HILLCREST SUBDIVISION
CONSTRUCTION PLANS - PHASE 2
SHEET INDEX
FRANKLIN COUNTY, NORTH CAROLINA MOST CURRENT
SHEET NO. SHEET NAME REVISION DATE
•
C1.0 EXISTING CONDITIONS PLAN 02/07/2023
C2.0 OVERALL SITE PLAN 04/13/2023
C2.1 SITE PLAN 04/13/2023
C2.2 SITE PLAN 04/13/2023
C3.0 OVERALL UTILITY PLAN 04/13/2023
C3.1 UTILITY PLAN 04/13/2023
C3.2 UTILITY PLAN 04/13/2023
2023 C4.0 OVERALL GRADING PLAN 04/13/2023
FEBRUARY 7
C4.1 GRADING PLAN 04/13/2023
REVISED APRIL 13, 2023 C4.2 GRADING PLAN 04/13/2023
C5.0 OVERALL EROSION CONTROL PLAN-STAGE 1 02/07/2023
C5.1 EROSION CONTROL PLAN-STAGE 1 02/07/2023
C5.2 EROSION CONTROL PLAN-STAGE 1 02/07/2023
C6.0 OVERALL EROSION CONTROL PLAN-STAGE 2 04/13/2023
C6.1 EROSION CONTROL PLAN-STAGE 2 04/13/2023
CLIENTC6.2 EROSION CONTROL PLAN-STAGE 2 04/13/2023
C7.0 POND DETAILS 04/13/2023
P2 PLAN AND PROFILE-ROAD B 04/13/2023
ARS HILLCREST DEVELOPMENT, LLC P2 PLAN AND PROFILE-ROAD F 02/07/2023
VICINITY MAP OWNER CONTACT: MR. HAMPTON SMITH P3 PLAN AND PROFILE-ROADG 04/13/2023
PS PLAN AND PROFILE-OUTFALL 04/03/2023
Y' '.� ,. .. P4 PLAN AND PROFILE-ROAD D 02/07/2023
=�' f��� �-14� 1524 CANTERBURY ROAD Dl DETAILS 02/07/2023
ilL A �,11111.
;'` RALEIGH, NC 27608 D2 DETAILS 02/07/2023
�- PHONE: 919-333-5640 D3 DETAILS 02/07/2023
D4 DETAILS 02/07/2023
' EMAIL: HAMPTON@CANTERBURYCONSTRUCTION.COM DS DETAILS 02/07/2023
D6 DETAILS 02/07/2023
MN D7 DETAILS 02/07/2023
DB DETAILS 02/07/2023
i/ jilt*
.�/ D9 DETAILS 02/07/2023
l , R/W 50.0'ROW RrW D10 DETAILS 02/07/2023
Dll DETAILS 02/07/2023
SETBACK SETBACK D12 DETAILS 02/07/2023
(VARIES) 5.0' 11.5' 2.5' 11.0' 11.0' 2.5' 11.5' 5.0' (VARIES) D13 DETAILS 02/07/2023
_`� Limil.":triltaillt,tiktitLititiliolizkyr
UTILITY UTILITY _ ss' S.0' UTILITY11 ESMT. STRIP ESMT.
1� - 2.0%� DL1'lll ,.AL- - 2.0% 2.0% / SEE NOTE4
. � 44
_•��� *SLOPE
/I _ O 4 • '''�� SEE NOTE *SLOPE I��n' CONCRETE SIDEWALK REVISIONS
(SIDEWALK ONLY ON ONE
Allil1,�MR F 30"ROLLED 30"ROLLED SIDE OF THE ROAD-REFER REV NO. DESCRIPTION DETAILS REVISION DATE
�� r't ��1�li Q �` C&G C&G TO SITE PLANS) 1 REAR STORM DRAINAGE REVISION REMOVED DI AND PIPE FROM BEHIND LOT 71 AND DITCHED RUNOFF INTO POND. 04/03/23
�.I♦ V
�� ,ii��.1.`. �:�/ij SITE) 111„III�j� , �I.1 LOCAL RESIDENTIAL STREET CROSS SECTION ADDEDRIPRAPOUTLETPROTECTIONTOFESINTOPOND
Ilq
50'RIGHT OF WAY 2 SD DRIVEWAY CONFLICTS REVISED STORM DRAINAGE CB LOCATIONS IN STREET G TO MINIMIZE DRIVEWAY 04/13/23
,� �����, %�'111IIIIII� ., 27'BACK TO BACK
' '�1''` 11�',, CONFLICTS
iten1. •41.41,1/ its :42
1e+.4i4t/4:10 MA �4/10:. PAVEMENT DESIGN *TERRAIN MAX SLOPE.
1-1/2"59.5B.
ii� .�.I11/14111 6"1011111 I: Nu 1-1/2"59.5E DELAY OVERLAY LEVEL 2:1
.
``,`.1.1 ill/j'1,'.�� Hl((RDft "ABC
4"MIN ABC UNDER C&G HILLY ROLLING
2:1
1-1/2:1
41 %WI"
GENERAL NOTES
1. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE NCDOT AND FRANKLIN COUNTY STANDARDS AND SPECIFICATIONS.
rev 2. CONSTRUCTION DRAWING APPROVAL IS REQUIRED BEFORE CONSTRUCTION OF THIS PROJECT MAY BEGIN.
3. THE CONTRACTOR SHALL CONTACT"NORTH CAROLINA ON CALL"AT 800-632-4949 FOR ASSISTANCE IN LOCATION EXISTING UTILITIES.CALL AT LEAST 72 HOURS PRIOR TO
ANY DIGGING.
IMO,
♦ 4. CANOPY STREET TREES SHALL BE PLANTED BETWEEN THE UTILITY EASEMENT AND FRONT SETBACK EVERY 40'AND ON BOTH SIDES OF THE ROAD.SELECTION AND LOCATION ,OF TREES SHALL CONSIDER EXISTING AND FUTURE SITECONDITIONS.EACH CANOPY TREE SHALL BE CHOSEN FROM APPENDIX II OF THE FRANKLIN COUNTY UDO AND HAVE A J<NCA ROY- MINIMUM OF 2 INCH CALIPER AND A MINIMUM HEIGHT OF EIGHT FEET FROM THE GROUND SURFACE.EXISTING TREES IN THE FONT YARD SETBACK WHICH MEET THE ��,=O �TrS".6v19,,�:
17 ' ` MINIMUM SIZE SPECIFICATIONS OF 6.2.1 AND 6.2.2 CAN BE SUBSTITUTED TOWARDS MEETING THE PLANTING CRITERIA PER ZONING ADMINISTRATOR. E¢( The Nay Company
SCALE: 1" = 1500E ▪ 3▪ DA9 L '
Consulting Civil Engineers
4,14."�W,P PO Box 810 I Rolesville,NC 27571
'''„ 04/13/2023 919-4.35-6395
NCBELS License P-0751
PRELIMINARY DRAWING-NOT RELEASED FOR CONSTRUCTION J