Loading...
HomeMy WebLinkAbout20230973 Ver 1_ePCN Application_20230706DWR Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Pre -Filing Meeting Date Request was submitted on: 5/19/2023 SIMS # Assigned 20230973 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Reviewing Office* Winston-Salem Regional Office - (336) 776- 9800 Information for Initial Review la. Name of project: Ryan Creek Streambank Stabilization la. Who is the Primary Contact?* Cindy Lancaster 1b. Primary Contact Email: * clancaster@ljbinc.com Date Submitted 7/6/2023 Nearest Body of Water Ryan Creek Basin Cape Fear Water Classification WS-V; NSW Site Coordinates Latitude: 36.03035 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Guilford Is this a NCDMS Project Yes No Longitude: -79.80019 Version#* 1 What amout is owed?* $240.00 $570.00 Select Project Reviewer* Seren Homer:Seren.Homer@ncdenr.gov 7c. Primary Contact Phone: (336)967-7052 O Is this project a public transportation project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 401 Water Quality Certification - Express Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: John S Humble 2b. Deed book and page no.: 2c. Contact Person: Blake Strumbel (project w/in City easement on this property) 2d. Address Street Address PO Box 3136 Address Line 2 city Greensboro Postal / Zip Code 27402 2e. Telephone Number: (336)373-7665 2g. Email Address:* blake.strumbel@greensboro-nc.gov 3. Applicant Information (if different from owner) 3a. Name: Blake Strumbel 3b. Business Name: City of Greensboro 3c.Address Street Address PO Box 3136 Address Line 2 city Greensboro Postal / Zip Code 27402 3d. Telephone Number: (336)373-7665 3f. Email Address:* blake.strumbel@greensboro-nc.gov 4. Agent/Consultant (if applicable) 4a. Name: Cindy Lancaster 4b. Business Name: LJB Engineering PC 4c.Address Street Address 311 S Main St Address Line 2 Suite A City Kernersville Postal / Zip Code 27254 4d. Telephone Number: (336)967-7052 4f. Email Address: clancaster@ljbinc.com C. Proiect Information and Prior Proiect History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town Greensboro State / Province / Region NC Country USA 2f. Fax Number: State / Province / Region NC Country USA 3e. Fax Number: State / Province / Region NC Country US 4e. Fax Number: 2. Project Identification 2a. Property Identification Number: 7863315040 2b. Property size: 3.08 2c. Project Address Street Address 318 Creek Ridge Road Address Line 2 city Greensboro Postal / Zip Code 27406 3. Surface Waters 3a. Name of the nearest body of water to proposed project:" Ryan Creek 3b. Water Resources Classification of nearest receiving water:' WS-V: NSW 3c. What river basin(s) is your project located it * Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300020104 4. Project Description and History State / Province / Region NC Country US 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * Concrete channel within industrial/commercial area. Concrete has failed on one side of the channel and slabs are dislocated such that runoff is eroding soils beneath the slabs. The other side and the channel bottom also have areas with cracks. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 492 4h. Explain the purpose of the proposed project:* Purpose of the project is to repair failed areas of concrete channel. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: Project will involve demolition of failed concrete slabs on left bank (left based on looking in downstream direction) and installing and keying -in new slabs at bottom and top of bank. Prior to pouring new slabs, unsuitable soils behind existing concrete will be removed and replaced with suitable and adequately compacted fill. Right bank repairs will be relatively minor and limited to repairing cracks in existing slabs. Flow in stream is to be maintained by installing concrete median barrier covered with impervious material such as polypropylene or a geotextile and only working on one side on the stream at a time. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Comments: Since all of the project work is within a concrete channel with no floodplain access, no jurisdictional determinations were done. 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans 6a. Is this a phased project?* Yes No [j Unknown Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 3. Stream Impacts ❑ 3a. Reason for impact (?) 3b.lmpact type " 3c. Type of impact'" �3�name* ��3e. Stream Type * (?) 3f. Type of Jurisdiction* 3g. S. width 3h. Impact length* S1 Bank Stabilization Temporary Bank Stabilization Ryan Creek Perennial Both 30 Averege (feet) 202 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 0 202 3i. Total stream and ditch impacts: 202 3j. Comments: Impacts are temporary and for purposes of repairing the concrete channel. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. Neuse Tar -Pamlico Catawba Randleman Goose Creek Jordan Lake Other 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Site access/grading T Ryan Creek No 13,291 2,381 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 13,291.00 2,381.00 Zone 1 Zone 2 Total Permanent impacts: 0.00 0.00 Zone 1 Zone 2 Total combined buffer impacts: 13,291.00 2,381.00 6i. Comments: The temporary buffer impacts on the North side of the stream are as follows: a gravel construction entrance in Zone 1 and Zone 2, a staging and laydown area in Zone 1, a geotextile dewatering dirt bag in zone 1, and a silt fence in Zone 1. All of these temporary impacts are for erosion and sediment control and will be removed after the project is complete. The temporary buffer impacts on the South side of the stream are as follows: a staging and laydown area in Zone 1 and Zone 2, a drivable area for construction vehicles in Zone 1 and Zone 2, and a silt fence in Zone 1. All of these temporary impacts are for erosion and sediment control and will be removed after the project is complete. The Jordan Lake Water Supply Watershed Buffer Rules Table of Uses states that streambank or shoreline stabilization is allowable in buffer zones. Final grading for the project will return the area to the buffer topography prior to erosion and failure of the stream bank, with the intent of re-establishing diffuse flow through the buffer zone. All areas will be seeded and monitored until turf is adequately established. E. Impact Justification and Mitigation I 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Alternatives to repair using ecologically preferable materials were thwarted by site limitations and the FEMA for no increases to Base Flood Elevations in an area where structures are at risk of flooding in a 1 % annual chance storm. All impacts are temporary. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Work will be staged such that low flow in channel can be maintained throughout the project without requirement for a pump -around. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: No permanent impacts or change to channel condition. Project is for repair only. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Other SCM that removes minimum 30 % nitrogen Proposed project will not create concentrated Stormwater flow through the buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: No SWP required for the channel repair. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? * Yes No 3b. If you answered "no," provide a short narrative description. Channel repair will not trigger additional development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5d. Is another Federal agency involved?* Yes No What Federal Agency is involved? FEMA 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? iPac website: https:Hipac.ecosphere.fws.gov/ 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? https://www.f sheries. noaa.gov/resource/map/essential-fish-habitat-mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?" http://gis.ncdcr.gov/hpoweb/ 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: No Rise Certification has been submitted to City of Greensboro. 8c. What source(s) did you use to make the floodplain determination?" FRIS website: https://fris.nc.gov/fris/Home.aspx?ST=NC Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document North —Buffalo _Creek _&_ Ryan _Creek _Streambank_Stabilization_Plan_Set.pdf 14.81 MB Ryans Creek Species List_ Raleigh Ecological Services Field Office.pdf 530.48KB Ryan Creek Agent Authorization. pdf 20.27KB USGS_RC.pdf 1.02MB Soils_RC.pdf 1.53MB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Cynthia C. Lancaster Signature & t. abia"A b Date 7/6/2023