Loading...
HomeMy WebLinkAboutNCC231870_(ARPA) DWI Letter of Intent to Fund_20230628 .y lifo ROY COOPER i.1®1„ ,�� . * 51 Governor 1"'4__ 1j'i .01 ELIZABETH S.BISER Secretary SHADI ESKAF NORTH CAROLINA Director Environmental Quality March 3, 2022 Louis Weatherspoon, Chairman,Harnett County Board of Commissioners Harnett County Regional Water PO Box 759 Lillington NC 27546-0759 Subject: Letter of Intent to Fund North Harnett Wastewater Treatment Plant Capacity Upgrade American Rescue Plan-Earmark Project No.: SRP-W-ARP-0009 Dear Mr. Weatherspoon: The Division of Water Infrastructure has reviewed your Request for Funding,and determined your project is eligible to receive American Rescue Plan(ARP) funding from the State Fiscal Recovery Fund established in S.L. 2021-180. Projects funded from the State Fiscal Recovery Fund must meet applicable federal law and guidance for the ARP funds. The ARP Project Grant will be one hundred percent of eligible project costs up to a maximum of $3,800,000. The first milestone is the submittal of a Bid and Design Package by August 1,2022. Please note that this intent to fund is contingent on meeting all of the following milestones: _Milestone Date Apply for all Necessary Permits* ASAP Bid and Design Package Submittal(obtain all permits) August 1, 2022 Bid and Design Package Approval December 1,2022 _ Advertise Project,Receive Bids, Submit Bid Information, April 3,2023 and Receive Authority To Award _ Execute Construction Contract(s) May 1,2023 Receive last reimbursement-Statutory December 31,2026 *An engineering alternatives analysis (EAA)may be required on certain projects. See: https://deq.nc.gov/about/divisions/water-resources/water-quality-pet liiitting/npdes- wastewater/permitting-process Q No Departmet of imal Qy I DivisionInfrastructure NORTH CAROLINAD_ 512rth N.SalisburyCarolina Street 1 633nt MailEnv Serviceronent Center ualit I Raleigh,Northof CarolinaWater Infrast 27699-1633 Department memmmenuiQuality /`� 919.707.9160 Louis Weatherspoon, Chairman,Harnett County Board of Commissioners March 3, 2022 Page 2 of 2 Failure to meet any milestone may result in the forfeiture of funding for the proposed project. Note that the Division will make no reimbursements of ARP funds after December 31,2026 The State Environmental Policy Act exempts projects funded by the State Reserve(such as this project)from state-mandated environmental review. Federal requirements may still apply. [NCGS 113A-12(2)h.] Upon detailed review of the project during the funding process, it may be determined that portions of your project are not eligible for funding. US Treasury Requirements Projects with an expected total cost of ten million dollars or more must meet US Treasury requirements for prevailing wage rates,project labor agreements, and related requirements. Recipients can either certify meeting the requirements or provide plans and reports as the SLFRF Compliance and Reporting Guidance Update 2.1 final(treasury.gov)specifies. If you have any questions,please contact Ali Ajami,PhD by phone at(919) 707-9183 or by email at Ali.Ajami@ncdenr.gov. Sincerely, Jon Risgaard, Chief State Revolving Fund Section CC: Joseph W.McGougan,PE,MBD Consulting Engineers,P.A., Conway, SC Steve Ward,Director,Harnett Regional Water,Lillington,NC Ken Pohlig,PE(DWI,via email) Ali Ajami(DWI,via email) Mark Hubbard,PE(DWI,via email) ARP Project File(COM_LOIF)