Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1--03757_Well Construction - GW1_20230602
WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1.Well Contractor Information: AA i >,14>yYAT,ER37��NE$a,V� Well Contractor Name FROM ft. TO DESCRIPTION L yp ft. A ft.. ft. NC Well Contractor Certification Mimber t15 OLCI7ER C'11SING!Co` mOXfi=c652davells c'�R liI1�lE1T if a"`11cabIE ' y^ s�a folAt L p FROM TO DIAMETER THICKNESS MATERIAL ft '� 9 ft' in. e ! `b �! Company Name V 16;S1NNER;CASINCiOR�TIH(Fotheruiclofredtlao 2.Well Construction Perm p�it# FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(Le.UIC,Couno;State,Variance,etc.) A R In. 3.Well Use(check well use): ft, ft. in. CSC I771!17»>= ._.aR a,;a.)r:•r..`; Water Supply Well: FROM TO I DIAMETER SLOTSIZE I THICKNESS MATERIAL ❑Agricultural ❑ unicrpal/Public ft. ft. in.- ❑Geothermal(Heating/Cooling Supply) residential Water Supply(single) ft. ft. ❑IndustriaUCommercial ❑Residential Water Supply(shared) z18t RU[.--T ❑Irri ation ❑Wells>100,000 GPD FROM TO MATETAT -- EMPLACEMENTMETHOD&AIMOUNT Non-Water Supply Well: o it. �� it. �` ❑Monitoring ❑Recovery ft. ft. Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 419';StANA/G IZIN,11 erlf It`a"f call e t ` ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM To MATERIAL EMPLACEMENTMETHOD ❑Aquifer Test ❑StormwaterDrainage ft. ft. ❑Experimental Technology ❑Subsidence Control ft. ❑Geothermal(Closed Loop) ❑Tracer OE]Jtr 1iRITT1IN.G t U atricli'addfEiouaTs�t ets icnecess"" i. .;c. ::s r,.,s. : ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM To DESCRIPTION color,hardne solVrack tour,site eta) 0 • J rt. C. y f S'Q V1Cl. 4.Date Well(s)Completed: A d d•+J Well ID# I so rt. • - .10.ft-] J , f4_ ro G K Facility/Owner Name Facility ID#(if applicable) ft. fL 2 r N"©u aG fc. rc. Ur. ft. ft. 1rtyG:T•y.:. a P}ty�et`;'cail Adclnc,;,('.ity anrl7..i- ..�C.l jN County Parcel Identification No.(P12,1) 5b,Latitude and longitude in degrees/minutes/seconds or decimal degrees: 1 1 (ifwell field,one lat/long is sufficient) 22.Certification: 1 Signature of Ceitified Well Contractor Date By signing this form,l hereby certify that the wells)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or V o ISA NCAC 02C,0100 or 1SA NCAC 02C,0200 Well Construction Standards and that a copy Ifthis is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner, repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled:. 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface:... -- t�0 (ft.) ,::�::_„.�,r.,••,,,•,_�.,:e::,R :.� _'••" -._.._ r:�•:-:::r:.-. .. .. . .. . .. ........ ---- - -.. _ .. ---- -- - - - - -- - - - 10.Static water level below top of casing: �® (ft,) 24a. For All Wells: Original form to Division of Water Resources (DWR), Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 1f watt•level is above casing,use op 11.Borehole diameter: �/ (in,) 24b.For Injection Wells: Copy to DWR,Underground Injection Control(IUC) �J Program, 1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: Q(f' char/ 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed -FnP WATRP CTTPPT V WR-T A ONT,V. - - �__ ___ __- 13a.Yield m Method of test: b l o� Permit Program,1611 MSC,Raleigh,_NC 27699-1611 (l;P ) 13b.Disinfection type: Amount: a 5 16 5- Form OW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018