HomeMy WebLinkAboutNCC232115_ESC Approval Submitted_20230714 GASTON COUNTY
Gaston Natural Resources Department
Soil Erosion & Sedimentation Control
Gaston County
Soil Erosion and RE: Letter Of Approval With Modifications Date: 0 8/0 4/2 0 2 2
Sedimentation Control
Program Project Name Cramer Estates Phase 1 Permit#: 3857
Responsible Person BBC Cramer Estates, LLC
CUN?' Address 7224 Jameson way
** * ** tll� City,State,Zip Stanley NC 28164
kit 2*. "lyLocation Stroupe Road
11 NSubmitted By YWH, Inc.
s46 G- Date Received: 07/06/2022 n New Submittal n Revision
Watershed Catawba Creek Disturbed Acreage: 10.14
vsORAL R� attn:BBC Cramer Estates,LLC
s
o* oca The Erosion and Sedimentation Control Plan submitted for the above project has been
NIw� eta reviewed and is approved with modifications as listed on the next page.
Lia
"ES°"1°REs 0This approval is conditioned upon the incorporation or addition of these modifications to the Plan. If
O N_ 1940 C these modifications are not included in the plan and implemented on the construction site,
4pdRTeat" the site will be in violation of the Gaston County Soil Erosion and Sedimentation Control
Ordinance (Section 18(k) and the Sedimentation Pollution Control Act of 1973. (G.S.
www.gastongoucom 113A-61.1(c))).
/departments
/Natural-Resources Please be advised that the Ordinance (Section 18(c) and Title 15 NCAC 04B.0127(b) requires
that a copy of the approved Soil Erosion & Sedimentatioin Control Plan be on file at the job site. This
CONTACT: letter is also Notice required by the Ordinance (Section 21) and G.S. 113A-61.1 of our right of
periodic inspection to insure compliance with the approved plan.
Gaston Natural
Resources Department As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice
1303 Cherryville Hwy of Intent(NOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction
Dallas,NC 28034 Stormwater General Permit.This form MUST be submitted prior to the commencement of any land
Telephone:704-922-4181 disturbing activity on the above named project.The NOI form and
additional information regarding this permitting process may be accessed at deq.nc.gov/NCG01.
Gaston County Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
Belmont quality laws,regulations,and rules. In additionm,local city or county ordinaces or rules may also apply to
Bessemer City this land-disturbing activity.This approval does not supercede any other permit or approval.
Cherryville
Cramerton
Dallas Enclosed is your Certificate of Approved Plan that must be posted on the
Dellview primary entrance of the job site before construction begins and until establishment
Gastonia of permanent groundcover.
High Shoals
Kings Mountain After commencement of this project,if it is determined that the Soil Erosion & Sedimentation
Lowell Control Plan is inadequate to meet the requirements of the Ordinance(Section 18(c)(f)and G.S.
McAdenville 113A-51 through 66), this office may require revisions to the Plan and implementation of the
Mount Holly revisions to insure compliance.
Ranlo
Spencer Mountain Please note that this approval is based in part on the accuracy of the information provided in the Financial
Stanley Responsibility Form which you have provided. You are requested to file an amended
form if there are any changes in the information included on the form. Please notify our office
Mission Statement (704-922-4181) at least 48 hours before commencement of the land-disturbing
"To provide leadership activity (Ordinance Section 8(e)).
and conservation Sincerely,
assistance to the
people of Gaston GASTON COUNTY
County to improve and NATURAL RESOURCES DEPARTMENT
sustain their soil,
water,air,plant and Jonathan Boerger: Conservationist
wildlife resources." jonathan.boerger@gastongov.com
Gaston County Erosion & Sedimentation Control Program
Pagel
Page 2
Soil Erosion & Sedimentation Control
Gaston County Plan Review
Soil Erosion and
Sedimentation Control
Program
c� GOUN
.'* *'�. tri Reasons for Approval with Modifications
`rn
' l. ;�% (1) Bypass system north of skimmer basin 3: Wrap silt fence up the apron (do
1. ' not discharge to silt fence) . A temporary diversion ditch may be needed
1$46 along the south side of the bypass to convey sediment-laden runoff to
skimmer basin 3. (2) Ensure emergency spillways are shown on cut wherever
possible. (3) Verify skimmer device for skimmer basin 1 has been sized to
dewater the basin in 2-5 days for proposed drainage areas in both EC phases.
4OURAj, (4) Back of lots 1-8 and 16-19: Additional measures are needed to prevent
c'45,0 runoff from concentrating along silt fence in EC Phase 2. J-hooks with
p G additional stone silt fence outlets would help to split the runoff and
co) 73 relieve pressure from silt fence. Prompt stabilization of pads and slopes
Reso�RRss will be critical to successful sediment control in these areas.
it) N. 'sao C.
4)P4 VMS*
www.cp stongov com
/departments
/Natural-Resources
CONTACT:
Gaston Natural
Resources Department
1303 Cherryville Hwy
Dallas, NC 28034
Telephone:704-922-4181
Gaston County
Belmont
Bessemer City
Cherryville
Cramerton
Dallas
Del Iview
Gastonia
High Shoals
Kings Mountain
Lowell
McAdenville
Mount Holly
Ranlo
Spencer Mountain
Stanley
Mission Statement
"To provide leadership
and conservation 1303 Cherryville Highway, Dallas,NC 28034
assistance to the Citizens Resource Center
people of Gaston Telephone:704-922-4181
County to improve and
sustain their soil, CC1:
water,air,plant and CC2:
wildlife resources."