this modification are as follows: 1. To account for mitigation required in the permit modification for U2579AA and U- 2579AB in the USACE permit issued July 29, 2022 2. To revise Permit site 2 on U-2579AB Mitigation Requirements in USACE permit issued July 29, 2022 The USACE permit modification issued on July 29, 2022 needs to account for additional mitigation on U-2579AA and AB. Those mitigation totals are detailed below: • Section AB modification for the Noise Wall should require 15 linear feet of stream mitigation and 0.02 ac of wetland mitigation. • Section AA based upon final design and modifications at that time should have required 1.56 ac wetland mitigation for roadway, 0.06 ac wetland mitigation for utilities, and 2,042 linear feet of stream mitigation. There was no requirement for mitigation associated with the open water impacts associated with this modification of Section AA. Therefore, a grand total of required mitigation for the July 29, 2022, Corps permit modification approval should require 2,057 linear feet of stream mitigation and 1.64 ac of wetland mitigation. Mitigation for these impacts is required at a 2:1 ratio. Revisions at Permit Site 2 I have included copies of the revised plan sheet and pictures of the existing site. The additional impacts site 2 are as follows: The original plans showed impacts at site 2 for the replacement of an existing 36" RCP with a longer 36" RCP under Kernersville Road. It also allowed for an energy dissipator at the outlet of the 36" RCP. Additionally, it showed a temporary detour of Kernersville Road that resulted in 76 linear feet of temporary impacts at the site. Due to the excessive erosion that has taken place at this site prior to start of construction, restoring the temporary stream impacts are no longer reasonably feasible. The stream channel is in an erosional gulley that ranges from 10' to 20' in depth. If the detour pipe was removed when it was no longer needed for the detour purpose, we would not be able to restore the channel in a stable manner. This is because slopes at 2:1 or flatter would result in going beyond NCDOT ROW impacting aerial utility lines and impacting residential property. If the pipe is left in place, we believe that we would be able to ensure long term stability of the stream and the adjacent property. With this revision, the bank stabilization and temporary impacts are no longer needed. Revised impacts are shown in Table 1. Table 1*: Impact Revisions at permit site 2 on U-2579AB in the Yadkin River Basin. Stream REVISED REVISED ADDITIONAL Site Stream Type Impact Type Permanent Temporary Impacts Requiring ID (I/P) Impacts Impacts (linear USACE Mitigation linear feet feet 36" Corrugated -5-� 139 0 88 Steel Pipe Energy 20 22 0 2 2 ESE-S8 P Dissi ator Basin Bank Stabilization 4-4 0 0 0 Detour 0 -76 0 0 Total ADDITIONAL Impacts Requiring USACE Mitigation 90 *This table shows how the impacts and mitigation requirements were revised at U-2579AB site 2 since permit application dated November 23, 2021. The revisions at site 2 will result in a need for an additional 90 linear feet of impacts (revising the total of mitigable impacts at site 2 from 71 linear feet to 161 linear feet). In the DMS letter dated September 29, 2017, they agreed to provide mitigation for 30,834' linear feet of impacts in the Yadkin River Basin. Table 9 from the November 20, 2020 permit modification for U-2579AB and U-2579AA has been edited below to show the linear feet of impacts required as edited by this permit modification request. Since we have a running credit in the Yadkin River Basin, the 2017 DMS letter will not be revised. Table 9*: Stream Mitigation by River Basin River Basin Previously Permitted Impacts for which Running Totals (linear Impacts Mitigated Mitigation is feet) (linear feet) Requested in this Modification Application (linear feet Yadkin 23—,2-3-2 25,289 2,-0-5-7 90 2c2W 25,379 Roanoke 7,319 0 7,319 Cumulative Total 2n� 33,508 1 1,457- 90 1 32-,0$ 33,598 `This table shows how the stream mitigation requirements have been revised due to the changes at U-2579AB permit site 2 for the phased IP since the permit application dated November 23, 2021. There will be no additional impacts to threatened or endangered species because of the revisions. There will also be no impacts to Section 106 resources. Regulatory Approvals Section 404: We are hereby requesting modification to the USACE Individual 404 Permit (SAW- 2017-02112), for the above -described activities for Section U-2579AB. Section 401: We are hereby requesting a modification to the 401 Water Quality Certification (WQC004131) from the NCDWR for Section U-2579AB. We believe this work is permittable under an Infield modification with no fee requirement as there is no DWR required mitigation. However, if a fee is required, please debit WBS no. 34839.3.GV5. Thank you for your assistance with this project. If you have any questions or need additional information, please contact me at (336) 747-7802 or aeuliss@ncdot.gov. Sincerely, Amy Euliss NCDOT Division 9 PDEA Engineer Attachments: Current plan sheet for site 2 with revisions Revised Impact summary sheet Pictures of site 2 at the start of construction DMS letter from 2017 September 29, 2017 Mr. Philip S. Harris III, P.E., CPM Natural Environment Section, PDEA North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina 27699-1598 Dear Mr. Harris: ROY COOPER Subject: DMS Mitigation Acceptance Letter: U-2579 / R-2247, Winston-Salem Northern Beltway - from South of I-40 Southwest of the City to I-74 / US 311 Southeast of the City, Forsyth County The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the stream and wetland mitigation for the subject project. Based on the information supplied by you on September 28, 2017, the stream and wetland impacts are located in CU 03040101 of the Yadkin River basin and 03010103 of the Roanoke River basin in the Central Piedmont (CP) Eco-Region, and are as follows: I Stream Wetlands Stream & River CU Eco- Wetlands Basin Location Region Cold Cool Warm Riparian Non Coastal _......_..__.._-_.................. _......_......._.._._...... ...... _.____..._....._ __.... - _.....__ Riparian Marsh Impacts Yadkin 03040101 CP 0 l 0 30,834.0 4.79 0 0 _..___.... �.____ ...- ... -_._.__.............__i._ Impacts Roanoke 03010103 CP 0 0 6,414.0 1.14 0 0 "Some of the stream and wetland impacts maybe proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. These impacts and associated mitigation needs were under projected by the NCDOT in the 2017 impact data. DMS will commit to implement sufficient compensatory stream and riparian wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In -Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707-8420. Sincerely, Jams; s B Stanfill DMS'Et edit Management Supervisor Cc: Mr. James Lastinger, USACE - Raleigh Regulatory Field Office Ms. Amy Chapman, NC Division of Water Resources - Raleigh File: U-2579 / R-2247 State of North Carolina I Environmental Quality 217 West Jones Street 1 1601 Mail Service Center I Ralelgti North Carolina 27699 1601 919 707 8600 2 p '�.. :.E; . - :q.. 0 2 Z y R \� t-- �.� AAA\ F 5 r o RCP -IV \ N \ n NICK NGEL 40 m m \ CES W. POPE \ 15'� RCP -II 9 DETAIL III REGIONAL REALTY IN 5 ✓E N NGE SITE 2 TH 36" CSP W/ELBOWS BEGIN JS FEATURE DETAIL EEE NP-RAPPED ENERGY DISSII-OR BASIN m .wxm. .. o..w.,..®... PUN s4 ERIo" ENERGY DE OUR IMPACR DISSIPATOR BASIN '2D-2' JS E. EET —� ,,--, Is 9SE-S8 G F BANK STABILIZATION AT JS STREAM CLASS 11, RIP RAP EST.5 TONS 10 SY GEOTEXTILE SEE SHEET 2D-2 DETAIL 'III' �_0 ��wr NGOGT aaU-2579AB No sNE6B 511- NO NGINEER I� NO �PL�E E �PL�NNS DOLUMENT NOT CONSIDERED NAL UNLES1JS ALL SIGNATURES COMPLETEDPI ��` NC.BE.LIS Lceli N-1, F-011R8 �5 LEGEND: DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER PERMIT DRAWING SHEET 5 OF 78 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From(To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 Y4RPB 20+29 RT 30" RCP -III 0.09 < 0.01 48 1 Y4RPB 20+29 RT 4' BASE DITCH 0.10 < 0.01 76 18 2 Y4 40+43 RT 36" CSP < 0.01 51 2 Y4 40+43 RT ENERGY DISSIPATOR BASIN < 0.01 20 2 Y4 40+43 RT BANK STABILIZATION < 0.01 14 2 Y4 40+43 RT DETOUR 0.01 76 3 L 746+02 RT 54" RCP -IV 0.10 < 0.01 137 12 4 L 748+64 - 750+76 LT ROADWAY FILL 0.01 74 4A L 750+02 - 753+80 LT ROADWAY FILL 0.13 4B L 748+64 - 750+76 LT FILL IN POND 0.89 5 L 755+00 - 758+02 LT PIPE REM./ PROP. DITCH < 0.01 < 0.01 28 32 5A L 758+02 LT PIPE REM./ PROP. DITCH < 0.01 6 L 768+62 2 @ 12' x 10' RCBC 0.13 589 6 L 768+62 INLET CHANNEL FLOODPLAIN BENCH < 0.01 0.01 26 41 6 L 768+62 OUTLET CHANNEL PROTECTION 0.02 0.03 81 88 6A L 764+50 LT ROADWAY FILL 0.03 6B L 760+00 LT 6" RCP SEGMENT REPLACEMENT /CLEAN < 0.01 19 7 Y15FLYBD 54" RCP 0.02 92 7 Y15FLYBD 4' BASE DITCH < 0.01 < 0.01 84 10 7 Y15FLYBD RIPRAP PAD < 0.01 < 0.01 16 25 7A Y15FLYBD 54" RCP -IV 0.36 8 L 781+44 42" RCP -III 0.05 < 0.01 444 8 L 781+44 BANK STABILIZATION < 0.01 < 0.01 17 10 TOTALS": 0.51 < 0.01 1.44 0.07 1797 331 `Rounded totals are sum of actual impacts NOTES: im