HomeMy WebLinkAboutNCS000050_Inspection Report_20100809 Compliance Inspection Report
Permit:NCS000050 Effective: 11/01/06 Expiration: 10/31/11 Owner: SCM Metal Products, Inc.
SOC: Effective: Expiration: Facility: SCM Metal Products, Inc.
County: Durham 2601 Weck Dr
Region: Raleigh
Durham NC 27709
Contact Person:Jonathan White Title: Phone: 919-287-9810
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 08/09/2010 Entry Time 11:14AM Exit Time: 12:53PM
Primary Inspector:Mack K Wiggins Phone: 919-791-4200
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCS000050 Owner-Facility:SCM Metal Products, Inc.
Inspection Date: 08/09/2010 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page 2 of 3
Permit: NCS000050 Owner-Facility:SCM Metal Products, Inc.
Inspection Date: 08/09/2010 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑
#Does the Plan include a General Location (USGS) map? ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? ❑ ❑ ❑
#Does the Plan include a BMP summary? ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑
#Does the facility provide and document Employee Training? 0 ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ ❑
Comment: The facility is implementing its SPPP plan as required. The facilty is evaluating feasible
alternatives but the plan need to reference and address feasibility Part II Section A 2 (a)
feasibility study in the beginning of your SPPP plan.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment: The facilty has conducted analytical monitoring as required. The facility does not performed
any vehical maintenance.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
#Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑
Comment: Please provide a copy of documentation giving representative outfall status in reference to
stormwater outfall No. 1.
Page 3 of 3