Loading...
HomeMy WebLinkAboutNCC231805_ESC Approval Submitted_20230629 "'`�srnr ��4� fcs 'h ROY COOPER Governor ELIZABETH S.BISER `., .,,, . Secretary `," DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality June 07,2023 LETTER OF APPROVAL Superior Homes of the Sandhills,LLC ATTN: Justin Harris 120 McKenzie Mill Road West End,NC 27376 RE: Project Name: Windy Ridge—Lots 3 and 18 Acres Approved: 2.46 Project ID: MOORE-2023-071 County: Moore, City: Mineral Springs Creek Township, Address: Courtland Circle River Basin: Lumber Stream Classification: HWQ Submitted By: Moorman,Kizer&Reitzel,Inc. Date Received by LQS: June 1,2023 Plan Type: New-Residential Dear Mr. Harris: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately,a revised plan will be required(G.S. 113A-54.1)(b). As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the NOI form to Paul Clark at paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days.A$100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COG,once it is received. 3. Records of inspections made during the previous 12 months. `�- North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Fayetteville Regional Office 1225 Green Street,Suite 714 Fayetteville,North Carolina 28301 NOR'}C;ANCt.INA Dapartmettt of ErnftementalWai� ..'" 910.433.3300