HomeMy WebLinkAbout20230015 Ver 2_Corby Scott 2 - Scope of Work pg 2_20230623PROJECT:
Corby - Caldwell
W_1:IALVII:MITA
6233 Riviera Run Est Dr
Hickory NC 28601
��611 Total Ft Shoreline Permanent
r
TB
.BANK
) Below = 0
]HEIGHT
11-3 FT
DOCK _Above = 350
N W
-- - -- �- - --) Ret Wall
I I (50 x 6) Pathwaly
301
I I Temp Corridor
Projected Zone 1
Cement 30 x 6 = 180
Pathway
(Pathway to Dock)
to 070Ck-
+2fJ
Projected Retaining I I
Wall I I Temp Corridor
— -- I _L — _ _ I—� _ I I_ , Zone 2
I 1 I I 11 20x6x2=240
I 1 1 1 (Retaining Wall)
TEMP TEMP
CORRIDOR 1 CORRIDOR 2
SIDE VIEW
Below NWL Perm Above NWL Temp Corr Zone 1 and 2
0 -
! 350 420 ---I
(20x6x2)�.tWall
(50 x 1) Ret Wall
(50 x 6) Pathway, (30 x 6) Pathway
i
j
No shoreline`impact
For Ret Wall and
Pathw# to Dock
all i *50 buffer) 113ank
Height
1-3 ft
6233 Riviera Run Est Dr
j Hickory NC 28601
Pg2of3