Loading...
HomeMy WebLinkAboutSite Inspection 05.01.23 Br 71 over Big LaurelWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20221364 TPB NCDOT - Replace Bridge 71 on SR 1395 (B-5989)Madison TPB NCDOT - Replace Bridge 71 on SR 1395 (B-5989) NC DOT Division 13 5/1/2023 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-82° 38' 55''+35° 54' 37'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted on May 1, 2023 by Kevin Mitchell with the Asheville Regional Office. No one was present during the inspection. Site is compliant with the 401 Water Quality Certification. - Temporary 54" pipe has been installed. - NPDES records were up to date. - Recommend adding more 57 stone to silt fence outlets adjacent to Big Laurel on the Left Bank Descending. - Continue to add ground cover per NPDES stabilization timeframes. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20221364 5/1/2023 Bryan, Roger D Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2