HomeMy WebLinkAboutNCC231639_Site Plan or Location Map_20230619 r
0- r 1 See Sheet to For Index of Sheets SHEET TOTAL
See Sheet 9B for Conventional Symbols 1T'® OF STATE STATE PROJECT REFERENCE NO. NO. SHEETS
"III fL �T/j� �(� T.T. SM-5705S/HL-0041 1
/lig* Acaglem St `L �/ UAY V' ARINA STATEPROT.NO. P.A.PROLNO. DESCRIPTION
O St
em N 48263.1.1 N/A PE
42 Pcad N KN�*S ER 48263.2.1 N/A ROW /UTIL.
0 -- '" •R 48263.3.1 N/A CON.
M Fuquay V, s AaI`rJ4T44J71 C (J1'Jl'1.7 o ¢ I '_, Qa< C! \as,
�i
cc o i oP ui `\
/..__¢ BEGIN L. ._
• PROJEC C s� 6 LOCATION: US 401 (MAIN ST.) AT SR 2768 (JUDD PARKWAY) + .���m� ' it
SR 2768 •/;, �� a' AneAgop E ■1,11 cO
qto Ci
III ° ® • DRAINAGE, GRADING,PAVING SIGNALS � ����r��� ��� '�i TYPE OF WORK. G , G G, V G & S G S yr1i�f V41L ��j
I' ; -r �.
• v• ex tv I ' i� \" END — — —
IC i A PROJECT ! I
1 1114141111,44141Tio..4.,\-,-
all ,I N /
I,
F P 1
V ��
1W VICINITY MAP
� END TIP PROJECT SM-5705S
O -L- Sta. 29+17.24
BEGIN TIP PROJECT SM-5705SIa
pi:, -L- Sta. 9+00.00 I4
END CONSTRUCTION I m
—Y1-72+60.00
5__,_
, --.11r--TO 1VC 42 --_ o
-� _ 1 3/-? D68(JUDO PKWYI _
�r -- _ --—
END CONSTRUCTION
1 —L—30+30.23
BEGIN CONSTRUCTION I L I
—Y1—/0+30.00 I 3
0
I
I
i_
C * SIGNAL UPGRADE
-o (' • THIS PROJECT IS WITHIN THE FUQUAY—VARINA MUNICIPAL BOUNDARY
}T V GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared In the orrice or: Plans prepared for: HYDRAULICS ENGINEER
DIVISION OF HIGHWAYS TOWN OF �:'F55/a':;rss.
ADT 2022 = 11,500 ; -
50 25 0 50 100 TOTAL LENGTH OF T.I.P. PROJECT SM-57055 = 0.382 Miles 815 STADIUM DR.,DURHAM NC,27704 FUQUAY—VARINA SEAL ;
o ADT 2040 = 18,000 134 N.MAIN ST. 048034 +
•1 11 FUQUAY—VARINA NC,27526 CsaoFec33cv�aso_. •
,�• OjNE•••`,,•
LOh—
PLANS 2018 STANDARD SPECIFICATIONS Q °F N 0°``
V = 50 MPH STEPHEN R. DAVIDSON PE TOWN CONTACT: SIGNA'/URE: PE 06/27/2022
o°o 50 25 0 50 100 ROADWAY DESIGN ENGINEER F U Q U A Y-V A R I N A
o�w12: THOMAS R.MEADOWS MATHEW B. POLING, PE 0 CAkp north Carolina
(Ni az PROFILE (HORIZONTAL) PROJECT DESIGN ENGINEER I.:.; , , ;: u; 24�oFE55io•.;m
FUNC CLASS = '-'1 I
0.Ow O 10 5 0 10 20 : 046017 _47
o; L■ ■J MAJOR COLLECTOR RIGHT OF WAY DATE: LETTING DATE: 'U"`'NGINE:p''`�.` DOCUMENT NOT CONSIDERED FINAL
�� V REGIONAL TIER N/A AUGUST 2022 SfcPluu K.Dd ek '''•,.,,, ,,,, P.E. O6/30/2022
PROFILE (VERTICAL) UNLESS ALL SIGNATURES COMPLETED
� � / CzF