Loading...
HomeMy WebLinkAboutWQ0039597_Water and Sewer Flow Acceptance_20230623LATHAM-WALTERS ENGINEERING, INC. E CIVIL ENGINEERING LAND PLANNING SITE DEVELOPMENT 16507-A NORTHCROSS DRIVE 4/'- -- � / HUNTERSVILLE, NC 28078 March 28, 2023 NCDEQ JUN 2 3 2323 Division of Water Resources RECEIVED 512 N. Salisbury Street, Room 925L Raleigh, NC 27604-1170 N C D F 1:"-)W R/N P D E S AH 0 5 2023 Re: Village At Oakhurst (Phase II) Permit Modification Request Permit Number: WQ0039597 NCDEQ/DWR/NPDES Dear Sir/Madam: The wastewater collection system for the Village at Oakhurst (Phase II) was permitted November 3, 2017 under permit number WQ0039597. The project was originally permitted for 8076 gallons per day. As the project has developed, we have determined that the project permit needs to be revised to reflect additional flows as follows: Restaurant —146 seats @ 40 gall/seat/day: 5840 gpd 14 Retail Stores x 250gpd/store 3500 gpd Business with 70 employees x 25 gpd/employee: 1750 gpd Total Flow: 11,090 gallons per day In addition to the increased flows, it was determined that the sewer within the proposed building would not be able to serve into the previously permitted and constructed sanitary sewer. So, in addition to the increased flows, a pump station is also part of the requested permit modification. The previously permitted gravity sewer system is in place and shall remain a part of the permit. Attached are the following objects for your use in the permit modification: 1. Flow Acceptance Letter from Charlotte Water dated February 6, 2023 2. One original and One copy of the application form ASEA 04-21 3. Check Payable to NCDEQ for $480.00 4. Documentation that owner/developer is a registered corporation in North Carolina 5. FTSE for Village at Oakhurst, Phase II, dated March 24, 2023 6. Site Map (USGS) and Street Level Map 7. Original Permit Letter from NCDEQ dated December 2, 2019 8. Power Reliability Letter provided by Owner 9. Developers Operational Agreement PHONE: (704) 895-8484 MITCHO-LWENGINEER.COM LATHAM-WALTERS ENGINEERING, INC. CIVIL ENGINEERING LAND PLANNING SITE DEVELOPMENT L I 1 6507-A NORTHCROSS DRIVE HUNTERSVILLE, NC 28078 Please let me know if you have any questions regarding this permit modification request. Sincerely, Latham -Walters Engineering, Inc. Mitchell S. Latham, P.E. PHONE: (704) 895-8484 M ITCH@LW ENGINEER.COM CHARLOTTE W4)TER February 6, 2023 Mr. James Walters Letham-Walters Engineering, INC 16507-A Northcross drive Huntersville, NC. 28078 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE VILLAGE AT OAKHURST (PHASE II) 9615 BAILEY ROAD, CORNELIUS, NC. 28031 CLTWATER TRACKING# 202311 After an analysis of the sanitary sewer associated with the proposed design of project, 202311, VILLAGE AT OAKHURST (PHASE II), it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 11,090 gallons per day (146-seats x 40-gpd/seat, 14- stores x 250-gpd/store, 70-emp/ x 25-gpd/emp at the connection point(s) indicated on the submitted utility plan for transmission to the McDowell Creek Wastewater Treatment Plant; NPDES permit number NC0036277, for treatment. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. The applicant should understand that due to the involvement of other agencies and continuing growth of the water system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct or extend private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained and construction has not started within two Q) years of issuance of this flow acceptance and payment for any service connections have not been received within two Q) years of issuance of this flow acceptance letter, this flow acceptance approval shall be rescinded, and a new flow acceptance request must be made. The CAP analysis performed determines available capacity within the existing public gravity sewer system. The developer is responsible for any additional private or public sewer infrastructure required to convey flow from the proposed development to the existing public gravity sewer. If you have any questions, please do not hesitate to contact me at (704) 432-5801. Sincerely, Pedro- o ra zwre4v Pedro Galarreta BSCE, BBA / Engineering Assistant CHARLOTTE WATER / charlottewater.orct Charlotte Water 5100 Brookshire Blvd, Charlotte, NC 28216 charlottewater.org A Operated by the City of Charlotte