Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20230840 Ver 1_Shoreline Stabilization_20230612
ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA State of North Carolina Environmental Quality Department of Environment Quality Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, Fed Ex, etc.) Paul Wojoski Paul Wojoski DWR-401 & Buffer Permitting Branch DWR-401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pry Filing M Request to this application. REECEMD Date of Pre -filing M g Requ t: _/ (required) JUN 1 2 2023 DWR ID # Vers (if applicable) DEQ-WATER RESOURCES 401 & BUFFER PERMITTING A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Mailing Address: Telephone Number: E-mail Address: v Lexington NC 27292 L!,w i polon NG a- A-I- 773-682-4055 Fax Number: JJ North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh. North Carolina 27699-1617 919.707.9000 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www saw.usace.armv mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: N/A Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Rowan Nearest Town: Salisbury Lake/ river/ ocean adjacent to property: High Rock Lake Property size (acres): 0.65 acres Subdivision name or site address (include phase/lot number): Lot 49 Anchor Downs 850 Mainsail Rd., Salisbury, NC Directions to site - please include road names and numbers, landmarks, etc.: 1-85 to Long Ferry Rd exit east on Long Ferry Rd. R on Hedrick Lambe Dr., L on Mainsail Rd., Property is on the right Latitude (in decimal degrees) 35.39.20 Longitude (decimal degrees) 80.18.53 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Undeveloped lake front parcel FORM: SSGP 09-2020 Page 2 of 6 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 7. Will work be conducted from land? ® From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 230 sq. ft. Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 470 sq. ft. Temporary impacts (temporary clearing, construction corridor) in square feet: 575 so. ft. 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): No trees will be removed to install the proposed shoreline stabilization. 11. Signature By signing below, I, as the project proponent, certify to the following: The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time 5-23-Z3 x Owner/Agent's Signature' (15A NCAC 02H .0502(f)) Date 'Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation FORM: SSGP 09-2020 Page 3 of 6 d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation La ke (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level w • • Shoreline Plan View Lake W Fei vo�ei num.i vrner) Existing Dock ixn.7e FORM: SSGP 09-2020 Page 4 of 6 FORM: SSGP 09-2020 Page 5 of 6 3 ft. below full pond water level 4 ft. above full pond water level ft• additional clearing • ff necessary Existing bank 10 ft. bank a height O�Z FORM: SSGP 09-2020 Page 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Tanya Rodriguez Lot 49, Anchor Downs STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 115 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope = (115') x (1') x (2) = 230 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 35 LF of Shoreline = 1 ft. Above Normal Pool Estimate 40 LF of Shoreline = 2 ft. Above Normal Pool Estimate 40 LF of Shoreline = 3 ft. Above Normal Pool Area of Impact = Length x Height x Slope = ( 3 5' x 1' x 2) + ( 4 0' x 2' x 2) + ( 4 0' x 3' x 2 ) = 70 + 160 + 240 = 470 sq. ft. Impact From Construction Above Shoreline Stabilization Assume 5 ft. Wide Zone Area of Impact = 115 x 5 ft. = 575 sq. ft. Total Area of Impact Above Normal Pool Level = 1045 sq. ft. Rip W Of 3� M 242 �x t sTi ►� G I�t P fzA P T 'N SCALE 1 " = 40' SITE PLAN - TANYA RODRIGUEZ VEGETATION AND EROSION CONTROL FABRIC cVl=lkln rlonnr CLASS 2 RIP RAP EROSION CONTROL FA 0�� LAKE ----- BOTTOM TYPICAL CONDITIONS 36" TO 72" ERODED CUT WAVE EXPOSURE FOR: TANYA RODRIGUEZ LOCATION: LOT 49, ANCHOR DOWNS RESERVOIR: HIGH ROCK LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: DETAIL MODERATE RIP RAP STABILIZATION 1 3 , � �' '� j �' � t •ski, ;,i •. K a r • 9e f r r� a , 4 :. y .+... .74 v it r i 6/6/23, 1:10 PM 850 Mainsail Rd - oogle Maps Go gle Maps 850 Mainsail Rd 'U v I Dukeville I Smiley s `/ Hock Uutcloorst.► PCAiSalisbury/� i Heridux Barbecue 4'ltnprw.'.q' bi 111 i coo Spencer, n"`n,.,, Feezor .I Budd - ek Swim Atea East Spencer Q' Golden Pond T Campground `Keawi TrcaQ Mooaa l,r '°- FrIll Sou thmont F-71 L'"-� Camping Grou � L a F f Cal $ Heroes Car Wash FQ I utky Puppy KrrnrI' • © F r Rt.,Iaurar, ;rmonlbpv Woodbine Cal _ i Mountain Vieµ Baptist Church Dan Nicholas ,4, C Park i ,riless Gull Course ® © r r,',� •r,,,, k.,('�P Duns Mowlta,, Park© ' Re I Ccof i r s_ and n .iru Go, gle �•ePark© - n Bakers Mil Qr Map data 02023 1 mi httpsJlwww.goo.qle.com/maps/place/850+Mainsail+Rd,+Salisbury,+NC+28146/(d)35.663396, 80.3370091,13zldata=!4r�6!3m5! l sOx88538fa9fc477471:Oxfe2Of46aabcl d5f4!8m2!3d35.65565!4d-80.3152... 1 /1