Loading...
HomeMy WebLinkAboutSW8881011_HISTORICAL FILE_20220824STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 g g 1 o t i DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2022D32-4 YYYYMMDD �T Burd, Tina J From: Burd, Tina 1 Sent: Monday, August 15, 2022 10:48 AM To: Barraco CIV Talia M Subject: SW8 881011 - Remoted Piloted Vehicle Maintenance Shop Bldg. 1747 The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 10, 2022. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 D Q> Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Website: http://deg.nc.gov/about/divisions/energy-mineraI-land-resources/stormwater Based on the current guidance to minimize the spread of COVID-t9, the Department of Environmental Qualit11 has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely of arc on staggered shifts. 1b accommodate these staffing changes, all DEQoffice locations arc limiting public access to appointments only. Please check with the appropriate staff before visiting our r offices, as we may be able to handle yourequests by phone or email. We appreciate your patience as we continue to serve the public during this challenging tune. Non -Transfer Application Completeness Review Checklist Project Name: kenwrr tl R-6 Ttb VE:i. MAIAT 540PI 7 Project County/Location: 0A]SL.0 C.:3 Permit Action: New New Permit p2: Not located in the ETJ of the following delegated Date Delivered to WIRO: Q /D 2 BIMS Received/Accepted Date: 8 ID 022 Date Given to Admin: RIMS Acknowledged Date': and functionin¢ programs: NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach Bruns: Leland / Navassa (?) / Oak Island Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City Major Mod / Minor Mod / Renewal Applicant & Permittee are the same?' Permit Type: HD LID / LD Overall / HD &LD Combo ^?, General Permit / Offsite / Exempt + Redevelopment Development Type: Commercial/ Residentia ther Subdivided?: Subdivision or ImaleLot Existing Permit p: Expiration Date°: S L.)rc� .C3 b I O ( O E�Off site to SW8: F-1I5 Offsite Lot approved in Master Permit?s Rule(s): u2017 Coastal LJ2008 Coastal u1995 Coastal ElPhase II Universal 1988 Coastal Permittee Type & Documents Needed: Property Owner(s) Purchaser Lessee =HOA ODeveloper =Viable?EDViable? Viable? =Viable? Viable? Deed =Purchase Azmt =Lease =Election Minutes Paperwork - ©Application ©Fee: F-1$505 (within 5mo) Check#(s): tj I.e�g ONo Fee FISupplement2 (1 new form orfor older forms.: 1 original per SCM) FIO&M, Soils Report (Infil or PP) Calculations (signed/sealed) Deed Restrictions, if subdivided' Project Narrative FJUSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N Plans (2 Sets) NOTES: 'Enter RIMS Acknowledged Date on this Sheet 'For New Projects -Enter New Permit p on Supplements & Deed Restriction Templates. a If permittee is different, STOP. Needs to be transferred first. °If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first. slf Lot not approved in master permit, STOP. Master permit needs mod. EMAILED ENGINEER DATE: REVIEWER NAME:r-j[ Comments: G:WQ\\\Reference Libra ry\Procedures\Checklists\Completeness Review Checklist 20210908