Loading...
HomeMy WebLinkAboutNCC220263_NOT Closeout Documents_20230619 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105 (336) 776-9800 County: Rockingham Project: Ernest Security Enhancements River basin: Roanoke Person financially responsible:Duke Energy Carolinas,LLC-Michael D Project#: ROCKI-2022-010 Robinson,Manager,Transmission Engineering Address: 526 South Church Street,PO Box 1006,Charlotte,NC 1. Project Location: Ernest Drive,Reidsville Pictures: Yes-Digital 2. Weather and soil conditions: 70's,sunny,workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: June 16,2023 9. Corrective action needed: 10. Comments: The site was inspected on June 15,2023 to facilitate a site closure.All construction and land disturbing activities have been completed at the site.Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Nate Gainer Others present: Date of inspection: June 15,2023 Time arriving on site: 2:00 PM Time leaving site: 2:15 PM CC: