HomeMy WebLinkAbout20230718 YOGT CORRECTED Sketch6. Props try Size
7. Describe proposed work (include discussion onto how hardening of shoreline has been avoided. or
why it Is necessary)
Kill ItAil 1I.V41 LRI)I)l.OARI \S171'_7"'tilUJRk11\1 vim NTAtilLl!_V'Eil�
S.How will Ow was* be done? = ?CFrom Land
From Watof
9. Total amount of disturbers" below Nye nor.r►al pool lake W"M normal water level:"
>_CZ, 2,O0r
rase rest
10. Totsl amount of disturbance above the normal pool Iahm levall normal water loyal and'50 feel land-
ward:
Q wAjd ft sl oJw 00 rrl eaJraton. raa. ` Yrs10P.er
7'K Soo,
salvo be
11_ Plea" doscrtbc the ve"llon above the normal pool lade Lovell normal water level and SO feet landward to
be Impacted; &
Inuoresr of MW , to irtsuma)
ONL- YRI I itl't4A I1)FOR SlIORIt Itii S'IASIL17ATIONSil .i'rl.\( Ili 1)MIMIjs
Skobch: 4Ot,l iK, 1+ III-Ii IiRi I•rR1I
rul! I -on '
-VorrnQW
Shore
Lake
[At Fe 11 Pond/ Normal Wa nv Tavel)
alp ,s ; ND -MESS F
�—� --� N�'NI 1uk L. Dr,SYt,r�$/ia•
tkS1'No) L,ONC; RQ1d-
R�CcAvA-rae— a- 15/IR-A E
Please approximr.ely sketch tha following Information on this clan 10MV/de &Menslonsforeoch
Item, such as 10 ft x 100 ft%':
1. All proposed vegetation clearing
2. LoCatlon of rip rap or fill to be placed above the full Pond/'Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildingrt, retaining walls, docks, etc.
5. Locartion of any excavation or dredging below the Full Pond/ Normal Water Ixvel elevation
6. Location of construction access corridors
FORM: SSGP 10-20 3 Pne 3 of 3