HomeMy WebLinkAbout20230929 Ver 1_ePCN Application_20230626DW R
DHlsloo of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
April 13, 2022 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes
No
Is this project a public transportation project?*
Yes No
Change only If needed.
Pre -Filing Meeting Date Request was submitted on:
5/26/2023
BIMS # Assigned
20230929
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Reviewing Office*
Mooresville Regional Office - (704) 663-1699
Information for Initial Review
1a. Name of project:
Sunset Road
1a. Who is the Primary Contact?*
Heath Caldwell
1b. Primary Contact Email: *
heath . ca I d w e I I@wetlands-epg.com
Date Submitted
6/26/2023
Nearest Body of Water
Gutter Branch
Basin
Catawba
Water Classification
C
Site Coordinates
Latitude:
35.3165
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Mecklenburg
Is this a NCDMS Project
Yes No
Longitude:
-80.8955
Version#*
1
What amout is owed?*
$240.00
$570.00
Select Project Reviewer*
Andrew Pitner:andrew.pitner@ncdenr.gov
1c. Primary Contact Phone:*
(704)999-5279
Is this project a public transportation project?*
Yes No
1a.Type(s)of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1b. What type(s) of permits) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
29 - Residential Developments
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application? *
Yes No
fig. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Nani on recorded deed:
FH 1524 SUNSET ROAD, LLC
2b. Deed book and page no.:
401 Water Quality Certification - Express
Riparian Buffer Authorization
2c. Contact Person:
Andy Ferrell
2d. Address
Street Address
P.O. Box 681028
Address Line 2
City
State / Province / Region
Charlotte
NC
Postal / Zip Code
Country
28216
USA
Yes No
Yes No
2e. Telephone Number:
(980)721-5177
2g. Email Address:
andysferrell@gmaii.com
4. Agent/Consultant (if applicable)
4a. Name:
Heath Caldwell
4b. Business Name:
Wetlands & Environmental Planning Group, PI -LC
4c.Address
Street Address
10612-D Providence Road
Address Line 2
PMB 550
city
Charlotte
Postal / Zip Code
28277
4d. Telephone Number:
(704)999-5279
4f. Email Address:*
amber.lipsky@wetlands-epg.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Charlotte
2. Project Identification
2a. Property Identification Number:
03704301
2c. Project Address
Street Address
Address Line 2
City
Postal / Zip Code
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Gutter Branch
3b. Water Resources Classification of nearest receiving water:
C
3c. What river basin(s) is your project located in?*
Catawba
3d. Please provide the 12-digit HUC in which the project is located.
030501011403
4. Project Description and History
2f. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
2b. Property size:
56.125
State / Province / Region
Country
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: *
The topography consists of gentle slopes, with the elevation ranging from 700 to 770 ft. The northern portion of the site has single family homes with lawns and landscaping along Sunset
Road. There is a petroleum pipeline right-of-way along the eastern boundary and cutting across the southern portion of the site. The remainder of the site is characterized by pine
plantations and mixed hardwood slopes adjacent to the stream corridor.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
0.258
4g. List the total estimated linear feet of all existing streams on the property:
1806
4h. Explain the purpose of the proposed project:"
The proposed project is a residential development that includes impacts to one wetland for site grading and a road.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
Fill and grading of the site will use standard equipment, excavator, dump truck, track hoe, etc.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?
Yes No
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2019-01297
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
Nic Nelson, Heath Caldwell
WEPG
Unknown
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
This site was verified by USACE twice under different sets of WOTUS rules. A copy of the verifications are included in the Jurisdictional Determination Information section.
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries
Open Waters Pond Construction
2. Wetland Impacts
Buffers
W1
2a1 Reason (?)
Road Access
2b. Impact type* M
P �Heawater
2c. Type of W.*
Forest
2d. W. name
Wetland G
2e. Forested*
2f. Type of Jurisdicition *
(?)
Corps0.027
2g. Impact
area *
(acres)
ff-7]
Site Grading
P
Headwater Forest
and G
Yes
Corps
0.123
(acres)
2g. Total Temporary Wetland Impact
0.000
2g. Total Wetland Impact
0.150
2i. Comments:
E. Impact Justification and Mitigation
2g. Total Permanent Wetland Impact
0.150
0
V
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Impacts associated with the proposed development were limited through site selection, design, and location/orientation of the proposed lots and access
routes. Efforts of minimization were implemented during design to preserve existing site hydrology and limit adverse effects to existing, onsite natural
habitat. The road crossing location is fixed due to the entrance location requirements and alignment necessary to avoid Stream B. The applicant has
demonstrated avoidance and minimization efforts by avoiding 100 % of onsite streams and 72 % of onsite wetlands.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Construction techniques will implement approved erosion control methods to avoid/minimize impacts to onsite/adjacent offsite receiving conveyances.
Where possible, 2:1 slopes and the maximum allowable headwalls will be used to minimize site impacts.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2c. If yes, mitigation is required by (check all that apply):
DWR Corps
2d. If yes, which mitigation option(s) will be used for this project?
Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
Yes No
4b. Stream mitigation requested:
(linear feet)
4d. Buffer mitigation requested (DWR only):
(square feet)
4f. Non -riparian wetland mitigation requested:
(acres)
0.15
4h. Comments
0.5:1 due to low quality and limited connection to adjacent surface waters. Refer to NCWAM
4c. If using stream mitigation, what is the stream temperature:
4e. Riparian wetland mitigation requested:
(acres)
4g. Coastal (tidal) wetland mitigation requested:
(acres)
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program?
Yes No
N/A - project disturbs < 1 acre
2d. Which of the following stormwater management program(s) apply:
Local Government State
Local Government Stormwater Programs
Phase II NSW USMP Water Supply
Please identify which local government stormwater program you are using.
Mecklenburg County
Comments:
Storm water on the site will be handled by facilities shown on the attached plans. The stormwater plan has not yet been submitted to Mecklenburg County but will be designed to meet their
criteria.
G. Supplementary Information
0
a
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
No additional phases proposed.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
Yes No N/A
4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a
treatment plant, list the capacity available at that plant.
Wastewater generated on the site will be transported to the nearest treatment facility via sewer lines.
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5d. Is another Federal agency involved?*
Yes No Unknown
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
A threatened and endangered species assessment was conducted in which no species were identified. Habitat may occur for the Northern long-eared
bat but the project is exempt as described in the attached T&E report.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
No essential fish habitat in this region.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
SHPO's website: https://nc.maps.arcgis.com/
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?"
Yes No
8b. If yes, explain how project meets FEMA requirements:
No net grading/fill will occur in the floodplain.
8c. What source(s) did you use to make the floodplain determination?"
www.fema.gov
https:/Ipolaris3g.mecklenburgcountync.gov/
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
Sunset Road PCN - DEQ.pdf 11.5MB
File must be PDF or KMZ
Comments
A complete PCN package is attached. This will be a duplicate submission to USACE.
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Heath Caldwell
Signatuurrre�
yY 411, &44KtV11
Date
6/26/2023
O