HomeMy WebLinkAbout20230959 Ver 1_SF-650020_Permit Drawings_2023.04.24_20230705Highway
Stormwater
(Version 3.00; Released August 2021)
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR NCDOT PROJECTS
pf NOiiry ci96I
WBS Element: BP1.R010.1
TIP/Prof No: SF-650020 County(ies): Northampton Page
1 of 2
General Project Information
WBS Element:
BP1.R010.1
ITIP Number:
SF-650020
I Project Type:
lBridge Replacement
I Date:
4/12/2023
NCDOT Contact:
John Abel, Jr
Contractor / Designer:
Jay Twisdale, PE (TGS Engineers)
Address:
113 Airport Drive
Suite 100
Edenton, NC 27932
Address:
706 Hillsborough Street
Raleigh, NC 27603
Phone:
252-482-1851
Phone:
919-773-8887 Ext.136
Email:
Email:
Jtwisdale(a)tgsengineers.com
City/Town:
Conway
County(ies):
Northampton
River Basin(s):
Chowan
T
CAMA County?
No
Wetlands within Project Limits?
Yes
Project Description
Project Length (lin. miles or feet):
0.092 miles
I Surrounding Land Use:
Farm; Residential
Proposed Project
Existing Site
Project Built -Upon Area (ac.)
0.3
1 ac.
0.3
1 ac.
Typical Cross Section Description:
Two 11-foot lanes with 3-foot grassed shoulders (7-feet with guardrail)
Two 10-foot lanes with 4-foot grassed shoulders
Annual Avg Daily Traffic (veh/hr/day):
IDesign/Future:
I N/A
I Year:
N/A
I Existing:
1 250
1 Year:
2020
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
The proposed project replaces Bridge No. 20 over Potecasi Creek on SR 1504 (Creeksville Road) in Northampton County.The existing bridge is 51-feet in length and has two piers
within the channel, the proposed bridge will be one span at 70 feet with no piers. Bridge No. 20 is within the Chowan River drainage basin and is not subject to riparian buffers. No
deck drains will be required on the proposed bridge. Stormwater runoff from the proposed bridge will flow to grated inlets at the ends of bridge where it will be diffused onto a rip rap
pad. All proposed stormwater runoff is discharged as far away from the creek and at the lowest velocities as practicable.
MF
et „oxrw �qo`
Hi;hWay North Carolina Department of Transportation
S Highway Stormwater Program *_
STORMWATER MANAGEMENT PLAN
(Version 3.00; Released August 2021) FOR NCDOT PROJECTS
WBS Element: BP1.R010.1 TIP/Prof No.: SF-650020 County(ies): Northampton Page 2 of 2
General Project Information
Waterbody Information
Surface Water Body (1):
Potecasi Creek
NCDWR Stream Index No.:
25-4-8
NCDWR Surface Water Classification for Water Body
Primary Classification:
Class C
Supplemental Classification:
Nutrient Sensitive Waters (NSW)
Other Stream Classification:
None
Impairments:
Aquatic T&E Species?
Comments:
NRTR Stream ID:
Potecasi Creek Buffer Rules in Effect:
N/A
Project Includes Bridge Spanning Water Body?
iYes
Deck Drains Discharge Over Buffer?
N/A Dissipator Pads Provided in Buffer?
Deck Drains Discharge Over Water Body?
INo
(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
Surface Water Body (2):
1
NCDWR Stream Index No.:
NCDWR Surface Water Classification for Water Body
Primary Classification:
Supplemental Classification:
Other Stream Classification:
Impairments:
Aquatic T&E Species?
Comments:
NRTR Stream ID:
Buffer Rules in Effect:
Project Includes Bridge Spanning Water Body?
Deck Drains Discharge Over Buffer?
Dissipator Pads Provided in Buffer?
Deck Drains Discharge Over Water Body?
(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
Surface Water Body (3):
1
NCDWR Stream Index No.:
NCDWR Surface Water Classification for Water Body
Primary Classification:
Supplemental Classification:
Other Stream Classification:
Impairments.
Aquatic T&E Species?
Comments:
NRTR Stream ID:
Buffer Rules in Effect:
Project Includes Bridge Spanning Water Body?
Deck Drains Discharge Over Buffer?
Dissipator Pads Provided in Buffer?
Deck Drains Discharge Over Water Body?
(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
7
w
0
C\
O
O
Ln
N
co
o�
L
0
/
E
E
0
o�
w
w
z
/
0
0
L
T
z
O
C\
E
0
Q
E
0
O
L
0
z
qu**)
0
H
U
O
U
See Sheet 1 A For Index of Sheets
See Sheet 1 B for Conventional Symbols
1347 1341
Bynum Deber s 1342
Rd. Mill Lake
rduroy Rd. afi~� Rd.
Co
Faison's
Old Tavern
158
P NCH 00 Conway
LOCATION East Rd. TF eer 158
Rd. 3
1500 15 8
Fire Tower Edwar 's Doolittle
Rd. Crossro s Mill Rd.
04
Creeksville 'ao�P Jekins
Rd. �, o n
0 3 hP� Qsr M i I I
Rd.
.,Lasker
Lassiter 15 01
Crbssroads
305 usty
1121 Hill Rd.
WJ Dukes Lasker 35
1502 �
Service Rd. Griffin ��Ja
Rd.
112 2 Urahaw
raswell
Rd
1118 Bear s�
Bolton 561
Rd.
VICINITY MAP
OFFSITE DETOUR
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
NORTHAMPTON
COUNTY
LOCATION. REPLACE BRIDGE NO. 650020 ON
SR 1504 OVER POTECASI CREEK
TYPE OF WORK. GRADING, DRAINAGE,
STRUCTURE AND PAVING
WETLAND AND SURFACE WATER
1 2023,504024
TO DUSTY HILL RD.
SR 1501 ,
BEGIN STATE PROJECT BP1.ROIO
—L— STA. 12 + 70-00
PERMIT DRAWING
SHEET 1 OF 5
IMPACTS PERMIT
SITE 1 4
BEGIN BRIDGE SITE 3
—L— STA. 14 + 83.88
SITE 2
Jz
SP, 15b4 $1/914A
-- TO US 158
STATE
STATE PROJECT REFERENCE NO.
SHEET
NO.
TOTAL
SHEETS
N.C.
BPI. R01 0
STATE PROD. NO.
F. A. PROD. NO.
DESCRIPTION
BP1.R010.1
PE
BP1.R010.2
PIW, UTIL.
BP1.R010.3
CONST.
±±± ±±± END STATE PROJECT BPI.ROIO
al I
END BRIDGE
—L— STA. 15 + 5 6.13
—L— STA. 18 +25.00
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES
50 25 0 50 100
DESIGN DATA
ADT 2020 = 250
o
T = 6 /o
V = 55 MPH
F U N CT CLASS =
MINOR COLLECTOR
SUB —REGIONAL TIER
DESIGN STANDARDS
PROJECT LENGTH
LENGTH ROADWAY PROJECT BP1.R010 = 0.091 mile
_
LENGTH STRUCTURES PROJECT BP1.R010 _ O.Ol4 mile
Prepared For:
DIVISION OF HIGHWAYS
113 Airport Drive, Suite 100, Edenton NC, 27932
By.
GS TGS ENGINEERS
ENGINEERS 706 HILLSBOROUGH SPH (919) 733-8887
T.
SUITE 200 CORP. LICENSE NO.:
r� C-0275
RALEIGH, NC 27603
HYDRAULICS ENGINEER
SIGNATURE: P.E.
r�oa
�� p�
Qo
rnu@i �
��
0p
-.911111111111111
PLANS
50 25 0 50 100
2018 STANDARD SPECIFICATIONS
BURKE EVANS, P.E.
ROADWAY DESIGN'
ENGINEER
P.E.
SIGNATURE:
TOTAL LENGTH PROJECT BP1.R010 = 0.105 mile
RIGHT OF WAY DATE:
MARCH 27, 2023
PROFILE (HORIZONTAL)
10 5 0 10 20
PROJECT ENGINEER
JOHN ABEL JR.
LETTING DATE:
OCTOBER 18, 2023
—.911111111111111
PROJECT ENGINEER
NCDOT DIVISION 1
PROFILE (VERTICAL)
c
0
-P
Q
E
co
0
z
0
CLIFFORD LEON GALLOWAY, JR.
& BRANDY HODGES GALLOWAY
NOTE: NO DECK DRAINS ON BRIDGE
i
i
AOD
1.51' RW
EXISTING R/W �FR EIP EIP -
X5" HDP�,
SR 1504 CREEKSVILLE RD
TO DUSTY HILL RD a 20' BST
SR 1501
18" RCP
I EXISTING RAY GR
i
i
MET SILO
PARN
DEBORAH C. LASSITER
BRIDGE HYDRAULIC DATA
DESIGN DISCHARGE =
2110
CFS
DESIGN FREQUENCY =
25
YRS
DESIGN HW ELEVATION =
56.8
FT
BASE DISCHARGE =
3485
CFS
BASE FREQUENCY =
/00
YRS
BASE HW ELEVATION =
58.4
FT
OVERTOPPING DISCHARGE =
6980
CFS
OVERTOPPING FREQUENCY=
500+
YRS
OVERTOPPING ELEVATION =
61.8
FT
DATE OF SURVEY = 04-27-22
W.S. ELEVATION
AT DATE OF SURVEY = 56.4 FT
SITE 1
WOODS
Fes—
\
\ `I
WOODS
SITE 2
INCIDENTAL MILLING FROM —L— STA. 12 + 70 TO
STA 13+05 +/— AS DIRECTED BY THE ENGINEER
—1 . .
-41 1
DEBORAH C. LASSITER
2
P/ =
13 +35.00
EL
= 62.7/'
VC
= 130'
K =
54
V =
35 MPH
r—D
Ln
EXCAVATION
LIJ
U
U
CL
E�PD
IZ
omr
ERIC. A. NORFLEET,
HELEN B. NORFLEET-SHIFLETT
& SALLY N. ROLLER,
TRUSTEES OF THE ERIC AND ETHEL
NORFLEET IRREVOCABLE TRUST
PERMIT DRAWING
SHEET 2 OF 5
('� -= SITE
WOODS:
LINE EXISTING
BANK
WITH RIP RAP
WOODS
�F
—=E&B—
F —�--
F
F
-------------------
���k�������k�
-------------
----
------
, F
_+
/6
O
o
I7
I8
/504 CREEKSVILLE RD��
P/ =
/5 f20.00
EL
= 66.50'
VC
= 220'
K =
5/
V =
40 MPH
WOODS
DEBORAH C. LASSITER
2
P/ =
17 +35.00
EL
= 6/.62'
VC
= /80/
K =
57
V =
35 MPH
20' BST
I
--I—/ 21� 111 —A� --lL --L A�
Ak
WOODS
SITE 4
INCIDENTAL MILLING FROM —L— STA. 17+25 +/—
TO STA 18+25 AS DIRECTED BY THE ENGINEER
PROJECT REFERENCE NO. SHEET NO.
BF1.R010 4
R/W SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER I ENGINEER
INCOMPLETE DO NOT USE FOR W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
TGS
TGS ENGINEERS
ENGINEERS
706 HILLSBOROUGH ST. SUITE 200
RALEIGH, NC 27603
wig
PH (919) 773-8887
CORP. LICENSE NO.: C-0275
TO US 158
F F DENOTES FILL IN
WETLAND
DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
FILL IN WETLAND
DENOTES EXCAVATION
IN WETLAND
10 11 12 13 14
15
16
17
18 19 20
CT'
0
03
L
O
C
O
w
CD
LD
CTI
10
0
10
a)
E
O
w
Cc
W
CL
10
O
-P
z
E
10
0
z
I
cv
�' -
---
PROJECT REFERENCE NO. SHEET NO.
I I I V `� / _ � ��✓ it I� �� �� --��-= �� � ✓ �
BF1.R010
4
��
_"- s ✓� ✓✓ �� �� � III SHEET NO.
PERMIT DRAWING
EET
3 OF 5
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
�
�� �� �B,
LIFFOR[� LEON GALLOWAY, JRe �� `� i i `� HELF NOR-FL—H-SHIFL� TT �
BRANE�Y HODGES GALLO�NAY �� �� �s= i / emsv
SITE
1
In
SALLY N'tO ER,
TiRUSTEES'OF THE E I A D THEL /
NORFLI/EET IRREVO&AB E RU`JT
�INCO1�IIP
L,]E E PLANS
�® N®a u�� ®� �w �c���s���®iv
NOTE: NO DECK DRAINS ON BRIDGE s`'' `�
_-� S-�IT
�I / I ��� --- ✓� I �' WOODS _-"" �� __ I �� i ✓
--WOODS �/ , "\ i s J I �� EXCAVATION
✓� _ � LINE EXISTING BANK i \ �� DOCUMENT NOT CONSIDERED
I I �✓ �I ��
FINAL
A _
✓ ( � �� ✓ WOODS / S+
1 _ ✓ -- .- ,,-< � / WITH RIP RAP i-�� �� _ SSALL SIGNATURES
A �Sn --_r UNLESS a7 {7 a7 COMPLETED
✓
✓
i I � 1 � III ✓ , I = (
/ / it ✓�� \
_� �
/ ,�
�>
'
W�
/ � --_ v ----—
i - --s4=
— 5_, � �I � 1✓ �' i � ✓ —✓ � ��_ --
--�s' �I �I I- I- �iI
.,
/
—_
=i--� - - - -- l
TGS ENGINEERS
TGS 706 HILLSBOROUGH ST. SUITE 200
ENGINEERS
RALEIGH, NC 27603
I/
✓ �✓ 1 �i / ,�i �, , I I ✓ I ���' PH (919) 773-8887
/ / / ✓ i ;T 1 MODS
�-
A �! wee/vv
/
i
CORP. LICENSE NO.: C-0275
��
�i i / / ✓ s✓-A \ -- — �— — i \ / III "--✓
I 1 \ Y��— � � i
��
/ v ull� _----_-�-- F — F F-- l�__
�' i �' �� // / �� l ✓ 1151' RW �� F I I E s /✓I _-- _-----_Ewes = ---- -----------------_ _ �_i ✓
GR FAR EIP EIN IF _ --- -- ===-- -___� _ _-�_ — _ --� -- — < i
/EXISTING R/W � �t ---__ --- _ — - --- �>
i
— — -- _
— ——
� ✓ i i -- _-- -may— I ----- [S—✓—--— �r�r� — — _-��__——'�=
— —_
�v�==-
-_=_-�--�
"--�c__� -_ ---�- ,C5" HDP- -' I2 -��-K3 —L— /4 i I�G ��"/6 b /7 I8 _____
= �= �� �y-__�I� ✓� -_
_ -
✓ II 5R 1504 CREEKSV4L€ FAD
01 _ 1504 GREEKSVILLE
--------------- - �
" `--
-�=sue i--IB--� o - ----5_---- RD��
- �� i d ��,OST "- dELS OV� _-- _,----------- 2� �T---------- ��
-- ✓��
-0 DUS Y HILL �D o --------------- —G�- B - 7
_ % \ i o —�- _--
"-
6 SR i ,- __5 ---_- -----
1501 _ �,
/ ✓ 18" RCP --- _ -- _
__--
-- - - -s -- -----� --
—
_---=— —-------- -- -
- -
\
- -- - -- - ----
-5i-------
- - _
----- -
I -5 ----
-- -- _ -----
------------ -- -
--
--_----5
-$C 11S_ 15 s
8 S ✓
--_ _ _- - ✓ i
---- _
_ _ _ R/w GR ��� �� �D�P�
1 STING ��
�\��
`�
ems, -_ � �� � ,' � II / / _�_ ,I III � � � / T � - ✓ ���
✓ l I� r -- �
_
_
r�
I �/ �/ / — A
�
II � i �I //
I --- -__ �� _ ✓l�\,��A✓✓✓ I 1 I I I I I� III �i-lll �� I ��1 I✓ �I �/ ��/ 1 �/ `�/ �// �
51tQ ;----- ss�A ---� I I I / I �V�I/ ✓ ✓ i I �� A \ t-
��
I // �fvtE� ✓v✓ ✓��I I I 111 _) I ✓ \ / 1 / / ��, I
I / �`� I �_ - _�� ✓v✓✓✓�� ;/ �, - I A A I ✓_� /I���� l� _ �`c' ��---,- i �;i i �✓ WOODS 1
I I ------- _ DENOTES FILL IN
F F
I I I Iv��_ �_— — , —_-- WETLAND
ODS
i—
✓ III I � I � � I � � I \ � V ✓ <_� - m�=— =�=�s� -- i Y'✓
� MET BARN i �✓ _� _ -- / �
�I ��I 1 ✓✓ ���_ �� 0q/ I ✓ ✓ I �✓ / %� WOODS
DENOTES IMPACTS
IN
SURFACE WATER
\ I X s 1 I \ I � v> ' �✓
co
I
� I IiII i �bEBORAH C. LASSITEW I I r �� i
�� �i �--
—
� �—'�
`'���
_ /
DERAH c" LA��ITER
� �� ` ` `—�
u>
DENOTES TEMPORARY
✓✓
�� FILL IN WETLAND
� ill � 1 �\ � ✓� ✓I I � � % ✓� � �I ✓ � �� 1 0-� // �-- ✓✓ � �\ � ) � � ' �✓ � ��� ii' � �
�
�
_�� ✓✓ �_ II,I / �� -�
� 11 1 v SS � I / � � � ✓ � = i' � -�� �c, �
DENOTES EXCAVATION
I �;
�� --',I
��� —�
,— _ `�`� i ��
'
% IN WETLAND
I/ I ,' ti
5��� i `6s DEBORAH C. LASSITER
IiI i I
I -� ✓ I I � I I � 1 1 1 s� I / �-- I ✓ ) i � l � A
I / _ > 1 ✓ r > �> �� / c> i ✓ ✓
/
BRIDGE HYDRAULIC DATA
-
- -
-
- -
-
11
11
DESIGN DISCHARGE = 2110 CFS
DESIGN FREQUENCY = 25 YRS
DESIGN HW ELEVATION = 56.8 FT
BASE DISCHARGE = 3485 CFS
1
1 00
BASE FREQUENCY = /00 YRS
BASE HW ELEVATION = 58.4 FT
OVERTOPPING DISCHARGE = 6980 CFS
OVERTOPPING FREQUENCY= 501 YRS
OVERTOPPING ELEVATION = 61.8 FT
90
DATE OF SURVEY = 04-27-22
W.S. ELEVATION2470
AT DATE OF SURVEY = 56.4 FT
Pl = 13 +35000rr-rk
= 15 f20o00
Pl = 17 +35000
1:17LijPl
EL = 62.7/'
VC = 130'
EL = 66.50'
VC = 220'
EL = 61.62'
VC = /80'
K=54
K=5/
K=57
70
V = 35 MPH
V = 40 MPH
V = 35 MPH
70
INCIDENTAL MILLING FROM —L— STA. 12 + 70 TO
STA 13+05 +/— AS DIRECTED BY THE ENGINEER
4
4
INCIDENTAL MILLING FROM —L— STA. 17+25 +/—
TO STA 18+25 AS DIRECTED BY THE ENGINEER
10 11 12 13 14 15 16 17 18 19 20
0 2.5 5 PROJ. REFERENCE NO. SHEET NO.
BP1 . R01 0 X-2
O
O
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
14+00-15+05 -L- Lt
1 @ 70'; 24" Cored Slab
0.006
0.001
0.024
Bridge
2
13+60-15+05-L-Rt.
1 @ 70'; 24" Cored Slab
0.003
0.018
Bridge
3
15+34-18+04-L-Lt.
1 @ 70'; 24" Cored Slab
0.001
0.008
Bridge
4
15+34-18+25-L-Rt
1 @ 70'; 24" Cored Slab
0.003
0.042
Bridge
14+50-15+45-L-
Rip Rap under Bridge
0.029
57
TOTALS':
0.013
0.000
0.001
0.000
0.092
0.029
0.000
57
0
0
*Rounded totals are sum of actual impacts
NOTES:
Permanent Fill in Wetlands- 566 square feet
Hand Clearing in Wetlands- 4008 square feet
Permanent Surface Water Impacts- 1263 square feet
Excavation in Wetlands- 44 square feet
2018 Feb