Loading...
HomeMy WebLinkAboutNCC231738_Site Plan or Location Map_20230621 54.,M19 o-S ® / `-- CONSTRUCTION SCHEDULE DATE I. Obtain all necessary permits and plan approvals.Erosion and Sediment Control (EASE)permit and a Certificate of Coverage(COG)must be obtained before any land disturbing activities '!� occur.A copy of the E&SC permit,the COC and a hard copy of the plan must be kept on site,preferably in a y r r u' w permits box,and accessible during inspection. a$ permitsRo I 2. Install gravel construction entrances first,then silt fences,reinforced silt fence outlets and wattles. I / I. Finish clewing and grubbing necessary a on the Iota as they e started. "a g gm gtion ae ee00 area ey are 4 4 4 ll ll b =. . . ' �xo' c i d. Begin lot grading and excavation activities Z % $ S4AA 6 / 5. Begin or continue with house construction activities. M �` { ' os9 I/ fU hllroghgradgandhuseontruction/ ll re � J ` J r�j;0 d and takhold0 AVJ . The contractor shall conduct self-inspections of the erosion and sedimentation control measures and complete rRGA Pry �kUiWAYiNAY RO WAY LOSRO NAY JS „'/ the following combined self-inspection form fund on [he DEMLR website I uLot Plan 34 hi ps:l/files.nc.govncdnotEnergy°/2OMmeral%20and%2OLavd%20Resources/StormwetnINPDES%20 Notes: :. Lot pl. 33 General%rOPermiloIDEMLR-CSW-Monitoring-Forms-Rev-August-8-2019pdf.Twelve months ofcomplete 1.If needed.Tree Promeetion fencing shouts be installed along the buRer zone,wetland ®; inspection formsohoObekeptonSimandavailableforinspectionatalltimes Disrecommevdodacopybe boundaryendloraroundproteoeed trees,providinga radiusofatleast1.25feetforeach box.(GS 113A-541(e),15ANCAC04B0131NCGO1 Pan III Sections A andB) metI1. Self-inspections 2.Install SIII Fencethe low elevation sitles of eachlot.InstallSilt Fence out' djusted,if necessary,for plal24hours of evea.1zu 31OFFSITE \ thedeimmehait 9degIGGOI"res as signed.AllESCmoasu Noticees lbe rmination(e-NOTned as .A in SILT FENCE Ffi�ous antl hhl 0 Mhave indivitl sift T Roa I the constructiond tails on thispla Ann gauge bell be installed the project site for monitoring.ASILT FENCE OUTLET property 'vA-Lila �' SEPTIC FOR 12. Inspection and final acceptance letters.When the complete,the hall contact DEMUR to 3.Install required Silt Fence within 10 feet of rt line to ensure there is no conflict with "IF / p p project is comp permittees s CORSTRIMTNR ENTRAN septic system.It Is the responsibility of the builder to ensure the installation of sediment LOT66 I close out hoSCPIa.AflerDEMLRinf the pertineeoftheprojectcloseout,viainsp on report, CURB mnrolmeasures does not impact the septic se tallntlrepairarea(s). _ the annual general shall visit"deq.vbe charged CG01"to submit an electronic Notice of termination(e-NOT).A 5100 4.At least one Construction Entrance/Exit is to be installed per lot. OFFSITE annual general panne fee will be enargeamm the e-NOT has been rues nm. 3B6 / 5.Waste bins antl other areas tletlicatetl for managing builtling material waste shall be at _� least 50 feet away from stone drain inlets or drainage ditches unless it can be shown that / SEPTIC FOR o no other alternative exists.if this oeparefion cannot be achieved these areas must be 1 SITE \ ,rive A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY contained behind Silt Fence. S \ Y LOT 65 NCGS 113A-54.1'IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR 6.Inlets downstream of disturbances should be protected streets should be swept when �"w ♦ TS 1` I COMPLETED AS AN EXCEL SPREADSHEET. is present.eiT ltei sediment from the construction activityt. V�a AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED NC-Environmental. 0 5� \ jpeg ].Details for Silt Fence,Silt Fence Outlets,Construction Entrances end other measures am ,s ,,I{, EROSION AND - --- provided on additional sheets.Erosion and sediment control details are not drawn to scale. .CK 388 p97 SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A TYPICAL LOT LAYOUT WITH CURB AND GUTTERT� / \ NCAC 046.0131 STATES THAT-_.D000MENPAOON SHALL BE ACCOMPLISHED BY °' �7 _ may \ INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE OPEN APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, 3° x o �+ MAIL 40 / \ SPACE DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, DATE: z PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION 4-7 I EN KIOSK 67 \ CONTROL PLAN." SP�CE aw6aDa6-ta o / any Jie VICINITY MAP . / (/ 66 �o�a / 40174 to j \ . 30J`O��G / : i 4r� >'P 42 65 Q � .��� °'a°° sir z �� Mn'' .1 �x;. DATE. PAGE: / / // a. / 4' 'tom 1. p to S' S /watt 51 Sock/wattle NOTE: / / (� • 'e// Fi FLow-�z be R �mI d ,. - / i �f N- ' n.-'i_ �- 11 . 1.IC 3. n u °pro^ 1 / S sn �' vegetation.�wandoM objectionable .aftereach,nchogreater,a"fa SECTION SECTION $ • ro.; the a5 d� 10 Wa,aape• === material and properly ea drainage.cany water.asede dimdiment trap ensions shown on ,Paeanconslru.on site removeImmediately .,� or tracel pad in a condition to prevent mud or sediment from ked <o w <o daftbe. subject tealeMb a water table. thefoundabennnraaensher suitable outlet roadways. gM,,. sib Net„'" �� q) W 4 ..LNG-Envirq,manlale jpeg "w sockfwattle.Stakes should be placed at a CONSTRUCTION ENTRANCE l EXIT noraetnme Zrt's asetsgered en= or(om s °a1 NBTheight ° og t g ntl 4 Min. 5. de Ile.when UNTRENCHED IONpavement)dMB M socldwattle to hold it in ng runoff ISOMEETRICVIEW` µY MpALrLpwa ,, 1.MAINTENANCE:nspeCt nacw w a)«>concrete blocks shall be used�weekly and .� t. 60\ SODDING .I Inch or greater raInfall.Remove accumulated sediment and any debris as LAV SOD INA STAGGERED rm,Mulchor ComPOSIedsonka raaaTaaePmt P ama,.r _`� (bn";)Alt)I .m) O.0.NOT LEAVE SPACES MO DO. '^,So`" z. aaMmnMb p d as w �4110,.. �1` �� If ponding becomes excessive,the SIR Shoat now silt sa=k/M�"�^I�'� i�mi i�armi a� � anoaa.ortaMMlnM PtEeea. Wattle (>o�) c��m) l5�m) 11011 M�� • • work Area . Reinstall if damaged or dislodged. ILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION aM TNa Nmm�no aw,.Kn„ 7.s ,1.a zzs sop s m,.Wsb aUST BE. V. °„ et;:" zPm/" a.mm aha n+, nee (ze, en, dove •ue eAVaaoa.maAmo. /m/m) Hann) /m/m) /m/m) /m/m) �G 49 �aaa"=er .ANC-Envir NIA,La 3i i1001 \ mTsnM.. TIONDATE: _ _ Filter FabricPAGE' \ 150.10///‘•,‘„,/:Stealprat Pashc ore6nckfll trench \ \ Ywire Fence Wtre / ' d Compactysteel Post thoroughly \ 1111100_ ),{ IdlldWK.TOP DEKI1 OF 4' � k C� F� I56 � TAn. Wire ties ' ktezaMn 1 uoe°oe GROUND STABILIZATION 2:____, 1 / wTnmesor NaAPPEARANCE OFAGOOD 50D 11,81_1611E, Hrs- aM `re t k 4 I SITE AREA STABILIZATIONr 11 al DESCRIPTION TIME FRAME EXCEPTIONS (EN ���������1�����d���� za [amwnaa...ward s eR o PERIMETER DIKES, 7 DAYS NONE 55 \ $PACE °FNeF�mmr SWALES,DITCHES 53 \ 20 \I ( / F Fabric the on &SLOPES 14 c..aw.„_ osssEcr :.- a�ma.xm. n..a,,,.mmem. NVEwHIGH QUALITY 7 DAYS NONE _110!!11111Ijl' \ \ ,�bc 1 c...wmm.. -" ro" """"' WATER ZONESWt ,.y,..w.w. ,..w.+ ,..4....e.b.aa�..U,w,aen.W� ( Q ) s..n.m. sn.- rw,..ma.==wan eewmn�,wsro... a 62 re - - n..dnaw. '.a - - M1mm.am.y SLOPES STEEPER 7 DAYS IF SLOPES ARE /11 \ 19 �� /� General Erosion Control Notes .....,..,.m..me w p.emm..e m,,.:.m .nitre fmw.ra«eaaaw...d ' THAN 3:1 10'OR LESS IN / \ \ �� 1.Only the are shown shall be disturbed. m M n raa evaftv,vek. "a"'" LENGTH AND ARE - .a,a.m.p.aparwmm. "� .n - ma.s.wme ndwa,. I cO 2.All disturbed S 7..,.a,..wn... NOT STEEPER tic �,M,, P.m..... % pemanen areas fa as postl be s ble grassed and °a..m ,,,.:aTn p.w..mm.berm..M..w,nM.m THAN 2:1, 14 mulched as soon and maintained 1o.Da mtaa«ne Naunetna. ° DAYS ARE ' qZ ALLOWED ��, 12; z nett t cover s established. SLOPES 3:1 OR 14 DAYS 7 DAYS FOR Sea FLATTER SLOPES GREATER / - M \ THAN 50'IN I ( ANC-Envo-e„nm,ml.jpey SILT FENCE LENGTH \ \ FFFFCTlvr Flp,1 Lunn, ALL OTHER AREAS 14 DAYS NONE(EXCEPT WITH SLOPES FOR PERIMETERS FLATTER THAN 4,1 AND HOW ZONES) 14 115 I116 DATE: PAGE: / /. \ ` \ ewe .� son - PAGE 1 of 2 /• TOTAL DISTURBED ACREAGE: 1.20 ACRES LOT EROSION CONTROL PLAN TOP OF SILT FENCE ‘ LOTS 34 35 TABOVE HE WMUST ASHED / WALTERS /STEEL FENCE ST . • EN 7.- - MEADOW • HARDwAREEm,R FRONT VIEW SPAOk ,,. BURY WIRE FENCE,FILTER FABRIC, MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION FOR WASHEDSTaSET MA%MIN.'S.INTOFENCE aHINTRENaHAND HARDWARE DREAM FINDERS FILTER GROUND General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be OF c6ouue relocated on the lotto insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. HOMES, L LC �8�m1.Hardware cloth a.gravel should overlay the sill fence et least 12 Inches. d on low ete.aann areas of fence and Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all °0, conditions. objectionable materials spilled,washed,or tracked onto public roadways. QUEWHIFFLE TOWNSHIP HOKE COUNTY Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure SCALE:1"=100' MAY 2023 1.Per NCO-01,inspect outlet at lest once a week and after each 1 in.euar WIRE FENCE AND HARM CLOTH y that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. ntTERFABRICI Z...5'ra 'nu1P9- Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE a.Keep mesh free ofdebris oH�Mee adequate Pow. s 100 0 50 100 200 400 and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. 4.Remove sealment when stone outlet Is covered. 5.Rep00e stone as..ea to faclotM.de-waterlrs. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be = MMI SECTION VIEW repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. ..\NC-Envir enMG.)sey Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) Fri- SILT FENCE OUTLET sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 ft Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:5/10/2023 11:33 AM LAST PLOTTED:5/10/2023 11:39 AM PLOTTED BY.Dennis Gilbert nceooge:G\CURRENT JOBS\H.H CONSTRUCTORS\23-1367-02 WALTERS MEADOW-EC\PLANS\WALTERS MEADOW EC-LOTS 34 k MD.