To: NCDWR - Katie Merritt DWR comments provided in Red
From: Hannah Gadai, RES
font below by Katie Merritt 7/13/23
Jamey McEachran, RES
Subject: Carraway Bluff Phase II As -Built Comment Response Memo
Date: 7/5/2023
CC: N/A
Install sediment trap structures and prevent non -diffused flow in erosional areas off of BH2, BH3, and Carraway
Creek. The larger erosional areas will have ESPs installed to prevent further scours from forming. The ESP's will
include a combination of wooden sticks, coir logs, and haybales. The ESP will be live staked as well. Coir logs
will also be secured outside of the ESP areas on the diffuse flow paths seen leading up to the erosional areas. The
coir logs and surrounding area will be live staked. These steps will also cut back on the amount of sediment going
into the streams. This was completed on June 151n and 23rd. DWR needs EBX to take annual photos of these areas
of erosion and ESP installations and include them in the annual monitoring reports to show how they are
functioning to control sediment in the streams. If they become unstable or down cutting is observed, EBX will
need to maintain the ESPs. EBX needs to establish seeding in these areas if the seeding doesn't become
established. Add this information to the AsBuilt Report & note to add in Mon. Reports.
2. Low stem density seen on TOB of BH1, BH2, and near BH3.
The top of bank of BH1, BH2, and the sandy area near BH3 will be planted with bare roots from the planting plan.
This was completed May 301n-and June 22nd. Seeding appears to be establishing satisfactory in this sandy area
along BH3, which is good. The replanting within the sandy area near BH3 cannot be seen in the supporting photos.
Include updated photos of this area in the As -Built Report showing the planted stems with bright flagging.
3. Livestake the inside of D5 and D6.
Livestakes will be placed along the left and right banks of D5 and the left bank of D6. Livestakes from the planting
plan will be used. This was completed on June 22nd. This effort cannot be confirmed in the supporting photos.
Include updated photos of these areas in the As -Built Report showing the planted stems with bright flagging.
4. More easement markers on the previous road area.
Additional t-posts with the attached RES conservation easement signage have been placed on the old road to
further block the area. This was completed May 30tn
The deer stand that was used by Barn Owls to nest this year will be left in place to allow it to be continued to be
used as nesting areas.
Photos of the completed work have been included on the following page. Do not hesitate to reach out with any
question or comments. Jamey can be reached by email at imceachran@res.us or by phone at 919-623-9889.
Thank you,
Hannah Gadai
Ecologist
Jamey McEachran
Project Manager
res.us
Carraway Bluff Phase II MYO Maintenance Photos
Carraway Creek ESP (6/15/2023)
BH3 ESP (6/15/2023)
BH2 ESP (6/23/2023)
Supplemental planting along BH1 TOB (6/22/2023)
6d,
M..
�y
Supplemental planting along BH2 TOB (5/30/2023)
�.
Livestakes along D6 (6/22/2023)
Supplemental planting on old road (6/22/2023)
Livestakes along D5 (6/22/2023)
Livestakes along D6 (6/22/2023)
Supplemental planting on old road (6/22/2023)
Livestakes along D5 (6/22/2023)
Easement Signs (5/30/2023)
Legend
Type O °°• I,°°°°°°°°°°�
Carraway Bluff Phase I Easement
Carraway Bluff Phase 11 Easement °°°• ,��t
Stream Type �::
Intermittent
:
,°��°:O
Perennialial NW&��,
- Ditch ♦ ��° PAM,IV°°A5 P 11
Additional Easement Signage �������°�°•°• �•�•�•+•�•����:°° ° °•'
o Coir Logs
AM,
Supplemental Planting
Bareroots �:�� �:°�•
Livestakes
ESP
® Deer Stand
Culvert Treatment
Culvert (New)
® Culvert (No Treatment)
Culvert (Removal)
1OWN OAF OVA OVA IVA OWN
05
o D2-
p BH4�°°.��
O
N Maintenance Map Date: 7/6/2023
w e Drawn by: HRG pres
Carraway Bluff I & II
5 Mitigation Project Checked by:1RM
0 150 300
Wayne County, North Carolina 1 in = 300 ft
Feet Restoring a resilient earth for a modern world